ML20107A534: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:l     --            .
{{#Wiki_filter:l AVLl; AGE !)All) UNil POwl t LI VI.t
AVLl; AGE !)All) UNil POwl t LI VI.t
~
                                                            ~
DOCKET NO.
DOCKET NO.               50-250 UNil. Turkey Point Unit #3 DATE 1/15/85 COMPLETED BY                   N.W. Grant TELEPilONE (305)552-3675 MONTH       December, 1984 DAY           AVER ACE DAILY POWER LEVEL                               DAY   AVER AGE DAILY POWER LEVEL o                                       IMWe Net)                                                   .(MWe Neil I                 6R1                                           gf                 ___
50-250 UNil. Turkey Point Unit #3 DATE 1/15/85 COMPLETED BY N.W. Grant TELEPilONE (305)552-3675 MONTH December, 1984 DAY AVER ACE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL o
2                682                                           gg                 ___
IMWe Net)
3 673                                            ,,                  .__
.(MWe Neil I
4                 675 20                 ---
6R1 gf 2
5 674                                                                ___
682 gg 673 3
i 6               672                                             22                 ---
675 4
7                681 23                 ---
20 674 5
g                697 24               ---
i 6
9                697 25               ---
672 22 7
10               696                                             26               ---
681 23 g
3 696                                                              ---
697 24 9
2' _
697 25 10 696 26 696 3
32               694                                                                               '
2' 32 694 25 13 29 14 30
25               ---
~~~
13                                                                 29               ---
~~~
                                                                                                      ~~~
15 33 I
14                                                                30
                                  ~~~
15                                                                 33 I
INSTRUCTIONS On this format.lar the aveuge daily unit power lesel in MWe Nei for cach day in the reportin; m.inth. Compute to the nearest whiite expwast.
INSTRUCTIONS On this format.lar the aveuge daily unit power lesel in MWe Nei for cach day in the reportin; m.inth. Compute to the nearest whiite expwast.
8502200020 841231 gDR       ADOCK 05000250                                                                                       f PDR                                                                               hi
8502200020 841231 gDR ADOCK 05000250 f
                                                                                                                                                \
PDR hi
\\


I
~
    ~       .
OPERATING DATA RLPORT DOCKET NO- --
OPERATING DATA RLPORT DOCKET NO- --
DATE .1 /15/85 COMPLETED BY N. W. ' Grant TELEPHONL (305)SS2-3675 OPERATING STATUS Notes
DATE.1 /15/85 COMPLETED BY N. W. ' Grant TELEPHONL (305)SS2-3675 OPERATING STATUS Notes
: 1. Unit Name: Turkey Point Unit #3                                       See the, Unit Shutdowns and
: 1. Unit Name:
Turkey Point Unit #3 See the, Unit Shutdowns and December,1984
: 2. Reporting Period:
: 2. Reporting Period:
December,1984 2200                 Power Reductions" Report
2200 Power Reductions" Report
: 3. Licensed Thermal Power (MWI):
: 3. Licensed Thermal Power (MWI):
0 o'       4. Namepiste Rating (Gross MWe):                                                   ,
0 o'
: 4. Namepiste Rating (Gross MWe):
: 5. Design Electrical Rating (Net MWe):
: 5. Design Electrical Rating (Net MWe):
: 6. Maximum Dependable Capacity (Gross MWe):           700 666
700
: 6. Maximum Dependable Capacity (Gross MWe):
666
: 7. Maximum Dependable Capacity (Net MWe):
: 7. Maximum Dependable Capacity (Net MWe):
: 8. If Changes Occur in Capacity Ratings (llems Number 3 Through 7) Since Last Report, Give Reasone
: 8. If Changes Occur in Capacity Ratings (llems Number 3 Through 7) Since Last Report, Give Reasone
: 9. Power I.svel To Which Restricted.lf Any (Net MWe):
: 9. Power I.svel To Which Restricted.lf Any (Net MWe):
: 10. Reasons For Restrictions.lf Any:
: 10. Reasons For Restrictions.lf Any:
This Month             Yr.-to Date         Cumulative
This Month Yr.-to Date Cumulative
: 11. Hours in Repo:1ing Period                               744                 8784               10RR44.6
: 11. Hours in Repo:1ing Period 744 8784 10RR44.6
: 12. Number Of Hours Reactor Was Critical                     288.3               7366.6                 73672.8
: 12. Number Of Hours Reactor Was Critical 288.3 7366.6 73672.8 0
: 13. Reactor Reserve Shutdown Hours 0                      0     -
0 844.4
844.4
: 13. Reactor Reserve Shutdown Hours 288.3 7357.1 73179.1
: 14. Hours Generator On Line 288.3               7357.1                 73179.1 0                     0                         121.8
: 14. Hours Generator On Line 0
0 121.8
: 15. Unit Reserve Shutdown 1(ours
: 15. Unit Reserve Shutdown 1(ours
: 16. Gross Thermal Energy Generated (MWH)             619365                 1R640914           -141194;11
: 16. Gross Thermal Energy Generated (MWH) 619365 1R640914
