{{#Wiki_filter:-. .
{{#Wiki_filter:-.
  .-  a DUKE Powen GOMPANY P.O. DOX 33180 CHARLOTTE. N.C. 28242 HALH. TUCKER                                                                   ren.erssown vacu renomer                                                               (704) 373-4531 December 31, 1984 Mr. D. G. Eisenhut Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Re: Catawba Nuclear Station Docket Nos. 50-413, 50-414
a DUKE Powen GOMPANY P.O. DOX 33180 CHARLOTTE. N.C. 28242 HALH. TUCKER ren.erssown vacu renomer (704) 373-4531 December 31, 1984 Mr. D. G. Eisenhut Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Re: Catawba Nuclear Station Docket Nos. 50-413, 50-414


==Dear Mr. Eisenhut:==
==Dear Mr. Eisenhut:==
 
Our response of November.4, 1983 to Generic Letter 83-28 described our efforts regarding Item 3.1.2, Review of Vendor Engineering Recommendations for Reactor Trip System Components. We have completed our review of applicable Data Letters and Bulletins, the results of which can be found in Attachment 1.
Our response of November.4, 1983 to Generic Letter 83-28 described our efforts regarding Item 3.1.2, Review of Vendor Engineering Recommendations for Reactor Trip System Components. We have completed our review of applicable Data Letters and Bulletins, the results of which can be found in Attachment 1.     This review included Westinghouse data letters and technical bulletins for all other safety-related components as well.
This review included Westinghouse data letters and technical bulletins for all other safety-related components as well.
In response to Item 4.2 please find Attachment 2, a descripuion of the Preventative Maintenance Program for Reactor Trip Breakers which is currently in use at Catawba.
In response to Item 4.2 please find Attachment 2, a descripuion of the Preventative Maintenance Program for Reactor Trip Breakers which is currently in use at Catawba.
This is accomplished through procedure MP/0/A/2001/05, a copy of which is included.
This is accomplished through procedure MP/0/A/2001/05, a copy of which is included.
As discussed in our original response of November 4, 1983, the results of the
As discussed in our original response of November 4, 1983, the results of the
          . Life Cycle Testing program which was conducted by Westinghouse for the Westinghouse Owner's Group are to be incorporated into an updated Instruction Manual from Westinghouse. A replacement program for reactor trip system components will be               ,
. Life Cycle Testing program which was conducted by Westinghouse for the Westinghouse Owner's Group are to be incorporated into an updated Instruction Manual from Westinghouse. A replacement program for reactor trip system components will be incorporated into an upgraded Duke maintenance program when the new manual is issued.
incorporated into an upgraded Duke maintenance program when the new manual is issued.
In our status letter of November 2, 1984, the scheduled implementation date for the component replacement program was incorrectly stated as December 31, 1984.
In our status letter of November 2, 1984, the scheduled implementation date for the component replacement program was incorrectly stated as December 31, 1984.
Based upon timely receipt of the new Westinghouse manual implementation of the
Based upon timely receipt of the new Westinghouse manual implementation of the
          - component replacement program at Catawba is expected by the end of the first scheduled refuelirig outage.
- component replacement program at Catawba is expected by the end of the first scheduled refuelirig outage.
Very truly yours, d /$p                     _ - - .
Very truly yours, d /$p Hal B. Tucker j
Hal B. Tucker                                           j LTP/mjf                                                   0 tI1 Attachments                                                   (
0 LTP/mjf tI1 Attachments
(
8501070328 841231.
8501070328 841231.
'                    PDR ADOCK 05000413:
PDR ADOCK 05000413:
PDR:
PDR:
p L                                                       _ _.
p L


  ;i-         ..'.                    .
;i-Mr. D. G. Eisenhut, Director '
Mr. D. G. Eisenhut, Director '
, December 31,.1984 Page two.
                  , December 31,.1984 Page two.
cc:
cc:     Mr..J. P. 0'Reilly, Regional Administrator U. S.' Nuclear Regulatory Commission
Mr..J. P. 0'Reilly, Regional Administrator U. S.' Nuclear Regulatory Commission
                          ' Region'II.                                                                  .
' Region'II.
"                        1101 Marietta Street, ~MJ, Suite 2900
1101 Marietta Street, ~MJ, Suite 2900
                            -Atlanta,. Georgia 30302-
-Atlanta,. Georgia 30302-
,                        : Mr. R. A.- Birkel Division of Project Management
: Mr. R. A.- Birkel Division of Project Management Office of Nuclear Reactor Regulation U.-S.-Nuclear Regulatory Commission
<                            Office of Nuclear Reactor Regulation U.-S.-Nuclear Regulatory Commission
' Washington, D.-C. 20555 Robert' Guild, Esquire Attorney-at-Law P. 0.-Box 12097 Charleston, South Carolina 29412 Mr.'' Jesse.L. Riley Carolina Environmental Study Group 854 Henley Place Charlotte,' North Carolina 3
                          ' Washington, D.-C. 20555 Robert' Guild, Esquire
-Dr. K. N. Jabbour-NRC Project Manager Office of Nuclear Reactor Regulation l-U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Ms.. Helen Nicolaras, Project Manager Office of Nuclear Reactor Regulation U. S.; Nuclear Regulatory Commission Washington, D. C. 20555 Mr.'J..C. Bryant LNRC Resident. Inspector-Oconee F.tclear Station LMr.'W. T. Orders NRC Resident Inspector McGuire Nuclear Station NRC Resident. Inspector
.                            Attorney-at-Law P. 0.-Box 12097 Charleston, South Carolina 29412 Mr.'' Jesse.L. Riley     .
. Catawba Nuclear Station PalmettoLAlliance-2135 Devine Street
Carolina Environmental Study Group 854 Henley Place Charlotte,' North Carolina 3
, Columbia..So'uth Carolina 29205-
                            -Dr. K. N. Jabbour-NRC Project Manager Office of Nuclear Reactor Regulation l-                           U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Ms.. Helen Nicolaras, Project Manager Office of Nuclear Reactor Regulation
~
-                            U. S.; Nuclear Regulatory Commission Washington, D. C. 20555                                                   -
~^
Mr.'J..C. Bryant LNRC Resident. Inspector-Oconee F.tclear Station LMr.'W. T. Orders NRC Resident Inspector
,.r---,
            -              McGuire Nuclear Station NRC Resident. Inspector
n
                            . Catawba Nuclear Station PalmettoLAlliance-2135 Devine Street
                        , Columbia..So'uth Carolina 29205-
    ~
                                                  ~^                     '    -
                                                                                        ,.r---, n - ,


ATTACHMENT 1 DATA LETTERS 63-2 Nuclear Maintenance I & E concurs with Design Engineering that appropriate noise reduction techniques were utilized in the design and construction of Catawba Nuclear Station. Catawba I & E has agreed that appropriate noise reduction techniques will be considered
ATTACHMENT 1 DATA LETTERS 63-2 Nuclear Maintenance I & E concurs with Design Engineering that appropriate noise reduction techniques were utilized in the design and construction of Catawba Nuclear Station. Catawba I & E has agreed that appropriate noise reduction techniques will be considered
          -in the implementation of future NSM packages. Furthermore, Catawba Projects has agreed to make their personnel aware of these techniques.
-in the implementation of future NSM packages.
Furthermore, Catawba Projects has agreed to make their personnel aware of these techniques.
63-5 The only mineral insulated cable we are aware of at Catawba is the cable used in the nuclear instrumentation and incore thermocouple applications. In both cases, vendor supplied, prefabricated cables were used (the cables and plugs were already assembled and ready to use). Therefore, this item does not affect Catawba. However, as a precaution the station was notified that any mineral insulated cable which is formed by site personnel for any future application should be heat dried just before sealing.
63-5 The only mineral insulated cable we are aware of at Catawba is the cable used in the nuclear instrumentation and incore thermocouple applications. In both cases, vendor supplied, prefabricated cables were used (the cables and plugs were already assembled and ready to use). Therefore, this item does not affect Catawba. However, as a precaution the station was notified that any mineral insulated cable which is formed by site personnel for any future application should be heat dried just before sealing.
64-4 The use of any item containing lead within the primary system is controlled by a Materials Guide.and by Station Directives.
64-4 The use of any item containing lead within the primary system is controlled by a Materials Guide.and by Station Directives.
Line 68: Line 64:
68-36 This Data Letter is not applicable to Catawba Nuclear Station.
68-36 This Data Letter is not applicable to Catawba Nuclear Station.
70-18 All essential equipment utilizing triaxial cable has been success-fully preoperationally tested. Furthermore, any faulty cable would already have been discovered during installation or testing.
70-18 All essential equipment utilizing triaxial cable has been success-fully preoperationally tested. Furthermore, any faulty cable would already have been discovered during installation or testing.
71-20 There has been no problem with drifting output signals on Barton transmitters. If there were any defective transmitters at Catawba, they would have been noticed by now. However, if any problems are noted, either the site Westinghouse representatives or Barton-representatives will be notified.
71-20 There has been no problem with drifting output signals on Barton transmitters.
If there were any defective transmitters at Catawba, they would have been noticed by now. However, if any problems are noted, either the site Westinghouse representatives or Barton-representatives will be notified.
73-8 Breakers at Catawba Nuclear Station were originally sized based on manufacturer's specifications on the electrical loads, and also on Design Engineering calculations of the maximum motor starting current '
73-8 Breakers at Catawba Nuclear Station were originally sized based on manufacturer's specifications on the electrical loads, and also on Design Engineering calculations of the maximum motor starting current '
:through each breaker. Any incorrectly sized breakers would be noticed during periodic breaker testing and preventative maintenance.
:through each breaker. Any incorrectly sized breakers would be noticed during periodic breaker testing and preventative maintenance.
5
5
            .._y.,.,-._ _ ~ . . . - , . - . , . ,,,,_,v.       .,_7_ ,,.._..m, ~,..-..,,...,,...,,,,.,,,,,,_.w ..
.._y.,.,-._
_ ~... -,. -.,.
,,,,_,v.
.,_7_
.-t
,,.._..m,
~,..-..,,...,,...,,,,.,,,,,,_.w


