OPERATING DATA REPORT DCCKET NO. | OPERATING DATA REPORT 50-397 DCCKET NO. | ||
WNP-2 UNIT 9/4/04 DATE i | |||
: 1. REPORTING PERIOD: ' August 1984 | L.B. HutChison COMPLETED BY TELEPHONE (509) 377-2501 ext.2486 OPER ATING STATUS | ||
: 2. CURRENTLY AUTHORIZED POWER LEVELJ | : 1. REPORTING PERIOD: ' August 1984 744 GROSS HOURS IN REPORTING PERIOD: | ||
: 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe Net): | : 2. CURRENTLY AUTHORIZED POWER LEVELJ 1:3323 MAX. DEPEND. CAPACITY (MWo. Net): 1100 DESIGN ELECTRICAL RATING (MWe Net): 10 MAX. DEPEND. CAPACITY (MWe-GROSSO ~ l.154.7 | ||
: 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe Net): | |||
0t % Capaci G % N e) | |||
: 4. REASONS FOR RESTRICTION (IF ANY): Plant is in Startup and Power Ascension Test Plan and must Complete test Condition 3 requirements before exceeding 75% of | : 4. REASONS FOR RESTRICTION (IF ANY): Plant is in Startup and Power Ascension Test Plan and must Complete test Condition 3 requirements before exceeding 75% of | ||
. Capacity. | |||
: 5. NUM8EP OF HOURS REACTOR WAS CRITICAL | THIS MONTH YR TO DATE CUMULATIVE | ||
: 6. REACTOR RESERVE SHUTDOWN HOURS . . . . . . . . . . . . . . . . . . . | : 5. NUM8EP OF HOURS REACTOR WAS CRITICAL 0 | ||
: 7. HOURS GENERATOR ON LINE , . . . . . ....... .......... 235.8 | 0 0 | ||
: 8. UNIT RESERVE SHUTDOWN HOURS | : 6. REACTOR RESERVE SHUTDOWN HOURS................... | ||
: 7. HOURS GENERATOR ON LINE,...................... 235.8 663.2 663.2 0 | |||
: 9. GROSS THERMAL ENERGY GENERATED (MWH) | 0 0 | ||
: 8. UNIT RESERVE SHUTDOWN HOURS 377,947 844,192 844,192 | |||
: 10. GROSS ELECTRICAL ENERGY GENER ATED (MWHI | : 9. GROSS THERMAL ENERGY GENERATED (MWH) | ||
96,968 | : 10. GROSS ELECTRICAL ENERGY GENER ATED (MWHI. | ||
: 11. NET ELECTMICAL ENERGY GENERATED (MWH) | 96,968 199.463 199,463 | ||
: 12. REACTOR SERVICE FACTOR | . 88,842 178,616 178.610 | ||
N/A | : 11. NET ELECTMICAL ENERGY GENERATED (MWH) | ||
: 13. P.EACTOR AVAILABILITY FACTOR | : 12. REACTOR SERVICE FACTOR N/A N/A N/A | ||
N/A | : 13. P.EACTOR AVAILABILITY FACTOR N/A N/A N/A N/A N/A N/A | ||
: 14. UNIT SERVICE FACTOR | : 14. UNIT SERVICE FACTOR N/A N/A N/A | ||
N/A | : 15. UNIT AVAILA8ILITY FACTOR N/A N/A N/A j | ||
: 15. UNIT AVAILA8ILITY FACTOR | : 18. UNIT CAPACITY FACTOR (Using MCC) | ||
N/A | N/A N/A N/A | ||
: 18. UNIT CAPACITY FACTOR (Using MCC) | : 17. UNIT CAPACITY FACTOR (Uning Demgn MWel N/A N/A N/A | ||
N/A | : 18. UNIT FORCED OUTAGE RATE.. | ||
: 17. UNIT CAPACITY FACTOR (Uning Demgn MWel | |||
N/A | |||
: 18. UNIT FORCED OUTAGE RATE . . | |||
: 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND QURATION OF EACH): | : 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND QURATION OF EACH): | ||
Maintenance M2 Outage, 10/4 thru 10/10/84 | Maintenance M2 Outage, 10/4 thru 10/10/84 | ||
: 20. IF SHUT DOWN AT END OF REPORT PERIOD ESTIMATED DATE OF STARTUP: | : 20. IF SHUT DOWN AT END OF REPORT PERIOD ESTIMATED DATE OF STARTUP: | ||
: 21. UNITS IN TEST STATUS (PRIOR TO CCMMERCIAL CPERATICNb | N/A | ||
