Forwards ASLB Initial Decision Status Rept,Per Board 81-453-03 OL
ML20093D534
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 10/08/1984
From: Koester G
KANSAS GAS & ELECTRIC CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
81-453-03-OL, 81-453-3-OL, KMLNRC-84-180, NUDOCS 8410110276
Download: ML20093D534 (3)


Text

!

N G

Q KANSAS GAS AND ELECTRIC COMPANY THE ELECTRtC COMPANY QLENN L. MOESTER vra passectNr. hucLaan

. October 8, l'984 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555 KMLNRC 84-180 Re:

Docket No. STN 50-482 Subj: Wolf Creek ASLB Initial Decision

Dear Mr. Denton:

Per the request of the Wolf Creek Licensing Project Manager, attached is a status of the follow-up activities directed towards the NRC Staff and KG&E in the Wolf Creek ASLB Initial Decision (ASLBP Docket No. 81-453-03 OL).

Yours very truly, YO O

GLK:bb Attach xc:RDMartin, Reg. IV, w/a PO'Connor, w/a HBundy, w/a I

I 8410110276 84100s DR ADOCK 05000482 1

PDR l

I %

201 N. Market -Nctuta, Kansas - Mail Address: RO. Box 208 i Nctuta, Kansas 67201 - Telephone: Area Code (316) 261-6451 L

C :. ; y, % ):

,~

). f-

- ~:

~

f~J'

~

+

? %

u;,
9 3~

y q.

a.:.

4

.,;7 m3 3

c

+- m

.~

7 i

~.

. ~. <.

r i

,.tWOLF CREEK'ASLBSICITIAL"DESCISIONfSTATUS.REPORTi

~

W

+

3 y<,

' x Status

[

Section Ragg Commitment III.1 10-

' Installation of tone alerts..

AsLof September [26,:,412ihave:

i

~

distributed..

Ai

. Completed.- These"are?in place ~

'III.1

~ 10 ~

Standard " fire"Enotification.

-procedure has;been set forth-as'part of the fire notifica-in-the County Plan' Implementing.

tion system.i See CPIP;No.L19.;

LProcedures'(CPIPs).;

k,-

4

. III.2 12 Second-telephone ~linetis The newL Countyi Shop!. building; -

installed in the County; Shop.

.is-still.under construction.

The construction schedule ' x has.

slipped, but: ' completion.,. 'is anticipated in 1984.

The new

. shop will~

have'.the.

desired 2

phone installations.

-III.3 13' Radio equipment for.the Sheriff Equipment installation is has been. installed.

scheduled-for-completion October 12,.1984.

III.ll 17 Additional sirens have.been Completed, installed.

III.15 325, 111 Letters of Agreement (LOAs).

As of September 27,.five of-from host hospitals.and nursing the seven required LOAs'have homes.*

been obtained.

.III.15

26, 111 LOAs with ambulance. services Five_of ten required LOAs with and funeral directors.

the ambulance services have beeni obtained as of Sep2 ember?

~*

27..

Discussions with the Kansas.

Funeral Directors Association are-still: ongoing.

u.

T '

.S y

2

[

' Pag.i2 cf 2

.g

^

Section P.aga Commitment Status III.28 45, 46 CPIPs amended to specify where-The dosimeters will be dosimeters will be prepositionedi

,prepositioned by November: 7,.-

or where County workers in'each 1984..

class will be able to secure their dosimeters,.and the numbers-and types of such dosimeters.

III.28 46 Corps of Engineers dosimeter Completed.

The Corps office

source, at John Redmond-Reservoir maintains its own-dosimeters, recharger and survey meters.

III.29 48 County Plan and CPIPs reflect Completed.. See County Plan training matrix revisions.

Table 5-1.

III.31 53 Radio equipment installed.

Equipment installation is

(

scheduled for completion l

October 12, 1984.

.I

  • As revised by the ASLB order dated July -26,1984 i

i I

h O