e- ..
e -
ATTACHMENT 1 1
ATTACHMENT 1 1
            ;74-4 'No action by Duke Power Company. is required - this Data Letter was
;74-4
,                    transmitted for our information.
'No action by Duke Power Company. is required - this Data Letter was transmitted for our information.
77-2   Catawba Nuclear Station already uses the Keithley 602 electrometer.
77-2 Catawba Nuclear Station already uses the Keithley 602 electrometer.
77-3   This Data Letter is not applicable to Catawba Nuclear Station.
77-3 This Data Letter is not applicable to Catawba Nuclear Station.
78-4   The recommended changes will be made to the appropriate instrument calibration procedures by Catawba I & E.
78-4 The recommended changes will be made to the appropriate instrument calibration procedures by Catawba I & E.
79   Station procedures specify the use of permanently installed voltmeters to ensure proper P-4 permissive contact operation following all reactor trips. .These voltmeters were installed as a modification in
79 Station procedures specify the use of permanently installed voltmeters to ensure proper P-4 permissive contact operation following all reactor trips..These voltmeters were installed as a modification in
                    . response to a Westinghouse letter of 11-7-79 to the NRC.
. response to a Westinghouse letter of 11-7-79 to the NRC.
80-3   .The proper connectors have already been ordered as spares, and the necessary instructions for their use are already in the appropriate instrument procedure..
80-3
80-8'   It is a common practice of Catawba I & E to " exercise" the calibration potentiometers of a transmitter if the output of that transmitter is not steady.
.The proper connectors have already been ordered as spares, and the necessary instructions for their use are already in the appropriate instrument procedure..
80-8' It is a common practice of Catawba I & E to " exercise" the calibration potentiometers of a transmitter if the output of that transmitter is not steady.
';I b
';I b
I f
I f
Line 92: Line 96:
ATTACHMENT 1 TECHNICAL BULLETINS 73-24 Rev. 1 The potential for RF I & C interference as a result of the use of radio equipment within the station has already been addressed in response to IE Information Notice 83-83.
ATTACHMENT 1 TECHNICAL BULLETINS 73-24 Rev. 1 The potential for RF I & C interference as a result of the use of radio equipment within the station has already been addressed in response to IE Information Notice 83-83.
Catawba Nuclear Station has established administrative controls on areas where transmitter use will not be allowed.
Catawba Nuclear Station has established administrative controls on areas where transmitter use will not be allowed.
74-12       No action is necessary for Catawba Nuclear Station Unit 1, as construction has been completed for this unit. Catawba Constrection has committed to notify / train the electrical crews of this situation by December 31, 1984, in order to be alert for this potential problem on Unit 2.                                         This training will be documented on Construction Training Form V-lC.
74-12 No action is necessary for Catawba Nuclear Station Unit 1, as construction has been completed for this unit.
75-2         This Technical Bulletin is not applicable to Catawba Nuclear Stu tion.
Catawba Constrection has committed to notify / train the electrical crews of this situation by December 31, 1984, in order to be alert for this potential problem on Unit 2.
77-10       The actions recommended by this Technical Bulletin have been completed.
This training will be documented on Construction Training Form V-lC.
80-4         Catawba Nuclear Station was alerted to the possibility of the subject voltage oscillations occurring, and were instructed to notify both Westinghouse and Nuclear Maintenance I & E if any such oscillations are observed. None have been seen to date.
75-2 This Technical Bulletin is not applicable to Catawba Nuclear Stu tion.
80-5         Catawba Nuclear Station plans to always use a reference power level of 100%, with Incore Axial Offset data taken at 75%.
77-10 The actions recommended by this Technical Bulletin have been completed.
However, a note will be added to the appropriate instrument i                     procedure by I & E to. provide proper scaling for other refer-ence power levels.
80-4 Catawba Nuclear Station was alerted to the possibility of the subject voltage oscillations occurring, and were instructed to notify both Westinghouse and Nuclear Maintenance I & E if any such oscillations are observed. None have been seen to date.
80-6         This bulletin is not applicable, since Catawba Nuclear Station does not utilize 10-50 mA transmitters.
80-5 Catawba Nuclear Station plans to always use a reference power level of 100%, with Incore Axial Offset data taken at 75%.
I 80-8         This Technical Bulletin is not applicable to Catawba Nuclear Station.
However, a note will be added to the appropriate instrument i
L         81-11       - Action on this Technical Bulletin has been completed for Catawba Nuclear Station.
procedure by I & E to. provide proper scaling for other refer-ence power levels.
81-13       Catawba Nuclear Station was not affected by this Technical Bulletin.
80-6 This bulletin is not applicable, since Catawba Nuclear Station does not utilize 10-50 mA transmitters.
I 80-8 This Technical Bulletin is not applicable to Catawba Nuclear Station.
L 81-11
- Action on this Technical Bulletin has been completed for Catawba Nuclear Station.
81-13 Catawba Nuclear Station was not affected by this Technical Bulletin.
b
b


Attachment 2 I
Catawba Nuclear Station Westinghouse DS-416 Reactor Trip Breakers i
l Catawba Nuclear Station Westinghouse DS-416 Reactor Trip Breakers           i Summary of Preventative Maintenance Program The subject breakers are cleaned, inspected, and tested every six months under procedure MP/0/A/2001/05. A description of the preven-tative maintenance follows below:
Summary of Preventative Maintenance Program The subject breakers are cleaned, inspected, and tested every six months under procedure MP/0/A/2001/05. A description of the preven-tative maintenance follows below:
The breakers are given a visual inspection as they are removed from service. If any cracked welds, broken parts, and/or loose or missing bolts are discovered, repairs are made immediately. The breakers are then cleaned by means of vacuum, compressed air, or an oil free solvent.
The breakers are given a visual inspection as they are removed from service.
If any cracked welds, broken parts, and/or loose or missing bolts are discovered, repairs are made immediately. The breakers are then cleaned by means of vacuum, compressed air, or an oil free solvent.
The cubicle is cleaned, and lubricated if necessary. Next, the arc chute shields, barriers, covers, and arc chutes are removed (wet arc chutes or insulators are dried with a suitable heat source).
The cubicle is cleaned, and lubricated if necessary. Next, the arc chute shields, barriers, covers, and arc chutes are removed (wet arc chutes or insulators are dried with a suitable heat source).
A Force Test on the Trip Bar is performed, fo!1 owed by a Force Test on the UV Trip Device (the Trip Load must be less than 2 lbs., and the acceptance criteria for the latter test is 3.0 lbs. minimum). Pre and Post Travel tolerances for the Trip Tap on the UV Trip Device are checked. (No adjustments to the UV Trip Attachment are allowed to satisfy clearance requirements within the device or between the device and the reactor trip breaker shaft lever pin, unless a Westinghouse service representative is present. If a UV device is in need of repair and no Westinghouse representative is present, a new UV device is installed). Proper cleanliness and lubrication of the roller bearing is verified.
A Force Test on the Trip Bar is performed, fo!1 owed by a Force Test on the UV Trip Device (the Trip Load must be less than 2 lbs., and the acceptance criteria for the latter test is 3.0 lbs. minimum).
Pre and Post Travel tolerances for the Trip Tap on the UV Trip Device are checked.
(No adjustments to the UV Trip Attachment are allowed to satisfy clearance requirements within the device or between the device and the reactor trip breaker shaft lever pin, unless a Westinghouse service representative is present.
If a UV device is in need of repair and no Westinghouse representative is present, a new UV device is installed).
Proper cleanliness and lubrication of the roller bearing is verified.
An inspection of.the contacts is now performed. They are cleaned, and contact wipe, contact resistance, pressure, and alignment are checked (see Attachment 3 for a drawing showing the alignment tolerances checked).
An inspection of.the contacts is now performed. They are cleaned, and contact wipe, contact resistance, pressure, and alignment are checked (see Attachment 3 for a drawing showing the alignment tolerances checked).
The mechanism linkage is checked for proper operation, including an.
The mechanism linkage is checked for proper operation, including an.
inspection of every pin, keeper, or spring used in the assembly. Any necessary repairs are made. All other measurements and adjustments
inspection of every pin, keeper, or spring used in the assembly. Any necessary repairs are made. All other measurements and adjustments
      - required by the instruction manual (CNM-1399.40-00ll) are made,'and then the equipment is lubricated and cleaned.
- required by the instruction manual (CNM-1399.40-00ll) are made,'and then the equipment is lubricated and cleaned.
Finally, the breaker is tested mechanically and electrically for proper operation. The Force Tests on the Trip Bar and UV Trip Device are performed again, and the Pre and Post Travel tolerances for the Trip Tap on the UV Trip Device are again checked. The roller bearing is re-examined, and then the breaker is cycled ten times (using the UV trip device).
Finally, the breaker is tested mechanically and electrically for proper operation.
The Force Tests on the Trip Bar and UV Trip Device are performed again, and the Pre and Post Travel tolerances for the Trip Tap on the UV Trip Device are again checked. The roller bearing is re-examined, and then the breaker is cycled ten times (using the UV trip device).
Finally, all parts which were earlier removed (chutes, shields, etc.)
Finally, all parts which were earlier removed (chutes, shields, etc.)
are reinstalled.
are reinstalled.
l t
l t