: 17. Gross Electrical Energy Generated (MWH)           207160       , _ .      5046130           48255695 a         18. Net Electrial Energy Generated (MWH)             193577                 4784209           45697206
-141194;11
: 19. Unit Service Factor                                     30;8                     82.6                     69.1
: 17. Gross Electrical Energy Generated (MWH) 207160 5046130 48255695 a
: 20. Unit Availability Factor                                 38.8                     82.6                     69.3
: 18. Net Electrial Energy Generated (MWH) 193577 4784209 45697206
: 21. Unit Capacity Factor (Using MDC Net) 39.1                     81.8         ,          33 L i        22. Unit Capacity Factor (Using DER Net)                     37.5                     78.6                     62.3 i        23. Unit Forced Outage Rate                                  61.3                     14.7                     6.4
: 19. Unit Service Factor 30;8 82.6 69.1
: 20. Unit Availability Factor 38.8 82.6 69.3 39.1 81.8 33 L
: 21. Unit Capacity Factor (Using MDC Net) 37.5 78.6 62.3
: 22. Unit Capacity Factor (Using DER Net) i 61.3 14.7 6.4 i
: 23. Unit Forced Outage Rate
: 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Eacht:
: 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Eacht:
Refueling March 30, 1985, 11 weeks                                                                   .
Refueling March 30, 1985, 11 weeks 1
1
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
j         26. Units in Test Status (Prior eo Commercial Operation):                     Forecast             Arisiaed l     .              ,
j
INITI AL CRITICALITY                                                         __
: 26. Units in Test Status (Prior eo Commercial Operation):
l                                INITIAL ELECTRICITY COMMERCI AL OPER ATION                                                         ,_.
Forecast Arisiaed l
INITI AL CRITICALITY l
INITIAL ELECTRICITY COMMERCI AL OPER ATION


1 i
1 i
DOCKET NO. 50-250 UNIT SHUTDOWNS AND POWER REDUCTIONS                           UNIT NAME 'rnrkm m,, r+ rh,it #3 DATE l /.l 6186                                                           .
DOCKET NO. 50-250 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME 'rnrkm m,, r+ rh,it #3 DATE l /.l 6186 ND BY PL W Grant REPORT MONTHDecmber, 1984 17.t.EPHONE (305) 552-3675 5
REPORT MONTHDecmber, 1984 ND BY PL W Grant 17.t.EPHONE (305) 552-3675
E
                                                                                                  -    5                                E
]g 3
                                                                  -,-      ]g         3           *E3           Licensee     Eg                               Cause & Corrective
*E3 Licensee Eg Cause & Corrective
                                                                                                                                                                      ^''*'"
^ ' ' * ' "
: i.                             N. .                       Date     i       3g               it   js&             Event       3,7       Ed mU b-      y=             5       ggg           Report a               g                      Prevent Recurrence l                                                                                                     6 I
i.
19               84 12 13         F     455.7             A         3     250-84-33       Im       GENEPA     A short to ground in the Unit'#3 generator exciter caused a turbine trip which resulted in a reactor trip.
N..
                                                                                                                                                  'Ihe exciter was replaced.
Date i
l I                                   2                                                         3                                   4 F: Forced                         Reason:                                                     Method:                             Exhibit G - Instructions S Scheduled                       A-Equipment Failure (Esplain)                               1 -Manual                           for Preparation of Data B-Maintenance or Test                                       2-Manual Scram.                     Entry Sheets for Licensee C-Refueling                                                 3- Automatic Scram.                 Event Report (LERI File (NUREG-                                                   '
3g it js&
D-Regulatory Restriction                                   @-Other iExplain)                     0161)                                                                       ,
Event 3,7 Ed y=
I;-Operator Traming A bcense Esamination
5 ggg Report a mU Prevent Recurrence b-g l
,,                                            ,                F Adnunistrative                                          k ~ O * ** ** """                 5 s-. f.4. m ,. ,#
6 I
G.Operatomal I ire.r i F splam l                                                                Ethibit I - Same Source
19 84 12 13 F
,                        l's/77 )                               Il-Other ( E xplain)
455.7 A
3 250-84-33 Im GENEPA A short to ground in the Unit'#3 generator exciter caused a turbine trip which resulted in a reactor trip.