Generator Nameplate Rating 1,231,700 KVA 0 0.975 P.F. | : 21. UNITS IN TEST STATUS (PRIOR TO CCMMERCIAL CPERATICNb FORECAST ACHIEVED INm A L CRITICALITY 1/16/84 1/19/84 iNm AL ELECTRICITY 5/15/84 5/27/84 10/19/84 COMMERC!AL OPERATION Generator Nameplate Rating 1,231,700 KVA 0 0.975 P.F. | ||
0410120124 840831 | 0410120124 840831 l | ||
PDR ADOCK 05000397 | \\ | ||
PDR ADOCK 05000397 l | |||
R PDR | |||
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-397 | AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-397 UNIT WNP-2 DATE 9/4/84 COMPLETED BY L.B. Hutchison TELEPHONE (509) 377-2501 ext. 2486 | ||
UNIT WNP-2 | - MONTH'- | ||
AUGUST 1984~ | |||
DAY AVERAGE DAILY POWER LEVEL | DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Ner) | ||
(MWe-Net) 3 0 | |||
0 24 | 0 37 0 | ||
714 15 | 2 51 18 55 3 | ||
INSTRUCTIONS | 0 1e 311 4 | ||
daily unit power level in MWe-Net for each day in the repor:ing month. Compute to de | 20 0 | ||
321 5 | |||
21 0 | |||
6 355 22 o | |||
7 14 | |||
-23 0 | |||
0 1, | |||
0 24 0 | |||
s 25 0 | |||
77 10 26 0 | |||
11 379 27 0 | |||
12 55 28 0 | |||
13 0 | |||
189 29-5 14 EU 714 303 15 637 31 227 16 INSTRUCTIONS daily unit power level in MWe-Net for each day in the repor:ing month. Compute to de ne - | |||
, e m ga att Taese figures veJ1 be u:ed to plot a graph for each reportmg month. Note that when maximum dependable :apac used for the r:et elec:ncal ratog of the uait. there may be occasions when the daily average power level exceeds the IOYe line (or the restricted power level hne). In such cases. the average daily unit power output sheet should be fcotnoted to explairt the apparent anomaly. | |||
00ChETNO. 50-397.- | 00ChETNO. | ||
DATE | 50-397.- | ||
-l LNIT NAME.WNP-2 DATE 9/4/84 LNIT SHJTDOWNS / REDUCTIONS COMPLETED'BY- | |||
.L.B. Hutchison. | |||
REPORT PERIOD AUG | REPORT PERIOD AUG 19_84 LTELEPT)E (509) 377-2501 ' ext..' 2486 month, ~ year SHEET 1 of 2 NO. | ||
M M N RDEDR N N SYSTEM N CAUSE & CUMMECTIVE ACTION TD PREVENT RECURRENCE 84-12 7/10/84 F | |||
44.7- | |||
.A 4 | |||
84.075 EB GENERA D. | |||
Diesel Generator repair and modification outage. | |||
concluded. | concluded. | ||
84-13 8/3/84 | .HJ HTEXCH X Plant was shutdown to repair.a evere steam leak 84-13 8/3/84 F | ||
15.1 A | |||
84-14 8/7/84 | 1 from a handhole on the Moisture Separator Heater' Drain Tank., The leak was repaired by seal welding-the handhole to prevent recurrence. | ||
84-14 8/7/84 S | |||
80.9 B | |||
84-15 8/12/84 F | 3 | ||
letter issued to aid in early conductivity excur-1 sion assessment. | .EA XXXXXX | ||
I | . Loss of Power test conducted as part of the | ||
'Pcwer Ascension Test Program. | |||
84-15 8/12/84 F 66.3 A | |||
1 84.083 HC HTEXCH D Plant was shutdo.:n due to high conductivity. caused by a condenser tube leak. One faf 9d condenser.- | |||
j tube was found in the center of a tube bundle.. | |||
1 The tube was plugged and a chemistry guidance letter issued to aid in early conductivity excur-1 sion assessment. | |||
(See LER 84.083)' | |||
I I | |||
l SLM4ARY l TYPE REASON METHOD SYSTEM & COMP 0ENT F-Forced A-Equip Failure F-Admin 1-Manual | |||
. Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram-Preparation of-D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report' | |||