l ar: <,
ar: <,
Awhnt- 2 l
Awhnt-2 i
i l
l Form 34731 (1041)
l 1
(Formerly SPD 10021)
Form 34731 (1041)
DUKE POWER COMPANY (1)
(Formerly SPD 10021) 1 l
ID No: HP/0/A/2001/05 PROCEDURE PREPARATION Change (s) 0 to PROCESS RECORD 0
DUKE POWER COMPANY                             (1)   ID No: HP/0/A/2001/05 PROCEDURE PREPARATION PROCESS RECORD Change (s)           0 to 0       Incorporated (2)   STATION:     Catawba Nuclear (3) PROCEDURE TITLE:_ Westinghouse DS-416 Air Circuit Breaker Insoection and Staintenance (4) PREPARED BY:                 Jeff Ashe                         DATE:           11/17/83 J>
Incorporated (2)
(5) REVIEWED BY:                 [. 8e               m      / DATE:                 2!/,5 /99 Cross-Disciplinary Review By:                                               SI         N/R: S/20 W!f
STATION:
Catawba Nuclear (3) PROCEDURE TITLE:_ Westinghouse DS-416 Air Circuit Breaker Insoection and Staintenance (4) PREPARED BY:
Jeff Ashe DATE:
11/17/83 J>
2!/,5 /99 (5) REVIEWED BY:
[. 8e
/ DATE:
m S/20 W!f Cross-Disciplinary Review By:
SI N/R:
/e
(
(
                                                                    /e (6) TEMPORARY APPROVAL (IF NECESSARY):
(6) TEMPORARY APPROVAL (IF NECESSARY):
By:
By:
(SRO) Date:
(SRO) Date:
By:                                                         Date:
By:
(             (7) APPROVED BY:             me MC                                 Date:           .3-2-N (8) MISCELLANEOUS:
Date:
          #          Reviewed / Approved By:                                   Date:               ((-/2 " b F
(
Reviewed / Approved By:                                   Date:
(7) APPROVED BY:
REYlEWED BY QUAmY ASSURANCE DEARTMENT                        This' copy ~&as'6een's rpared OPERATIONS DMSION the cetrol co                         -
me MC Date:
corret                          Rd 18 Yerified Y       Y$ 2-/.SN                                       O Eat E REPRESENTATIVE DATE                                                                     N
.3-2-N (8) MISCELLANEOUS:
Reviewed / Approved By:
Date:
((-/2 " b F
Reviewed / Approved By:
Date:
This' copy ~&as'6een's rpared REYlEWED BY QUAmY ASSURANCE DEARTMENT the cetrol co OPERATIONS DMSION Rd 18 Yerified corret Y
Y$ 2-/.SN Eat O
E REPRESENTATIVE DATE N


. ar: ,   -
ar:,
Procedure TCP/CN0/A/0006/00/0/SM (MP/0/A/2001/05)
Procedure TCP/CN0/A/0006/00/0/SM (MP/0/A/2001/05)
QA Department)A Review     A(       N    Date Section p                 f Approval _4             V Date /2-/2- O 90 DUKE POWER COMPANY TRANSMISSION DEPARTMENT SUBSTATION     DIVISION MAINTENANCE SECTION               ,
QA Department)A N Review A(
CHARLOTTE       DISTRICT / GROUP CATAWBA         LOCATION / STATION WESTINGHOUSE DS-416 AIR CIRCUIT BREAKER IN$PECTION AND MAINTENANCE NOTE:     Sections in this procedure that are preceded by an asterisk shall be initialed on Enclosure 13.1 of this procedure. Double asterisks indicate QA inspection steps. Sign off in step 11.16.
Date Section p
1.0           Purpose 1.1           This procedure establishes the requirenents                   to   control the inspection and maintenance of Westinghouse DS-416 breakers.
f Approval _4 V Date /2-/2-O 90 DUKE POWER COMPANY TRANSMISSION DEPARTMENT SUBSTATION DIVISION MAINTENANCE SECTION CHARLOTTE DISTRICT / GROUP CATAWBA LOCATION / STATION WESTINGHOUSE DS-416 AIR CIRCUIT BREAKER IN$PECTION AND MAINTENANCE NOTE:
2.0           References 2.1           Current       copy of Instruction Manual for DS-416 Breakers.               CNM 1399.40-0011.
Sections in this procedure that are preceded by an asterisk shall be initialed on Enclosure 13.1 of this procedure.
2.2           Westinghouse Drawing No. 693C350.
Double asterisks indicate QA inspection steps.
2.3           Westinghouse Drawing No. 588C785.
Sign off in step 11.16.
3.0           Personnel Requirements 3.1           The number of manhours necessary to complete the inspection and testing depends on the extent of repairs to be made. Record actual manhours on the work request.
1.0 Purpose 1.1 This procedure establishes the requirenents to control the inspection and maintenance of Westinghouse DS-416 breakers.
3.2           Personnel performing maintenance on Westinghouse DS-416 breakers shall have qualifications satisfying Catawba Nuclear Station Directive 2.7 and the Transmission Administrative Manual Section 2.3.
2.0 References 2.1 Current copy of Instruction Manual for DS-416 Breakers.
4.0           Safety Considerations 4.1           Equipment Clearance and Isolation
CNM 1399.40-0011.
            -4.1.1         Breaker maintenance will require that the breaker be racked out to the disconnect position and placed on the floor. Red tags should be issued if needed according to Catawba Nuclear Station Directive 3.1.1.
2.2 Westinghouse Drawing No. 693C350.
2.3 Westinghouse Drawing No. 588C785.
3.0 Personnel Requirements 3.1 The number of manhours necessary to complete the inspection and testing depends on the extent of repairs to be made.
Record actual manhours on the work request.
3.2 Personnel performing maintenance on Westinghouse DS-416 breakers shall have qualifications satisfying Catawba Nuclear Station Directive 2.7 and the Transmission Administrative Manual Section 2.3.
4.0 Safety Considerations 4.1 Equipment Clearance and Isolation
-4.1.1 Breaker maintenance will require that the breaker be racked out to the disconnect position and placed on the floor. Red tags should be issued if needed according to Catawba Nuclear Station Directive 3.1.1.
545001H
545001H
                        -    .      . _ _ _ .      .-    .  . _ . . =.             ._. _            _ _
.. =.


o   < 1, .
o
4.2           Health Physics Considerations 4
< 1,.
4.2.1         If the work request indicates, obtain a Radiation Work Permit or a Standing Radiation Work Pemit from Health Physics.
4.2 Health Physics Considerations 4
  )                 4.3             Special Safety Considerations 4.3.1           Assure good ventilation or use air masks when using "Penolene",
4.2.1 If the work request indicates, obtain a Radiation Work Permit or a Standing Radiation Work Pemit from Health Physics.
                    " Spot Check", or similar chlorinated hydrocarbon cleaners.
)
4.3.2           Use red tape to identify any exposed high voltage creas and warn personnel of any possible shock hazards.
4.3 Special Safety Considerations 4.3.1 Assure good ventilation or use air masks when using "Penolene",
;                    5.0   .
" Spot Check", or similar chlorinated hydrocarbon cleaners.
Station (or Unit) Status l'
4.3.2 Use red tape to identify any exposed high voltage creas and warn personnel of any possible shock hazards.
                    *5.1           Routine maintenance on breakers should coincide with PM requirements and Technical Specification requirements. Availability should be determined by the shift supervisor or his superior, in order to insure safe unit operation.
5.0 Station (or Unit) Status l'
6.0             Prerequisites
*5.1 Routine maintenance on breakers should coincide with PM requirements and Technical Specification requirements. Availability should be determined by the shift supervisor or his superior, in order to insure safe unit operation.
                    *6.1           Verify that this procedure is the same as the control copy at the p                   station.
6.0 Prerequisites
                    *6.2           Notify Quality Assurance personnel before beginning work if the
*6.1 Verify that this procedure is the same as the control copy at the p
station.
*6.2 Notify Quality Assurance personnel before beginning work if the Work Request so indicates.
+
+
Work Request so indicates.
i
i                  *6.3           Before or during the job, the job supervisor, planner, or engineer shall review, the job.            initial and "N/A" any procedure steps that are not applicable to li                 *6.4           If   necessary,   obtain current manufacturer's   drawings                 and/or instruction books.
*6.3 Before or during the job, the job supervisor, planner, or engineer shall review, initial and "N/A" any procedure steps that are not applicable to the job.
                  -**6.5           While performing this procedure if any leads are lifted, jumpers added, or switches opened or closed, double verification of removal and double verification of replacement must be documented on Enclosure 13.2.
li
7.0             Repair Parts 7.1             Work on safety related breakers will require - Quality Assurance approved parts.
*6.4 If necessary, obtain current manufacturer's drawings and/or instruction books.
-**6.5 While performing this procedure if any leads are lifted, jumpers added, or switches opened or closed, double verification of removal and double verification of replacement must be documented on Enclosure 13.2.
7.0 Repair Parts 7.1 Work on safety related breakers will require - Quality Assurance approved parts.
7.2-Parts utilized during repairs will be listed 'on the Work Request.
7.2-Parts utilized during repairs will be listed 'on the Work Request.
The Work Request must be presented at the parts room to obtain parts.
The Work Request must be presented at the parts room to obtain parts.
: l.                 8.0             Special Tools
l.
                  **8.1           Verify that calibration dates on tools and measurement equipment are cu* rent.
8.0 Special Tools
Record serial number and calibration date due. on Enclosure 13.2.
**8.1 Verify that calibration dates on tools and measurement equipment Record serial number and calibration date due. on Enclosure 13.2.
are cu* rent.
: 545001H
: 545001H