'Ihe exciter was replaced.
l I
2 3
4 F: Forced Reason:
Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Esplain) 1 -Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LERI File (NUREG-D-Regulatory Restriction
@-Other iExplain) 0161)
I;-Operator Traming A bcense Esamination k ~ O * ** ** """
5 F Adnunistrative G.Operatomal I ire.r i F splam l s-. f.4.
m,.,#
Ethibit I - Same Source l's/77 )
Il-Other ( E xplain)


==SUMMARY==
==SUMMARY==
OF OPERATING 2XPERIENCE DOCKET NO..       50-250-UNIT Turkey Point Unit #3.
OF OPERATING 2XPERIENCE DOCKET NO..
DATE January 15, 1985 COMPLETED BY                     N. W. Grant             s TELEPHONE     (305) 552-3675 REPORT 110 NTH             December, 1984-See the' Unit Shutdowns 'and Power Reductions" Report.
50-250-UNIT Turkey Point Unit #3.
DATE January 15, 1985 COMPLETED BY N. W. Grant s
TELEPHONE (305) 552-3675 REPORT 110 NTH December, 1984-See the' Unit Shutdowns 'and Power Reductions" Report.
Inspection and requirements of IE Bulletins and NUREG 0737 are continuing.
Inspection and requirements of IE Bulletins and NUREG 0737 are continuing.
Florida Power & Light. Company commitments for NUREG-0373 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.
Florida Power & Light. Company commitments for NUREG-0373 implementation are continuing.
Refer to correspondence between FPL and NRC for additional information.
s 1
s 1
1 t
1 t
A     __.      _    . _ - -  _ _ . _ _ _ . . _ _ _ _ _ __ , _ _ _ , _                      __
A


i AVLl; AGE DAll i tWil POwi k LI VI.t                                               j DOCKET NO.           50-251 UNir Turkey Point Unit #4 DATE 1/15/85-COMPLETED BY H. W. Grant TELEPilONE (305)552-3675 MONTH           December. 1984 DAY               AVER ACE DAILY POWER LEVEL                       DAY   AVER AGE DAILY POWER LEVEL i                                       IMWe. Net)                                         -(MWe Neu 3
i AVLl; AGE DAll i tWil POwi k LI VI.t j
gj             688 2                     ---
DOCKET NO.
is             687 3                     ---
50-251 UNir Turkey Point Unit #4 DATE 1/15/85-COMPLETED BY H. W. Grant TELEPilONE (305)552-3675 MONTH December. 1984 DAY AVER ACE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL i
39             6b9__
IMWe. Net)
4                      385                                                 688 20 5                     676                                 al             686 6                     677                                 22             685 7                     684                                                 685 23 g                    693                                                 686 74 9                     692                                                 684 25                                         _
-(MWe Neu 3
10                       693                                                 683 26 693                                                 684 12                       693                                                 685 28 13                       687                                                 686 29 14                       6nn                                                 685 30 15                       688                               3,             684 16                       M7 INSTRUCTIONS On this forenas. list the average daily unit pinwer leselin MWe Nes for each day in the rep.istin;in.inth. Compute to the nearest whiite twgawars.
gj 688 2
                                    .                                                                                          19/77) 9                       -  -
is 687 3
39 6b9__
385 688 4
20 5
676 al 686 6
677 22 685 7
684 685 23 693 686 g
74 9
692 684 25 10 693 683 26 693 684 12 693 685 28 13 687 686 29 14 6nn 30 685 15 688 684 3,
16 M7 INSTRUCTIONS On this forenas. list the average daily unit pinwer leselin MWe Nes for each day in the rep.istin;in.inth. Compute to the nearest whiite twgawars.
19/77) 9


OPERATING DATA REPORT 50-251 DOCKET DATE NO. P15/85 COMPLETED BYN. W. Grant TELEPHONL (3tnsiS52-3675 OPERATING STATUS
OPERATING DATA REPORT 50-251 DOCKET NO. P15/85 DATE COMPLETED BYN. W. Grant TELEPHONL (3tnsiS52-3675 OPERATING STATUS Turkey Point Unit #4 Notes
      ,, g g Turkey Point Unit #4                                   Notes
,, g g
: 2. Reporting Period:     December. 19Rd                                   See the unit shutdowns and
: 2. Reporting Period:
: 3. Licensed Thermal Power (MWI):                   ?200                   power reductions report.