& License Examination 9-Other (LER) File.(t G EG-0161) | |||
DOCKET NO. | |||
LNIT NAME | 50-397 LNIT NAME WNP-2 DATE-9/4/84-LNIT SHUTDOWNS / REDUCTIONS COMPLETED BY L.B. Hutchison REPORT PERIOD AUG 19_,84 TELEPH0tE (509) 377-2501 ext. 2486 | ||
DATE- | : month, year SHEET 2 of 2 NO. | ||
LNIT SHUTDOWNS / REDUCTIONS | IIATE TTPE HOURS REASON METHOD LER NUtBETI SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO PREVENT RECURRENCE 84-16 8/16/84 F 30.1 B | ||
REPORT PERIOD AUG | 3 84-089 IA INSTRU E MSL - Hi RAD DIV II surveillance caused h SCRAM and C.R. Block flow comparator surviellance caused second h SCRAM for DIV I resulting in Reactor trip. | ||
IIATE TTPE HOURS REASON METHOD LER NUtBETI SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO PREVENT RECURRENCE 84-16 | (See LER 84-089) 84-17 8/17/84 F 5.3 A | ||
(See LER 84-089) 84-17 | / | ||
1 | HH PIPEXX B..Could not attain sufficient vacuum after startup due to 6A and B High Pressure FW Heater ruptured discs, downstream of RV's, being ruptured from previous SCRAM. The cause was determined and the ruptured discs replaced. | ||
I | 1 84-18 8/18/84 F 265.8 A | ||
TYPE | / | ||
HC HTEXCH D Plant was shutdown due to high conductivity caused by condenser tube leaks. | |||
It was determined there were nine (9) relatively ninor tube leaks and one (1) major leak. The cause of leakage was determined the leaking tubes were plugged and the condenser returned to service. | |||
I | |||
--l l SUFNAFY l PLANT CONTINUED IN POWER ASCENSION TEST PROGRAM THROUGH.THE MONTH OF AUGUST. | |||
TYPE REASON METHOD SYSTEM & COMP 0 TENT F-Forced A-Eauip Failure F-Admin 1-Manual Exhibit F & H S-Sched B41aint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Recuced Load Licensee Event Raport | |||
& License Examination 9-Other (LER) File (NUREG-0161) | |||
O | O | ||
_2 Washington Public Power Supply System P.O. Box 968 3000GeorgeWashingtonWay Richland, Washington 99352 (509)372-5000 September 10, 1984 I | |||
Docket No. 50-397 Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555 | Docket No. 50-397 Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. | ||
20555 | |||
==Dear Sir:== | ==Dear Sir:== | ||
==Subject:== | ==Subject:== | ||
NUCLEAR PLANT N0. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for August 1984 as required by our Technical Specifications 6.9.1.6. | NUCLEAR PLANT N0. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for August 1984 as required by our Technical Specifications 6.9.1.6. | ||
| Line 112: | Line 142: | ||
cc: Mr. John B. Martin - NRC, Region V Mr. A. D. Toth - NRC, WNP-2 Site Ms. Dottie Sherman - ANI, Farmington, CT d | cc: Mr. John B. Martin - NRC, Region V Mr. A. D. Toth - NRC, WNP-2 Site Ms. Dottie Sherman - ANI, Farmington, CT d | ||
V | V | ||
.}} | |||
Latest revision as of 10:32, 13 December 2024
| ML20093E462 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 08/31/1984 |
| From: | Hutchison L, Martin J WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | |
| References | |
| NUDOCS 8410120124 | |
| Download: ML20093E462 (5) | |
Text
_. _ - _ _ _ _ _.