9.0         Acceptance Requirements Note:   This section is applicable only when a complete PM of the breaker is perfonned and need not be initialed when making minor repairs or adjustments that may arise between scheduled PM periods.
9.0 Acceptance Requirements Note:
          *9.1         The successful completion of the applicable parts of Section 11.0 of this procedure will detemine the acceptability of the A. C. B.
This section is applicable only when a complete PM of the breaker is perfonned and need not be initialed when making minor repairs or adjustments that may arise between scheduled PM periods.
10.0         Interference Items None 11.0         Procedure Note:   The following steps are not necessarily required to be performed in chronological order. Some steps may be performed at any time. This procedure is to be used as a guide by experienced breaker retairmen only.
*9.1 The successful completion of the applicable parts of Section 11.0 of this procedure will detemine the acceptability of the A. C. B.
        *11.1         Verify that the Work Request has been approved, and the " Clearance to Begin Work" section has been properly completed. Be sure the breaker is de-energized and/or red tagged. Maintain all enclosum: + bat are applicable to the maintenance activity being performed.
10.0 Interference Items None 11.0 Procedure Note:
        **11.2         Visually check equipment as removed from service. Inspect the equipment for broken parts, cracked welds, and/or loose or missing bolts.
The following steps are not necessarily required to be performed in chronological order. Some steps may be performed at any time. This procedure is to be used as a guide by experienced breaker retairmen only.
*11.1 Verify that the Work Request has been approved, and the " Clearance to Begin Work" section has been properly completed.
Be sure the breaker is de-energized and/or red tagged.
Maintain all enclosum: + bat are applicable to the maintenance activity being performed.
**11.2 Visually check equipment as removed from service.
Inspect the equipment for broken parts, cracked welds, and/or loose or missing bolts.
Repair or replace any damaged parts and record action taken.
Repair or replace any damaged parts and record action taken.
        *11.3         Remove dust and dirt by vacuum, air, or oil free solvent.
*11.3 Remove dust and dirt by vacuum, air, or oil free solvent.
        **11.4         Clean and inspect cubicle for loose hardware or broken parts and lubricate where necessary.
**11.4 Clean and inspect cubicle for loose hardware or broken parts and lubricate where necessary.
        *11.5         Remove are chute shields, barriers, covers, and arc chutes.   " Wet" arc chutes or insulators may be dried with a heat gun, oven, or other heat source.
*11.5 Remove are chute shields, barriers, covers, and arc chutes.
        *11.6         Perform the following tests and record the data obtained on Enclosure 13.3. Include the total number of times the breaker was tripped.
" Wet" arc chutes or insulators may be dried with a heat gun, oven, or other heat source.
*11.6 Perform the following tests and record the data obtained on 3.3.
Include the total number of times the breaker was tripped.
Before preventive maintenance testing on UV trip device "AS FOUND" Westinghouse Drawing No. 693C350 and No. 58SC785 should be consulted if needed.
Before preventive maintenance testing on UV trip device "AS FOUND" Westinghouse Drawing No. 693C350 and No. 58SC785 should be consulted if needed.
11.6.1         Perform a Force Test on the Trip Bar.
11.6.1 Perform a Force Test on the Trip Bar.
11.6.2         Perform a Force Test on the UV trip device.
11.6.2 Perform a Force Test on the UV trip device.
11.6.3         Check the tolerances regarding Pre and Post Travel of the Trip Tap on the UV trip device.
11.6.3 Check the tolerances regarding Pre and Post Travel of the Trip Tap on the UV trip device.
545001H
545001H


=
=
e
e 11.6.4 Check the condition of the roller bearing with regard to the proper cleanliness and lubricant.
;                          11.6.4       Check the condition of the roller bearing with regard to the proper cleanliness and lubricant.
r 11.6.5 Should a UV device be found faulty and adjustments cannot be made, field installation of a new UV device should.be made as per Westinghouse Drawing No. 588C735.
r 11.6.5       Should a UV device be found faulty and adjustments cannot be made, field installation of a new UV device should .be made as per Westinghouse Drawing No. 588C735. No adjustments to the undervoltage trip attachment are to be made in the field to satisfy either intracisarance requirements (within the device proper) or interclearance requirements (between the device and the                                   ,
No adjustments to the undervoltage trip attachment are to be made in the field to satisfy either intracisarance requirements (within the device proper) or interclearance requirements (between the device and the RTB trip shaft lever pin) without an appropriate Westinghou e service representative present.
RTB trip shaft lever pin) without an appropriate Westinghou e service representative present.
**11.7 Inspect the' ' contacts;
                          **11.7       Inspect   the' ' contacts; clean, check contact dipe, contaci resistance, pressure ard alignment. This includes checking measurements                     as y                         per instruction book. ' Repair or replace as needed.                                                 ,
: clean, check contact
F                                                                                                                                   .
: dipe, contaci resistance, pressure ard alignment.
$                        **11.8       Inspect mechanism linkage for binding, looseness, worn or defective i                         parts. Check every pin, keeper, and spring in the mechanisn.                     Repair or replace as needed.                                                                                                 c 3
This includes checking measurements as y
                          *11.9       Make and/or check any mechanism measurements and adjustments needed n
per instruction book. ' Repair or replace as needed.
                        .per instruction or technical bulletins and record on Enclosure 13.1.
F
                          *11.10       Lubricate and perfonn finai cleantag of the equipmept.
**11.8 Inspect mechanism linkage for binding, looseness, worn or defective i
parts.
Check every pin, keeper, and spring in the mechanisn.
Repair or replace as needed.
c 3
*11.9 Make and/or check any mechanism measurements and adjustments needed
.per instruction or technical bulletins and record on Enclosure 13.1.
n
*11.10 Lubricate and perfonn finai cleantag of the equipmept.
s
s
                          *11.11       Check breaker operation mechapi ally and electrically.
*11.11 Check breaker operation mechapi ally and electrically.
                          *11.12       Ferform   the following tests and record the data obtained on Enclosure =13.3.                   ;, .                                                ,f
t
                                                                                                                              '[
*11.12 Ferform the following tests and record the data obtained on Enclosure =13.3.
After preventive maintenance testing of UV device "AS LEFT"                                   s e
' [
m                    Westinghouse Drawing rio F                        needed.                          69.'C350 and No. 588C785 should be consulted if J
,f After preventive maintenance testing of UV device "AS LEFT" s
-                        **1.1.12J , Perform a Force Tes : in the Trip Bar.
e Westinghouse Drawing rio 69.'C350 and No. 588C785 should be consulted if m
t b                       **11.12.2 Perform a Force Test on the UV Trip Device, r                                                                                                                                   f
F needed.
J
**1.1.12J, Perform a Force Tes : in the Trip Bar.
t b
**11.12.2 Perform a Force Test on the UV Trip Device, r
f
[
[
                        *'11.12.3 Check the tolerances regarding Pre and Post Travel of' the Trip Tab
*'11.12.3 Check the tolerances regarding Pre and Post Travel of' the Trip Tab P
                      'on the UV Trip     Device.                                                                               ,
'on the UV Trip Device.
P              ,
9
              ~
**11.12.4
9           .
~
                        **11.12.4 Check the condition of the miler bearing with regsrd to the proper .
/
                                                                                                                          /
Check the condition of the miler bearing with regsrd to the proper cleanliness and lubricant.
t-                      cleanliness and lubricant.                               >
t-s 1
s
**11.13 On the test bench, Sycle the breaker ten times udng the UV trip a
-                                                                                      1
device.
                        **11.13 a                      device. Report On the test bench, Sycle the breaker ten times udng the UV trip Ew any failuresip appropriate personnth
Report any failuresip appropriate personnth Ew
[                       **11.14
/
                                                                                              /
[
Install necessary parts (chutes, chields, and /ront cover).
**11.14 Install necessary parts (chutes, chields, and /ront cover).
                        *11.15                                                             ~
*11.15 Complete all documentation on the Work Request and the Enc'icsures.
Complete all documentation on the Work Request and the Enc'icsures.
~
4
*11.16 Q.C. inspector veriff es that $lh inspectioris with double asterisks 4
                        *11.16         Q.C. inspector veriff es that $lh inspectioris with double asterisks
/g 5qave been performed.
        /g             5 qave    been performed.
E
E
                      ./         .
./
E
E
=                       ,
=
                                                                                                                          ,            $?
$ ?
1
1


