ML20100P892: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:' | ||
Omaha Public Power District 444 South 16th Street Mall Omaha, Nebraska 68102-7.247 402 6 2000 Januar 23, 1992 LIC-92 015R U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station Pl-137 Washington, DC 20555 4 | |||
==Reference:== | |||
Docket No. 50-285 Gentlemen: | |||
==SUBJECT:== | |||
Fort Calhoun Station Performance Indicators Report Enclosed is the Fort Calhoun Station December 1991 Performance Indicator Report. | |||
If you should have any questions, please contact me. | |||
Sincerely, | |||
/& $ b &v W. G. Gates Division Manager Nuclear Operations WGG/sel Enclosure c: | |||
LeBoeuf, Lamb, Leiby 8 MacRae (w/o Enclosure) | |||
R. D. Martin, NRC Regional Administrator, Region IV D. L. Wigginton, NRC Project Manager S. D. Bloom, NRC Project Engineer R. P. Mullikin, NRC Senior Resident inspector B. A. Boger, NRC Director, Reactcr Projects III, IV, and V Special Projects 30001..; | |||
\\ | |||
9201310167 920123 J | |||
l PDR ADOCK 05000285 i | |||
{l R | |||
PDR 45 5124 Employnent w tn 10ppxtunmy}} | |||
Latest revision as of 05:25, 13 December 2024
| ML20100P892 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 01/23/1992 |
| From: | Gates W OMAHA PUBLIC POWER DISTRICT |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20100P894 | List: |
| References | |
| LIC-92-015R, LIC-92-15R, NUDOCS 9201310167 | |
| Download: ML20100P892 (1) | |
Text
'
Omaha Public Power District 444 South 16th Street Mall Omaha, Nebraska 68102-7.247 402 6 2000 Januar 23, 1992 LIC-92 015R U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station Pl-137 Washington, DC 20555 4
Reference:
Docket No. 50-285 Gentlemen:
SUBJECT:
Fort Calhoun Station Performance Indicators Report Enclosed is the Fort Calhoun Station December 1991 Performance Indicator Report.
If you should have any questions, please contact me.
Sincerely,
/& $ b &v W. G. Gates Division Manager Nuclear Operations WGG/sel Enclosure c:
LeBoeuf, Lamb, Leiby 8 MacRae (w/o Enclosure)
R. D. Martin, NRC Regional Administrator, Region IV D. L. Wigginton, NRC Project Manager S. D. Bloom, NRC Project Engineer R. P. Mullikin, NRC Senior Resident inspector B. A. Boger, NRC Director, Reactcr Projects III, IV, and V Special Projects 30001..;
\\
9201310167 920123 J
l PDR ADOCK 05000285 i
{l R
PDR 45 5124 Employnent w tn 10ppxtunmy