Arizona Public Service Company | Arizona Public Service Company W | ||
September 6, 1984 ANPP-30447-TDS/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs | |||
==Subject:== | ==Subject:== | ||
| Line 31: | Line 31: | ||
==Dear Sir:== | ==Dear Sir:== | ||
The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B). | The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B). | ||
At that time, it was estimated that a Final Report would be available by September 6, 1984. | At that time, it was estimated that a Final Report would be available by September 6, 1984. | ||
Due to the extenaive investigation and evaluation required, it is now expected that thir information will be finalized by October 19, 1984, at which time a complete report will be submitted. | Due to the extenaive investigation and evaluation required, it is now expected that thir information will be finalized by October 19, 1984, at which time a complete report will be submitted. | ||
There is no new information or change to the Interim Report at this time. | There is no new information or change to the Interim Report at this time. | ||
Very truly yours, IbCe f[DO | Very truly yours, IbCe f[DO O | ||
O | O E. E. Van Brunt, Jr. | ||
APS Vice President Nuclear Production ANPP Project Director l | PDR APS Vice President S | ||
[ | Nuclear Production ANPP Project Director l | ||
EEVB/TRB/nj cc: See Page Two | |||
[ | |||
TE -/7 1 | |||
77- | 77- | ||
:\ | :\\ | ||
y.4 | y.4 n't. | ||
n't. | A- | ||
:4 ; .:: | :4 ;.:: | ||
4 Mr. T. W. Bishop DER-84-28 Page Two cc: | |||
Richard : DeYoung, Director' Office of Inspection _and Enforcement U. - S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woo?.a, Jr.. | |||
D. B. Karner W. E. Ide D. B. Fa nnacht - | D. B. Karner W. E. Ide D. B. Fa nnacht - | ||
A.' C. Rogars L. A. Souza D. 3. Fowler T. D. Shriver C. N. Russo J. Vorees J. R. Bynom J. M. Allen J. A. Brand D. Canady A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Pa tterson R. W. Welcher H. D. Foster D. R. Hawkinnon L. E. Vorderbrueggen R. P. Zimmerman S. R. Frost L. Clyde M. Woods T. J. Bloom Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339 | A.' C. Rogars L. A. Souza D. 3. Fowler T. D. Shriver C. N. Russo J. Vorees J. R. Bynom J. M. Allen J. A. Brand D. Canady A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Pa tterson R. W. Welcher H. D. Foster D. R. Hawkinnon L. E. Vorderbrueggen R. P. Zimmerman S. R. Frost L. Clyde M. Woods T. J. Bloom Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339 | ||
.}} | .}} | ||
Latest revision as of 07:20, 13 December 2024
| ML20097H805 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 09/06/1984 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| ANPP-30447-TDS, DER-84-28, NUDOCS 8409200515 | |
| Download: ML20097H805 (2) | |
Text
._
- h. :> ^
\\
l i
Arizona Public Service Company W
September 6, 1984 ANPP-30447-TDS/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs
Subject:
Time Extension For Report - DER 84-28 A 50.55(e) Potentially Reportable Deficiency Relating To Diesel Generator Fuel Lines In Unit 3.
File: 84-019-026; D.4.33.2
Reference:
(A) Telephone conversation between P. Narbut and T. Bradish on May 11, 1984 (B) ANPP-29696, dated June 7,1984 (Interim Report)
Dear Sir:
The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B).
At that time, it was estimated that a Final Report would be available by September 6, 1984.
Due to the extenaive investigation and evaluation required, it is now expected that thir information will be finalized by October 19, 1984, at which time a complete report will be submitted.
There is no new information or change to the Interim Report at this time.
Very truly yours, IbCe f[DO O
O E. E. Van Brunt, Jr.
Nuclear Production ANPP Project Director l
EEVB/TRB/nj cc: See Page Two
[
TE -/7 1
77-
- \\
y.4 n't.
A-
- 4 ;.::
4 Mr. T. W. Bishop DER-84-28 Page Two cc:
Richard : DeYoung, Director' Office of Inspection _and Enforcement U. - S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woo?.a, Jr..
D. B. Karner W. E. Ide D. B. Fa nnacht -
A.' C. Rogars L. A. Souza D. 3. Fowler T. D. Shriver C. N. Russo J. Vorees J. R. Bynom J. M. Allen J. A. Brand D. Canady A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Pa tterson R. W. Welcher H. D. Foster D. R. Hawkinnon L. E. Vorderbrueggen R. P. Zimmerman S. R. Frost L. Clyde M. Woods T. J. Bloom Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339
.