T 12.0                   Restoration
T 12.0 Restoration
                                    *12.1                   Contact the shift supervisor to clear the red tags if any were issued and return the breaker to the station for operation.
*12.1 Contact the shift supervisor to clear the red tags if any were issued and return the breaker to the station for operation.
                                    *12.2                   Notify the I&E group for additional testing requirements.
*12.2 Notify the I&E group for additional testing requirements.
i
i
                                    *12.3 Forward the completed copy of the Work Request and applicable enclosures to the Planning Office or the Station Support Engineer.
*12.3 Forward the completed copy of the Work Request and applicable enclosures to the Planning Office or the Station Support Engineer.
13.0                     Enclosures 13.1                     Procedure Checklist 13.2                     Tool, Instrument, and Torque Value List 13.3
13.0 Enclosures 13.1 Procedure Checklist 13.2 Tool, Instrument, and Torque Value List 13.3 Force Tests and Tolerance Checks for UV Device S
                      !                                    Force Tests and Tolerance Checks for UV Device S
6 v
6 v   ,
1A$
1A$                             A s
A s
I 1
I 1
                                                                        ?
?
c
c fN
      ,                      fN                                                      =
=
_,.                      (\ \                                                 ,
(\\ \\
I
I
                                ,          .E '
.E '
                                          -'f         ., 2 545001H
-'f 2
545001H


ENCLOSURE 13.1 PROCEDURE CHECKLIST TCP/CN0/A/0006/00/0/SM Foreman W.R. #
ENCLOSURE 13.1 PROCEDURE CHECKLIST TCP/CN0/A/0006/00/0/SM Foreman W.R. #
Date Breaker Nameplate: Type Mfr Volts Amps                                                             .
Date Breaker Nameplate: Type Mfr Volts Amps Serial #
Serial #
5.1 Status 11.8 Mechanism 6.1 Verification 11.9 Adjustments 6.2 QA 11.10 Lubrication
5.1                     Status                                                           11.8 Mechanism 6.1                     Verification                                                     11.9
: 6. 3 -
__                                                                          Adjustments 6.2                     QA                                                                 11.10 Lubrication
Review 11.11 Operation 6.4 I.B.
: 6. 3 -                   Review                                                             11.11 Operation 6.4                       I.B.                                                             11.12 As left 6.5                     Leads                                                             11.13 Cycle 9.1                     Acceptance                                                         11.14 Arc Chutes 11.1                     Clearance                                                         11.15 Document tion 11.2                     Visual                                                             11.16 QC 11.3                     Dust                                                               12.1 S.S.
11.12 As left 6.5 Leads 11.13 Cycle 9.1 Acceptance 11.14 Arc Chutes 11.1 Clearance 11.15 Document tion 11.2 Visual 11.16 QC 11.3 Dust 12.1 S.S.
11.4                     Cubicle                                                           12.2 18E 11.5                       Arc Chutes                                                         12.3 Forward   .
11.4 Cubicle 12.2 18E 11.5 Arc Chutes 12.3 Forward 11.6 As Found 11.7 Contacts Contact resistance left Middle Right Comments or Discrepancies:
11.6                       As Found 11.7                       Contacts Contact resistance left Middle Right Comments or Discrepancies:
i 545001E J
i 545001E
                                                  - - - - - - - _ _ _ - - - - - - _ - - - - . - - - -                      J


ENCLOSURE 13.2 TOOL, IE3TRUMENT, AND TOROUE VALUE LIST TCP/CN0/A/0006/00/0/SM WORK REQUEST INSTRUMENT / TOOL                   SERIAL NUMBER                                       CALIBRATION DUE DATE I
ENCLOSURE 13.2 TOOL, IE3TRUMENT, AND TOROUE VALUE LIST TCP/CN0/A/0006/00/0/SM WORK REQUEST INSTRUMENT / TOOL SERIAL NUMBER CALIBRATION DUE DATE I
ITEM TORQUED                         TORQUE VALUE                                         QC INSPECTOR 4
ITEM TORQUED TORQUE VALUE QC INSPECTOR 4
f List Leads Lifted / Jumpers Added or switches opened Terminal /Etc         Date Removed             Verified By                             Date Returned             Verified By
f List Leads Lifted / Jumpers Added or switches opened Terminal /Etc Date Removed Verified By Date Returned Verified By
                                                                              /                                                         /
/
                                                                              /                                                       '/
/
                                                                              /                                                       /
/
                                                                              /                                                       /               ;
'/
/
/
/
/
r 3
r 3
i 545001E
i 545001E


ENCLOSURE 13.3 FORCE TESTS AND TOLERANCE CHECKS OF THE UV DEVICE                                                                                   '
ENCLOSURE 13.3 FORCE TESTS AND TOLERANCE CHECKS OF THE UV DEVICE FOR WESTINGHOUSE DS-416 BREAKERS TCP/CN0/A/0006/00/0/SM Breaker Group Name BEFORE PREVENTIVE MAINTENANCE TESTING ON UV TRIP DEVICE 11.6.1 Force Test on Trip Bar 1bs.
FOR WESTINGHOUSE DS-416 BREAKERS TCP/CN0/A/0006/00/0/SM Breaker                                                       Group
(Trip load less than 2 lbs. Indicates satisfactory operation) 11.6.2 Force Test on UV Trip Device 1bs.
_                                                        Name BEFORE PREVENTIVE MAINTENANCE TESTING ON UV TRIP DEVICE 11.6.1         Force Test on Trip Bar 1bs.
4 (3.0 lbs. minimum) 11.6.3 Tolerance of o e-Travel was inches.
(Trip load less than 2 lbs. Indicates satisfactory operation) 4 11.6.2         Force Test on UV Trip Device 1bs.
(3.0 lbs. minimum) 11.6.3         Tolerance of o e-Travel was                                             inches.
(.03inchF.dmum)
(.03inchF.dmum)
Tolerance et Post Travel satisfactory (Yes or No) 11.6.4 Condition of roller bearing satisfactory (Yes or No)
Tolerance et Post Travel satisfactory (Yes or No) 11.6.4 Condition of roller bearing satisfactory (Yes or No)
AFTER PREVENTIVE MAINTENANCE TESTING ON UV TRIP DEVICE (A! L 11.12.1         Force Test on Trip Bar
AFTER PREVENTIVE MAINTENANCE TESTING ON UV TRIP DEVICE (A! L 11.12.1 Force Test on Trip Bar lbs.
.                                                                                                                  lbs.
(Trip load less than 2 lbs. indicates satisfactory operation) 11.12.2 Force Test on UV Device 1bs.
(Trip load less than 2 lbs. indicates satisfactory operation) 11.12.2         Force Test on UV Device                                                       1bs.
(3.0 lbs. minimum) 11.12.3
(3.0 lbs. minimum) 11.12.3       - Tolerance of Pre-Travel                                         inches.
- Tolerance of Pre-Travel inches.
Tolerance of Post Travel acceptable (Yes or No) 11.12.4         Condition of roller bearing satisfactory (Yes or No)
Tolerance of Post Travel acceptable (Yes or No) 11.12.4 Condition of roller bearing satisfactory (Yes or No)
TOTAL NUMBER OF TIMES BREAKER WAS TRIPPED                                                                             .
TOTAL NUMBER OF TIMES BREAKER WAS TRIPPED 5
5 545001E
545001E r-e
  $                r- e -rw+-way F   g gew-- c. g   ee-   ye-- -yvw--w**   p- m y gy -9sceVe "ewyv     e-e-   +-+New-we1-e-as+um         -w~'ew-- - -*g *w " ---W---mm+
-rw+-way F
g gew--
c.
g ee-ye--
-yvw--w**
p-m y gy -9sceVe "ewyv e-e-
+-+New-we1-e-as+um
-w~'ew--
-*g
*w
---W---mm+


