Q KANSAS GAS AND ELECTRIC COMPANY THE ELECTRtC COMPANY QLENN L. MOESTER vra passectNr. hucLaan | |||
. October 8, l'984 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. | |||
20555 KMLNRC 84-180 Re: | |||
Docket No. STN 50-482 Subj: Wolf Creek ASLB Initial Decision | |||
==Dear Mr. Denton:== | ==Dear Mr. Denton:== | ||
Per the request of the Wolf Creek Licensing Project Manager, attached is a status of the follow-up activities directed towards the NRC Staff and KG&E in the Wolf Creek ASLB Initial Decision (ASLBP Docket No. 81-453-03 OL). | |||
Per the request of the Wolf Creek Licensing Project Manager, attached is a status of the follow-up activities directed towards the NRC Staff and KG&E in the Wolf Creek ASLB Initial Decision (ASLBP Docket No. 81-453-03 OL) . | Yours very truly, YO O | ||
Yours very truly, YO | GLK:bb Attach xc:RDMartin, Reg. IV, w/a PO'Connor, w/a HBundy, w/a I | ||
I 8410110276 84100s DR ADOCK 05000482 | I 8410110276 84100s DR ADOCK 05000482 1 | ||
PDR l | |||
I % | |||
201 N. Market -Nctuta, Kansas - Mail Address: RO. Box 208 i Nctuta, Kansas 67201 - Telephone: Area Code (316) 261-6451 L | 201 N. Market -Nctuta, Kansas - Mail Address: RO. Box 208 i Nctuta, Kansas 67201 - Telephone: Area Code (316) 261-6451 L | ||
C | C :. ; y, % ): | ||
,~ | |||
). f- | |||
- ~: | |||
~ | |||
f~J' | f~J' | ||
~ | |||
+ | |||
? % | |||
: u;, | |||
;9 3~ | |||
y q. | |||
a.:. | |||
a .:. | |||
4 | 4 | ||
;.,;7 m3 3 | |||
c | |||
+- m | |||
.~ | |||
W | ;7 i | ||
~. | |||
3 | . ~. <. | ||
x | r i | ||
,.tWOLF CREEK'ASLBSICITIAL"DESCISIONfSTATUS.REPORTi | |||
~ | |||
W | |||
+ | |||
3 y<, | |||
' x Status | |||
[ | [ | ||
Section | Section Ragg Commitment III.1 10- | ||
Commitment | ' Installation of tone alerts.. | ||
AsLof September [26,:,412ihave: | |||
i | |||
~ | |||
distributed.. | |||
Ai | Ai | ||
. Completed.- These"are?in place ~ | |||
'III.1 | |||
~ 10 ~ | |||
LProcedures'(CPIPs).; | Standard " fire"Enotification. | ||
-procedure has;been set forth-as'part of the fire notifica-in-the County Plan' Implementing. | |||
tion system.i See CPIP;No.L19.; | |||
LProcedures'(CPIPs).; | |||
k,- | k,- | ||
4 | 4 | ||
. III.2 12 Second-telephone ~linetis The newL Countyi Shop!. building; - | |||
installed in the County; Shop. | installed in the County; Shop. | ||
The construction schedule ' x has . | .is-still.under construction. | ||
slipped, | The construction schedule ' x has. | ||
: slipped, but: ' completion.,. 'is anticipated in 1984. | |||
The new | |||
III.ll | . shop will~ | ||
III.15 | have'.the. | ||
desired 2 | |||
phone installations. | |||
~* | -III.3 13' Radio equipment for.the Sheriff Equipment installation is has been. installed. | ||
scheduled-for-completion October 12,.1984. | |||
III.ll 17 Additional sirens have.been Completed, installed. | |||
III.15 325, 111 Letters of Agreement (LOAs). | |||
As of September 27,.five of-from host hospitals.and nursing the seven required LOAs'have homes.* | |||
been obtained. | |||
.III.15 | |||
:26, 111 LOAs with ambulance. services Five_of ten required LOAs with and funeral directors. | |||
the ambulance services have beeni obtained as of Sep2 ember? | |||
~* | |||
27.. | |||
Discussions with the Kansas. | |||
Funeral Directors Association are-still: ongoing. | |||
u. | |||
T ' | |||
T ' | .S y | ||
2 | |||
;[ | |||
' Pag.i2 cf 2 | |||
.g | |||
Section | ^ | ||
Status III.28 | Section P.aga Commitment Status III.28 45, 46 CPIPs amended to specify where-The dosimeters will be dosimeters will be prepositionedi | ||
or where County workers in'each | ,prepositioned by November: 7,.- | ||
class will be able to secure | or where County workers in'each 1984.. | ||
their dosimeters,.and the numbers-and types of such dosimeters. | class will be able to secure their dosimeters,.and the numbers-and types of such dosimeters. | ||
III.28 | III.28 46 Corps of Engineers dosimeter Completed. | ||
III.29 | The Corps office | ||
III.31 | : source, at John Redmond-Reservoir maintains its own-dosimeters, recharger and survey meters. | ||
( | III.29 48 County Plan and CPIPs reflect Completed.. See County Plan training matrix revisions. | ||
Table 5-1. | |||
III.31 53 Radio equipment installed. | |||
i | Equipment installation is | ||
( | |||
scheduled for completion l | |||
October 12, 1984. | |||
.I | |||
*As revised by the ASLB order dated July -26,1984 i | |||
i I | |||
h O | |||
l i | |||
.}} | |||
Latest revision as of 10:36, 13 December 2024
| ML20093D534 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 10/08/1984 |
| From: | Koester G KANSAS GAS & ELECTRIC CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| 81-453-03-OL, 81-453-3-OL, KMLNRC-84-180, NUDOCS 8410110276 | |
| Download: ML20093D534 (3) | |
Text
!