OPERATING DATA REPORT 50-397 DCCKET NO.
WNP-2 UNIT 9/4/04 DATE i
L.B. HutChison COMPLETED BY TELEPHONE (509) 377-2501 ext.2486 OPER ATING STATUS
- 1. REPORTING PERIOD: ' August 1984 744 GROSS HOURS IN REPORTING PERIOD:
- 2. CURRENTLY AUTHORIZED POWER LEVELJ 1:3323 MAX. DEPEND. CAPACITY (MWo. Net): 1100 DESIGN ELECTRICAL RATING (MWe Net): 10 MAX. DEPEND. CAPACITY (MWe-GROSSO ~ l.154.7
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe Net):
0t % Capaci G % N e)
- 4. REASONS FOR RESTRICTION (IF ANY): Plant is in Startup and Power Ascension Test Plan and must Complete test Condition 3 requirements before exceeding 75% of
. Capacity.
THIS MONTH YR TO DATE CUMULATIVE
- 5. NUM8EP OF HOURS REACTOR WAS CRITICAL 0
0 0
- 6. REACTOR RESERVE SHUTDOWN HOURS...................
- 7. HOURS GENERATOR ON LINE,...................... 235.8 663.2 663.2 0
0 0
- 8. UNIT RESERVE SHUTDOWN HOURS 377,947 844,192 844,192
- 9. GROSS THERMAL ENERGY GENERATED (MWH)
- 10. GROSS ELECTRICAL ENERGY GENER ATED (MWHI.
96,968 199.463 199,463
. 88,842 178,616 178.610
- 11. NET ELECTMICAL ENERGY GENERATED (MWH)
- 12. REACTOR SERVICE FACTOR N/A N/A N/A
- 13. P.EACTOR AVAILABILITY FACTOR N/A N/A N/A N/A N/A N/A
- 14. UNIT SERVICE FACTOR N/A N/A N/A
- 15. UNIT AVAILA8ILITY FACTOR N/A N/A N/A j
- 18. UNIT CAPACITY FACTOR (Using MCC)
N/A N/A N/A
- 17. UNIT CAPACITY FACTOR (Uning Demgn MWel N/A N/A N/A
- 18. UNIT FORCED OUTAGE RATE..
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND QURATION OF EACH):
Maintenance M2 Outage, 10/4 thru 10/10/84
- 20. IF SHUT DOWN AT END OF REPORT PERIOD ESTIMATED DATE OF STARTUP:
N/A
- 21. UNITS IN TEST STATUS (PRIOR TO CCMMERCIAL CPERATICNb FORECAST ACHIEVED INm A L CRITICALITY 1/16/84 1/19/84 iNm AL ELECTRICITY 5/15/84 5/27/84 10/19/84 COMMERC!AL OPERATION Generator Nameplate Rating 1,231,700 KVA 0 0.975 P.F.
0410120124 840831 l
\\
PDR ADOCK 05000397 l
R PDR
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-397 UNIT WNP-2 DATE 9/4/84 COMPLETED BY L.B. Hutchison TELEPHONE (509) 377-2501 ext. 2486
- MONTH'-
AUGUST 1984~
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Ner)
(MWe-Net) 3 0
0 37 0
2 51 18 55 3
0 1e 311 4
20 0
321 5
21 0
6 355 22 o
7 14
-23 0
0 1,
0 24 0
s 25 0
77 10 26 0
11 379 27 0
12 55 28 0
13 0
189 29-5 14 EU 714 303 15 637 31 227 16 INSTRUCTIONS daily unit power level in MWe-Net for each day in the repor:ing month. Compute to de ne -
, e m ga att Taese figures veJ1 be u:ed to plot a graph for each reportmg month. Note that when maximum dependable :apac used for the r:et elec:ncal ratog of the uait. there may be occasions when the daily average power level exceeds the IOYe line (or the restricted power level hne). In such cases. the average daily unit power output sheet should be fcotnoted to explairt the apparent anomaly.