e v
e v
Athkment- 3
Athkment-3 70 12.1.1 When to Inspect tion shows, for instance, heavy accimtulations of dirt or Industry standards for this type of equipment recommend other foreign matter that might cause mechanical, insula.
      ;            70 12.1.1 When to Inspect tion shows, for instance, heavy accimtulations of dirt or Industry standards for this type of equipment recommend                   other foreign matter that might cause mechanical, insula.                     o i               a general inspection and lubrication after the number of tion or other electrical damage, the inspection and maintenance interval should be decreased, I               operations listed in Section 123.1 of this instruction y
o i
f                book. 'Ihis should also be conducted at the endWhen                              of thea breaker opens a heavy fault, at or near its of fust six months of service if the number of operations has 7
a general inspection and lubrication after the number of tion or other electrical damage, the inspection and I
not been reached.                                                        rating, give it a visual inspection withdrawn from the                           -
operations listed in Section 123.1 of this instruction maintenance interval should be decreased, f
book. 'Ihis should also be conducted at the end of the When a breaker opens a heavy fault, at or near its y
fust six months of service if the number of operations has rating, give it a visual inspection withdrawn from the of 7
not been reached.
C mPartment and with insulating barriers and are chutes removed.
C mPartment and with insulating barriers and are chutes removed.
After the first inspection, inspect at least once a year, if these recommended inspections show no inaintenance1 .l.                               t to Inspect requirements, the period may be extended to a more                       First economical point. Conversely,if the recommended inspec.                             withdraw the breaker from the compartment.
After the first inspection, inspect at least once a year, if these recommended inspections show no inaintenance1.l.
Remove barriers. Remove are chutes. If there is a depo C           ,,    r .02o to .060 A                             C         ,,_,
t to Inspect requirements, the period may be extended to a more First economical point. Conversely,if the recommended inspec.
l wiia m m
withdraw the breaker from the compartment.
g j
Remove barriers. Remove are chutes. If there is a depo C
g          .te eh-                         m-t     '
r.02o to.060 A C
                                                                                        }
l wiia m
                                                                                                            %,           ~                                                ;
}
                                                                                                                                  -- h- ww .w.w w
~ m g
                        .      ,;,jh #                                                                                                                    '
j g
g, sv       :'
.te eh-m-t
                                                                                        -0.421 D8                         '
,;,jh #
                                        ,,,_ THESE FACES                                                                                                               j PARALLEL                                                                                                                   I t     k s
-- h-ww.w.w w g, sv
l
-0.421 D8
                          ,/     'l
,,,_ THESE FACES j
                                    ,o I
PARALLEL I
[ ...        h-                                                                                                                             ,h i
k t
                                      ~~~',             i                 s                                             ._._. .
l s
O
,/
                                        -@- I           .'
'l I
q           !
,o
g          rk:- .-tj                                                       p                         _.
[
_ _ _ .  .J-
h-
_.)_. . -
,h O
                                                                                                                                  . .-.,=g               0 l           l                                                                                   . - .. q.          n p::--J < g i:= 9k       ,
i
t                                              - - - *==- =*$                               U BREAKER CLOSED                                 *
~ ~ ~ ',
                                                                                'I' i
i s
                                                                                  \
I q
i M
rk:-.-tj p
B
.J g
                                                                                              / i                   ;
0
O
_.)_..
                                                                                                      .                                                  O       :
..-.,=g l
i                                                           :
l p::--J < g i:= 9k q.
BREAKER OPEN l
n
                                                                                                                                                          -                  3 Fig. 85 Contacts and their AJjustment, DS416l420 Breaker
- - - *==- =*$
                                                                                                                                                                    ~
t U
BREAKER CLOSED
'I' i
\\
.i M
/ i O
B O
i BREAKER OPEN l
3 Fig. 85 Contacts and their AJjustment, DS416l420 Breaker
~
Fig.
Fig.
'Me u.. }
'M e
o                                                                                                                                                           *
u.. }
                ,                                              ,---,          ,      -    , ,                - . .                                ,. -}}
o
-}}

Latest revision as of 04:16, 13 December 2024

Forwards Lists of Data Ltrs & Bulletins in Response to Generic Ltr 83-28 Item 3.1.2 Re Reactor Trip Sys Components & Response to Item 4.2 Concerning Description of Preventive Maint Program for Reactor Trip Breakers
ML20101P980
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 12/31/1984
From: Tucker H
DUKE POWER CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
GL-83-28, NUDOCS 8501070328
Download: ML20101P980 (16)


Text

-.

a DUKE Powen GOMPANY P.O. DOX 33180 CHARLOTTE. N.C. 28242 HALH. TUCKER ren.erssown vacu renomer (704) 373-4531 December 31, 1984 Mr. D. G. Eisenhut Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Re: Catawba Nuclear Station Docket Nos. 50-413, 50-414

Dear Mr. Eisenhut:

Our response of November.4, 1983 to Generic Letter 83-28 described our efforts regarding Item 3.1.2, Review of Vendor Engineering Recommendations for Reactor Trip System Components. We have completed our review of applicable Data Letters and Bulletins, the results of which can be found in Attachment 1.

This review included Westinghouse data letters and technical bulletins for all other safety-related components as well.

In response to Item 4.2 please find Attachment 2, a descripuion of the Preventative Maintenance Program for Reactor Trip Breakers which is currently in use at Catawba.

This is accomplished through procedure MP/0/A/2001/05, a copy of which is included.

As discussed in our original response of November 4, 1983, the results of the

. Life Cycle Testing program which was conducted by Westinghouse for the Westinghouse Owner's Group are to be incorporated into an updated Instruction Manual from Westinghouse. A replacement program for reactor trip system components will be incorporated into an upgraded Duke maintenance program when the new manual is issued.

In our status letter of November 2, 1984, the scheduled implementation date for the component replacement program was incorrectly stated as December 31, 1984.

Based upon timely receipt of the new Westinghouse manual implementation of the

- component replacement program at Catawba is expected by the end of the first scheduled refuelirig outage.

Very truly yours, d /$p Hal B. Tucker j

0 LTP/mjf tI1 Attachments

(

8501070328 841231.

PDR ADOCK 05000413:

PDR:

p L

i-Mr. D. G. Eisenhut, Director '

, December 31,.1984 Page two.

cc:

Mr..J. P. 0'Reilly, Regional Administrator U. S.' Nuclear Regulatory Commission

' Region'II.

1101 Marietta Street, ~MJ, Suite 2900

-Atlanta,. Georgia 30302-

Mr. R. A.- Birkel Division of Project Management Office of Nuclear Reactor Regulation U.-S.-Nuclear Regulatory Commission

' Washington, D.-C. 20555 Robert' Guild, Esquire Attorney-at-Law P. 0.-Box 12097 Charleston, South Carolina 29412 Mr. Jesse.L. Riley Carolina Environmental Study Group 854 Henley Place Charlotte,' North Carolina 3

-Dr. K. N. Jabbour-NRC Project Manager Office of Nuclear Reactor Regulation l-U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Ms.. Helen Nicolaras, Project Manager Office of Nuclear Reactor Regulation U. S.; Nuclear Regulatory Commission Washington, D. C. 20555 Mr.'J..C. Bryant LNRC Resident. Inspector-Oconee F.tclear Station LMr.'W. T. Orders NRC Resident Inspector McGuire Nuclear Station NRC Resident. Inspector

. Catawba Nuclear Station PalmettoLAlliance-2135 Devine Street

, Columbia..So'uth Carolina 29205-

~

~^

,.r---,

n

ATTACHMENT 1 DATA LETTERS 63-2 Nuclear Maintenance I & E concurs with Design Engineering that appropriate noise reduction techniques were utilized in the design and construction of Catawba Nuclear Station. Catawba I & E has agreed that appropriate noise reduction techniques will be considered

-in the implementation of future NSM packages.

Furthermore, Catawba Projects has agreed to make their personnel aware of these techniques.

63-5 The only mineral insulated cable we are aware of at Catawba is the cable used in the nuclear instrumentation and incore thermocouple applications. In both cases, vendor supplied, prefabricated cables were used (the cables and plugs were already assembled and ready to use). Therefore, this item does not affect Catawba. However, as a precaution the station was notified that any mineral insulated cable which is formed by site personnel for any future application should be heat dried just before sealing.

64-4 The use of any item containing lead within the primary system is controlled by a Materials Guide.and by Station Directives.

68-14 This Data Letter was originally written by Westinghouse with reference to their old 7100. series equipment, and is therefore not applicable to Catawba. Furthennore, the Precautions, Limitations & Setpoints manual is used to determine the proper setpoints.

68-25 The Vital Bus is never used to supply non-vital loads at any time.

68-31 The content of this Data Letter has been superseded.

68-36 This Data Letter is not applicable to Catawba Nuclear Station.

70-18 All essential equipment utilizing triaxial cable has been success-fully preoperationally tested. Furthermore, any faulty cable would already have been discovered during installation or testing.

71-20 There has been no problem with drifting output signals on Barton transmitters.

If there were any defective transmitters at Catawba, they would have been noticed by now. However, if any problems are noted, either the site Westinghouse representatives or Barton-representatives will be notified.

73-8 Breakers at Catawba Nuclear Station were originally sized based on manufacturer's specifications on the electrical loads, and also on Design Engineering calculations of the maximum motor starting current '

through each breaker. Any incorrectly sized breakers would be noticed during periodic breaker testing and preventative maintenance.

5

.._y.,.,-._

_ ~... -,. -.,.

,,,,_,v.

.,_7_

.-t

,,.._..m,

~,..-..,,...,,...,,,,.,,,,,,_.w

e -

ATTACHMENT 1 1

74-4

'No action by Duke Power Company. is required - this Data Letter was transmitted for our information.

77-2 Catawba Nuclear Station already uses the Keithley 602 electrometer.