N G
Q KANSAS GAS AND ELECTRIC COMPANY THE ELECTRtC COMPANY QLENN L. MOESTER vra passectNr. hucLaan
. October 8, l'984 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 KMLNRC 84-180 Re:
Docket No. STN 50-482 Subj: Wolf Creek ASLB Initial Decision
Dear Mr. Denton:
Per the request of the Wolf Creek Licensing Project Manager, attached is a status of the follow-up activities directed towards the NRC Staff and KG&E in the Wolf Creek ASLB Initial Decision (ASLBP Docket No. 81-453-03 OL).
Yours very truly, YO O
GLK:bb Attach xc:RDMartin, Reg. IV, w/a PO'Connor, w/a HBundy, w/a I
I 8410110276 84100s DR ADOCK 05000482 1
PDR l
I %
201 N. Market -Nctuta, Kansas - Mail Address: RO. Box 208 i Nctuta, Kansas 67201 - Telephone: Area Code (316) 261-6451 L
C :. ; y, % ):
,~
). f-
- ~:
~
f~J'
~
+
? %
- u;,
- 9 3~
y q.
a.:.
4
- .,;7 m3 3
c
+- m
.~
- 7 i
~.
. ~. <.
r i
,.tWOLF CREEK'ASLBSICITIAL"DESCISIONfSTATUS.REPORTi
~
W
+
3 y<,
' x Status
[
Section Ragg Commitment III.1 10-
' Installation of tone alerts..
AsLof September [26,:,412ihave:
i
~
distributed..
Ai
. Completed.- These"are?in place ~
'III.1
~ 10 ~
Standard " fire"Enotification.
-procedure has;been set forth-as'part of the fire notifica-in-the County Plan' Implementing.
tion system.i See CPIP;No.L19.;
LProcedures'(CPIPs).;
k,-
4
. III.2 12 Second-telephone ~linetis The newL Countyi Shop!. building; -
installed in the County; Shop.
.is-still.under construction.
The construction schedule ' x has.
- slipped, but: ' completion.,. 'is anticipated in 1984.
The new
. shop will~
have'.the.
desired 2
phone installations.
-III.3 13' Radio equipment for.the Sheriff Equipment installation is has been. installed.
scheduled-for-completion October 12,.1984.
III.ll 17 Additional sirens have.been Completed, installed.
III.15 325, 111 Letters of Agreement (LOAs).
As of September 27,.five of-from host hospitals.and nursing the seven required LOAs'have homes.*
been obtained.
.III.15
- 26, 111 LOAs with ambulance. services Five_of ten required LOAs with and funeral directors.
the ambulance services have beeni obtained as of Sep2 ember?
~*
27..
Discussions with the Kansas.
Funeral Directors Association are-still: ongoing.
u.
T '
.S y
2
- [
' Pag.i2 cf 2
.g
^
Section P.aga Commitment Status III.28 45, 46 CPIPs amended to specify where-The dosimeters will be dosimeters will be prepositionedi
,prepositioned by November: 7,.-
or where County workers in'each 1984..
class will be able to secure their dosimeters,.and the numbers-and types of such dosimeters.
III.28 46 Corps of Engineers dosimeter Completed.
The Corps office
- source, at John Redmond-Reservoir maintains its own-dosimeters, recharger and survey meters.
III.29 48 County Plan and CPIPs reflect Completed.. See County Plan training matrix revisions.
Table 5-1.
III.31 53 Radio equipment installed.
Equipment installation is
(
scheduled for completion l
October 12, 1984.