00ChETNO.
50-397.-
-l LNIT NAME.WNP-2 DATE 9/4/84 LNIT SHJTDOWNS / REDUCTIONS COMPLETED'BY-
.L.B. Hutchison.
REPORT PERIOD AUG 19_84 LTELEPT)E (509) 377-2501 ' ext..' 2486 month, ~ year SHEET 1 of 2 NO.
M M N RDEDR N N SYSTEM N CAUSE & CUMMECTIVE ACTION TD PREVENT RECURRENCE 84-12 7/10/84 F
44.7-
.A 4
84.075 EB GENERA D.
Diesel Generator repair and modification outage.
concluded.
.HJ HTEXCH X Plant was shutdown to repair.a evere steam leak 84-13 8/3/84 F
15.1 A
1 from a handhole on the Moisture Separator Heater' Drain Tank., The leak was repaired by seal welding-the handhole to prevent recurrence.
84-14 8/7/84 S
80.9 B
3
.EA XXXXXX
. Loss of Power test conducted as part of the
'Pcwer Ascension Test Program.
84-15 8/12/84 F 66.3 A
1 84.083 HC HTEXCH D Plant was shutdo.:n due to high conductivity. caused by a condenser tube leak. One faf 9d condenser.-
j tube was found in the center of a tube bundle..
1 The tube was plugged and a chemistry guidance letter issued to aid in early conductivity excur-1 sion assessment.
(See LER 84.083)'
I I
l SLM4ARY l TYPE REASON METHOD SYSTEM & COMP 0ENT F-Forced A-Equip Failure F-Admin 1-Manual
. Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram-Preparation of-D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report'
& License Examination 9-Other (LER) File.(t G EG-0161)
DOCKET NO.
50-397 LNIT NAME WNP-2 DATE-9/4/84-LNIT SHUTDOWNS / REDUCTIONS COMPLETED BY L.B. Hutchison REPORT PERIOD AUG 19_,84 TELEPH0tE (509) 377-2501 ext. 2486
- month, year SHEET 2 of 2 NO.
IIATE TTPE HOURS REASON METHOD LER NUtBETI SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO PREVENT RECURRENCE 84-16 8/16/84 F 30.1 B
3 84-089 IA INSTRU E MSL - Hi RAD DIV II surveillance caused h SCRAM and C.R. Block flow comparator surviellance caused second h SCRAM for DIV I resulting in Reactor trip.
(See LER 84-089) 84-17 8/17/84 F 5.3 A
/
HH PIPEXX B..Could not attain sufficient vacuum after startup due to 6A and B High Pressure FW Heater ruptured discs, downstream of RV's, being ruptured from previous SCRAM. The cause was determined and the ruptured discs replaced.
1 84-18 8/18/84 F 265.8 A
/
HC HTEXCH D Plant was shutdown due to high conductivity caused by condenser tube leaks.
It was determined there were nine (9) relatively ninor tube leaks and one (1) major leak. The cause of leakage was determined the leaking tubes were plugged and the condenser returned to service.
I
--l l SUFNAFY l PLANT CONTINUED IN POWER ASCENSION TEST PROGRAM THROUGH.THE MONTH OF AUGUST.
TYPE REASON METHOD SYSTEM & COMP 0 TENT F-Forced A-Eauip Failure F-Admin 1-Manual Exhibit F & H S-Sched B41aint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Recuced Load Licensee Event Raport
& License Examination 9-Other (LER) File (NUREG-0161)
O
_2 Washington Public Power Supply System P.O. Box 968 3000GeorgeWashingtonWay Richland, Washington 99352 (509)372-5000 September 10, 1984 I
Docket No. 50-397 Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
Subject:
NUCLEAR PLANT N0. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for August 1984 as required by our Technical Specifications 6.9.1.6.
Ver truly yours r
D. Ma in (M/D 927M)
NP-2 Plant Manager 1
JDM:pl Enclosure
^
cc: Mr. John B. Martin - NRC, Region V Mr. A. D. Toth - NRC, WNP-2 Site Ms. Dottie Sherman - ANI, Farmington, CT d
V
.