77-3 This Data Letter is not applicable to Catawba Nuclear Station.

78-4 The recommended changes will be made to the appropriate instrument calibration procedures by Catawba I & E.

79 Station procedures specify the use of permanently installed voltmeters to ensure proper P-4 permissive contact operation following all reactor trips..These voltmeters were installed as a modification in

. response to a Westinghouse letter of 11-7-79 to the NRC.

80-3

.The proper connectors have already been ordered as spares, and the necessary instructions for their use are already in the appropriate instrument procedure..

80-8' It is a common practice of Catawba I & E to " exercise" the calibration potentiometers of a transmitter if the output of that transmitter is not steady.

';I b

I f

I e

t w

ATTACHMENT 1 TECHNICAL BULLETINS 73-24 Rev. 1 The potential for RF I & C interference as a result of the use of radio equipment within the station has already been addressed in response to IE Information Notice 83-83.

Catawba Nuclear Station has established administrative controls on areas where transmitter use will not be allowed.

74-12 No action is necessary for Catawba Nuclear Station Unit 1, as construction has been completed for this unit.

Catawba Constrection has committed to notify / train the electrical crews of this situation by December 31, 1984, in order to be alert for this potential problem on Unit 2.

This training will be documented on Construction Training Form V-lC.

75-2 This Technical Bulletin is not applicable to Catawba Nuclear Stu tion.

77-10 The actions recommended by this Technical Bulletin have been completed.

80-4 Catawba Nuclear Station was alerted to the possibility of the subject voltage oscillations occurring, and were instructed to notify both Westinghouse and Nuclear Maintenance I & E if any such oscillations are observed. None have been seen to date.

80-5 Catawba Nuclear Station plans to always use a reference power level of 100%, with Incore Axial Offset data taken at 75%.

However, a note will be added to the appropriate instrument i

procedure by I & E to. provide proper scaling for other refer-ence power levels.

80-6 This bulletin is not applicable, since Catawba Nuclear Station does not utilize 10-50 mA transmitters.

I 80-8 This Technical Bulletin is not applicable to Catawba Nuclear Station.

L 81-11

- Action on this Technical Bulletin has been completed for Catawba Nuclear Station.

81-13 Catawba Nuclear Station was not affected by this Technical Bulletin.

b

Catawba Nuclear Station Westinghouse DS-416 Reactor Trip Breakers i

Summary of Preventative Maintenance Program The subject breakers are cleaned, inspected, and tested every six months under procedure MP/0/A/2001/05. A description of the preven-tative maintenance follows below:

The breakers are given a visual inspection as they are removed from service.

If any cracked welds, broken parts, and/or loose or missing bolts are discovered, repairs are made immediately. The breakers are then cleaned by means of vacuum, compressed air, or an oil free solvent.

The cubicle is cleaned, and lubricated if necessary. Next, the arc chute shields, barriers, covers, and arc chutes are removed (wet arc chutes or insulators are dried with a suitable heat source).

A Force Test on the Trip Bar is performed, fo!1 owed by a Force Test on the UV Trip Device (the Trip Load must be less than 2 lbs., and the acceptance criteria for the latter test is 3.0 lbs. minimum).

Pre and Post Travel tolerances for the Trip Tap on the UV Trip Device are checked.

(No adjustments to the UV Trip Attachment are allowed to satisfy clearance requirements within the device or between the device and the reactor trip breaker shaft lever pin, unless a Westinghouse service representative is present.

If a UV device is in need of repair and no Westinghouse representative is present, a new UV device is installed).

Proper cleanliness and lubrication of the roller bearing is verified.

An inspection of.the contacts is now performed. They are cleaned, and contact wipe, contact resistance, pressure, and alignment are checked (see Attachment 3 for a drawing showing the alignment tolerances checked).

The mechanism linkage is checked for proper operation, including an.

inspection of every pin, keeper, or spring used in the assembly. Any necessary repairs are made. All other measurements and adjustments

- required by the instruction manual (CNM-1399.40-00ll) are made,'and then the equipment is lubricated and cleaned.

Finally, the breaker is tested mechanically and electrically for proper operation.

The Force Tests on the Trip Bar and UV Trip Device are performed again, and the Pre and Post Travel tolerances for the Trip Tap on the UV Trip Device are again checked. The roller bearing is re-examined, and then the breaker is cycled ten times (using the UV trip device).

Finally, all parts which were earlier removed (chutes, shields, etc.)

are reinstalled.

l t

ar: <,

Awhnt-2 i

l Form 34731 (1041)

(Formerly SPD 10021)

DUKE POWER COMPANY (1)

ID No: HP/0/A/2001/05 PROCEDURE PREPARATION Change (s) 0 to PROCESS RECORD 0

Incorporated (2)

STATION:

Catawba Nuclear (3) PROCEDURE TITLE:_ Westinghouse DS-416 Air Circuit Breaker Insoection and Staintenance (4) PREPARED BY:

Jeff Ashe DATE:

11/17/83 J>

2!/,5 /99 (5) REVIEWED BY:

[. 8e

/ DATE:

m S/20 W!f Cross-Disciplinary Review By:

SI N/R:

/e

(

(6) TEMPORARY APPROVAL (IF NECESSARY):

By:

(SRO) Date:

By:

Date:

(

(7) APPROVED BY:

me MC Date:

.3-2-N (8) MISCELLANEOUS:

Reviewed / Approved By:

Date:

((-/2 " b F

Reviewed / Approved By:

Date:

This' copy ~&as'6een's rpared REYlEWED BY QUAmY ASSURANCE DEARTMENT the cetrol co OPERATIONS DMSION Rd 18 Yerified corret Y

Y$ 2-/.SN Eat O

E REPRESENTATIVE DATE N

ar:,

Procedure TCP/CN0/A/0006/00/0/SM (MP/0/A/2001/05)

QA Department)A N Review A(

Date Section p

f Approval _4 V Date /2-/2-O 90 DUKE POWER COMPANY TRANSMISSION DEPARTMENT SUBSTATION DIVISION MAINTENANCE SECTION CHARLOTTE DISTRICT / GROUP CATAWBA LOCATION / STATION WESTINGHOUSE DS-416 AIR CIRCUIT BREAKER IN$PECTION AND MAINTENANCE NOTE:

Sections in this procedure that are preceded by an asterisk shall be initialed on Enclosure 13.1 of this procedure.

Double asterisks indicate QA inspection steps.

Sign off in step 11.16.

1.0 Purpose 1.1 This procedure establishes the requirenents to control the inspection and maintenance of Westinghouse DS-416 breakers.

2.0 References 2.1 Current copy of Instruction Manual for DS-416 Breakers.

CNM 1399.40-0011.

2.2 Westinghouse Drawing No. 693C350.

2.3 Westinghouse Drawing No. 588C785.

3.0 Personnel Requirements 3.1 The number of manhours necessary to complete the inspection and testing depends on the extent of repairs to be made.

Record actual manhours on the work request.

3.2 Personnel performing maintenance on Westinghouse DS-416 breakers shall have qualifications satisfying Catawba Nuclear Station Directive 2.7 and the Transmission Administrative Manual Section 2.3.

4.0 Safety Considerations 4.1 Equipment Clearance and Isolation

-4.1.1 Breaker maintenance will require that the breaker be racked out to the disconnect position and placed on the floor. Red tags should be issued if needed according to Catawba Nuclear Station Directive 3.1.1.

545001H

.. =.

o

< 1,.

4.2 Health Physics Considerations 4

4.2.1 If the work request indicates, obtain a Radiation Work Permit or a Standing Radiation Work Pemit from Health Physics.

)

4.3 Special Safety Considerations 4.3.1 Assure good ventilation or use air masks when using "Penolene",

" Spot Check", or similar chlorinated hydrocarbon cleaners.

4.3.2 Use red tape to identify any exposed high voltage creas and warn personnel of any possible shock hazards.

5.0 Station (or Unit) Status l'

  • 5.1 Routine maintenance on breakers should coincide with PM requirements and Technical Specification requirements. Availability should be determined by the shift supervisor or his superior, in order to insure safe unit operation.

6.0 Prerequisites

  • 6.1 Verify that this procedure is the same as the control copy at the p

station.

  • 6.2 Notify Quality Assurance personnel before beginning work if the Work Request so indicates.

+

i

  • 6.3 Before or during the job, the job supervisor, planner, or engineer shall review, initial and "N/A" any procedure steps that are not applicable to the job.

li

  • 6.4 If necessary, obtain current manufacturer's drawings and/or instruction books.

-**6.5 While performing this procedure if any leads are lifted, jumpers added, or switches opened or closed, double verification of removal and double verification of replacement must be documented on Enclosure 13.2.

7.0 Repair Parts 7.1 Work on safety related breakers will require - Quality Assurance approved parts.

7.2-Parts utilized during repairs will be listed 'on the Work Request.

The Work Request must be presented at the parts room to obtain parts.

l.

8.0 Special Tools

    • 8.1 Verify that calibration dates on tools and measurement equipment Record serial number and calibration date due. on Enclosure 13.2.

are cu* rent.

545001H

9.0 Acceptance Requirements Note:

This section is applicable only when a complete PM of the breaker is perfonned and need not be initialed when making minor repairs or adjustments that may arise between scheduled PM periods.

  • 9.1 The successful completion of the applicable parts of Section 11.0 of this procedure will detemine the acceptability of the A. C. B.

10.0 Interference Items None 11.0 Procedure Note:

The following steps are not necessarily required to be performed in chronological order. Some steps may be performed at any time. This procedure is to be used as a guide by experienced breaker retairmen only.

  • 11.1 Verify that the Work Request has been approved, and the " Clearance to Begin Work" section has been properly completed.

Be sure the breaker is de-energized and/or red tagged.

Maintain all enclosum: + bat are applicable to the maintenance activity being performed.

    • 11.2 Visually check equipment as removed from service.

Inspect the equipment for broken parts, cracked welds, and/or loose or missing bolts.

Repair or replace any damaged parts and record action taken.

  • 11.3 Remove dust and dirt by vacuum, air, or oil free solvent.
    • 11.4 Clean and inspect cubicle for loose hardware or broken parts and lubricate where necessary.
  • 11.5 Remove are chute shields, barriers, covers, and arc chutes.

" Wet" arc chutes or insulators may be dried with a heat gun, oven, or other heat source.

  • 11.6 Perform the following tests and record the data obtained on 3.3.

Include the total number of times the breaker was tripped.

Before preventive maintenance testing on UV trip device "AS FOUND" Westinghouse Drawing No. 693C350 and No. 58SC785 should be consulted if needed.

11.6.1 Perform a Force Test on the Trip Bar.

11.6.2 Perform a Force Test on the UV trip device.

11.6.3 Check the tolerances regarding Pre and Post Travel of the Trip Tap on the UV trip device.

545001H

=

e 11.6.4 Check the condition of the roller bearing with regard to the proper cleanliness and lubricant.

r 11.6.5 Should a UV device be found faulty and adjustments cannot be made, field installation of a new UV device should.be made as per Westinghouse Drawing No. 588C735.

No adjustments to the undervoltage trip attachment are to be made in the field to satisfy either intracisarance requirements (within the device proper) or interclearance requirements (between the device and the RTB trip shaft lever pin) without an appropriate Westinghou e service representative present.

    • 11.7 Inspect the' ' contacts;
clean, check contact
dipe, contaci resistance, pressure ard alignment.

This includes checking measurements as y

per instruction book. ' Repair or replace as needed.

F

    • 11.8 Inspect mechanism linkage for binding, looseness, worn or defective i

parts.

Check every pin, keeper, and spring in the mechanisn.

Repair or replace as needed.

c 3

  • 11.9 Make and/or check any mechanism measurements and adjustments needed

.per instruction or technical bulletins and record on Enclosure 13.1.

n

  • 11.10 Lubricate and perfonn finai cleantag of the equipmept.

s

  • 11.11 Check breaker operation mechapi ally and electrically.

t

  • 11.12 Ferform the following tests and record the data obtained on Enclosure =13.3.

' [

,f After preventive maintenance testing of UV device "AS LEFT" s

e Westinghouse Drawing rio 69.'C350 and No. 588C785 should be consulted if m

F needed.

J

    • 1.1.12J, Perform a Force Tes : in the Trip Bar.

t b

    • 11.12.2 Perform a Force Test on the UV Trip Device, r

f

[

  • '11.12.3 Check the tolerances regarding Pre and Post Travel of' the Trip Tab P

'on the UV Trip Device.

9

    • 11.12.4

~

/

Check the condition of the miler bearing with regsrd to the proper cleanliness and lubricant.

t-s 1

    • 11.13 On the test bench, Sycle the breaker ten times udng the UV trip a

device.

Report any failuresip appropriate personnth Ew

/

[

    • 11.14 Install necessary parts (chutes, chields, and /ront cover).
  • 11.15 Complete all documentation on the Work Request and the Enc'icsures.

~

  • 11.16 Q.C. inspector veriff es that $lh inspectioris with double asterisks 4

/g 5qave been performed.

E

./

E

=

$ ?

1

T 12.0 Restoration

  • 12.1 Contact the shift supervisor to clear the red tags if any were issued and return the breaker to the station for operation.
  • 12.2 Notify the I&E group for additional testing requirements.

i

  • 12.3 Forward the completed copy of the Work Request and applicable enclosures to the Planning Office or the Station Support Engineer.

13.0 Enclosures 13.1 Procedure Checklist 13.2 Tool, Instrument, and Torque Value List 13.3 Force Tests and Tolerance Checks for UV Device S

6 v

1A$

A s

I 1

?

c fN

=

(\\ \\

I

.E '

-'f 2

545001H

ENCLOSURE 13.1 PROCEDURE CHECKLIST TCP/CN0/A/0006/00/0/SM Foreman W.R. #

Date Breaker Nameplate: Type Mfr Volts Amps Serial #

5.1 Status 11.8 Mechanism 6.1 Verification 11.9 Adjustments 6.2 QA 11.10 Lubrication

6. 3 -

Review 11.11 Operation 6.4 I.B.

11.12 As left 6.5 Leads 11.13 Cycle 9.1 Acceptance 11.14 Arc Chutes 11.1 Clearance 11.15 Document tion 11.2 Visual 11.16 QC 11.3 Dust 12.1 S.S.

11.4 Cubicle 12.2 18E 11.5 Arc Chutes 12.3 Forward 11.6 As Found 11.7 Contacts Contact resistance left Middle Right Comments or Discrepancies:

i 545001E J

ENCLOSURE 13.2 TOOL, IE3TRUMENT, AND TOROUE VALUE LIST TCP/CN0/A/0006/00/0/SM WORK REQUEST INSTRUMENT / TOOL SERIAL NUMBER CALIBRATION DUE DATE I

ITEM TORQUED TORQUE VALUE QC INSPECTOR 4

f List Leads Lifted / Jumpers Added or switches opened Terminal /Etc Date Removed Verified By Date Returned Verified By

/

/

/

'/

/

/

/

/

r 3

i 545001E

ENCLOSURE 13.3 FORCE TESTS AND TOLERANCE CHECKS OF THE UV DEVICE FOR WESTINGHOUSE DS-416 BREAKERS TCP/CN0/A/0006/00/0/SM Breaker Group Name BEFORE PREVENTIVE MAINTENANCE TESTING ON UV TRIP DEVICE 11.6.1 Force Test on Trip Bar 1bs.

(Trip load less than 2 lbs. Indicates satisfactory operation) 11.6.2 Force Test on UV Trip Device 1bs.

4 (3.0 lbs. minimum) 11.6.3 Tolerance of o e-Travel was inches.

(.03inchF.dmum)

Tolerance et Post Travel satisfactory (Yes or No) 11.6.4 Condition of roller bearing satisfactory (Yes or No)

AFTER PREVENTIVE MAINTENANCE TESTING ON UV TRIP DEVICE (A! L 11.12.1 Force Test on Trip Bar lbs.

(Trip load less than 2 lbs. indicates satisfactory operation) 11.12.2 Force Test on UV Device 1bs.

(3.0 lbs. minimum) 11.12.3

- Tolerance of Pre-Travel inches.

Tolerance of Post Travel acceptable (Yes or No) 11.12.4 Condition of roller bearing satisfactory (Yes or No)

TOTAL NUMBER OF TIMES BREAKER WAS TRIPPED 5

545001E r-e

-rw+-way F

g gew--

c.

g ee-ye--

-yvw--w**

p-m y gy -9sceVe "ewyv e-e-

+-+New-we1-e-as+um

-w~'ew--

-*g

  • w

---W---mm+

e v

Athkment-3 70 12.1.1 When to Inspect tion shows, for instance, heavy accimtulations of dirt or Industry standards for this type of equipment recommend other foreign matter that might cause mechanical, insula.

o i

a general inspection and lubrication after the number of tion or other electrical damage, the inspection and I

operations listed in Section 123.1 of this instruction maintenance interval should be decreased, f

book. 'Ihis should also be conducted at the end of the When a breaker opens a heavy fault, at or near its y

fust six months of service if the number of operations has rating, give it a visual inspection withdrawn from the of 7

not been reached.

C mPartment and with insulating barriers and are chutes removed.

After the first inspection, inspect at least once a year, if these recommended inspections show no inaintenance1.l.

t to Inspect requirements, the period may be extended to a more First economical point. Conversely,if the recommended inspec.

withdraw the breaker from the compartment.

Remove barriers. Remove are chutes. If there is a depo C

r.02o to.060 A C

l wiia m

}

~ m g

j g

.te eh-m-t

,;,jh #

-- h-ww.w.w w g, sv

-0.421 D8

,,,_ THESE FACES j

PARALLEL I

k t

l s

,/

'l I

,o

[

h-

,h O

i

~ ~ ~ ',

i s

I q

rk:-.-tj p

.J g

0

_.)_..

..-.,=g l

l p::--J < g i:= 9k q.

n

- - - *==- =*$

t U

BREAKER CLOSED

'I' i

\\

.i M

/ i O

B O

i BREAKER OPEN l

3 Fig. 85 Contacts and their AJjustment, DS416l420 Breaker

~

Fig.

'M e

u.. }

o

-