December. 19Rd See the unit shutdowns and
  . 4. Nameplate Rating (Gross MWe):
: 3. Licensed Thermal Power (MWI):
* 6
?200 power reductions report.
: 4. Nameplate Rating (Gross MWe):
6
: 5. Design Electrical Rating (Net MWe):
: 5. Design Electrical Rating (Net MWe):
: 6. Maximum Dependable Capacity (Gross MWe):         70n
70n
: 7. Maximum Dependable Capacity (Net MWe):           666
: 6. Maximum Dependable Capacity (Gross MWe):
666
: 7. Maximum Dependable Capacity (Net MWe):
: 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report,Give Reasone
: 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report,Give Reasone
: 9. Power 1.nel To Which Restricted. lf Any (Net MWe):
: 9. Power 1.nel To Which Restricted. lf Any (Net MWe):
: 10. Reasons For Restrictions.lf Any:
: 10. Reasons For Restrictions.lf Any:
This Month             Yr..to.Date         Cumulative
This Month Yr..to.Date Cumulative 744 8784 99581
: 11. Hours in Reporting Period                             744                    8784                      99581
: 11. Hours in Reporting Period 669.1 5079.8 69718.4
: 12. Number Of Hours Reactor Was Critical 669.1                  5079.8                    69718.4
: 12. Number Of Hours Reactor Was Critical
: 13. Reactor Reserve Shutdown Hours                           0                       .0     ,_
: 13. Reactor Reserve Shutdown Hours 0
166.6
.0 166.6
: 14. Hours Generator On.Line                               663.4                   4772.1                     67240.2 0                           0                       31.2
: 14. Hours Generator On.Line 663.4 4772.1 67240.2 0
0 31.2
: 15. Unit Reserve Shutdown gours
: 15. Unit Reserve Shutdown gours
: 16. Gross Thermal Energy Generated (MWH)           .1449439.                10383365              142130106
.1449439.
: 17. Gross Electrical Energy Generated (MWH)           476055       , _ .
10383365 142130106
1771ngs;               aslopto7
: 16. Gross Thermal Energy Generated (MWH)
: 18. Net Electrical Energy Generated (MWH)'             452898                  3079222                427R1?R1        ,
: 17. Gross Electrical Energy Generated (MWH) 476055 1771ngs; aslopto7 452898 3079222 427R1?R1
1    19. Unit Service Factor                                    89.2                       54.3           -        67.5
: 18. Net Electrical Energy Generated (MWH)'
: 20. Unit Availability Factor                               89.2                       54.3                     67.6   l
89.2 54.3 67.5
: 21. Unit Capacity Factor (Using MDC Net) 91.4                        52.6                    6M
: 19. Unit Service Factor 1
: 22. Unit Capacity Factor (Using DER Net)                   87~.8                       50.6                     62.0
: 20. Unit Availability Factor 89.2 54.3 67.6 91.4 52.6 6M
: 23. Unit Forced Outage Rate                                10.8                       24.1                     6.1
: 21. Unit Capacity Factor (Using MDC Net)
: 22. Unit Capacity Factor (Using DER Net) 87~.8 50.6 62.0 10.8 24.1 6.1
: 23. Unit Forced Outage Rate
: 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Eacht:
: 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Eacht:
l l
l anuan 2 M (adual)
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:     anuan 2 M (adual)
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 26. Units in Test Status (Prior io Commercial Operation):                       Forecast             Atinioed         I INITIAL CRITICALITY INITI AL ELECTRICITY COMMERCI AL OPER ATION                                       -
: 26. Units in Test Status (Prior io Commercial Operation):
Forecast Atinioed INITIAL CRITICALITY INITI AL ELECTRICITY COMMERCI AL OPER ATION


DOCKETNO. 50-251 UNIT SHUTDOWNS AND POWER REDUCTIONS                         UNITNAMETurkev Point tinit (4 -
DOCKETNO. 50-251 UNIT SHUTDOWNS AND POWER REDUCTIONS UNITNAMETurkev Point tinit (4 -
DATE 1/15/85                 .
DATE 1/15/85 CORWLETED BY N.
CORWLETED BY N. W- Cran +-
W-Cran +-
REPORT MONT1g Decmber. 1984                                       ,yq3   qq,,_ ,q
REPORT MONT1g Decmber. 1984
                                                                  -_E                                   E
,yq3 qq,,_,q
                                    ,-      .] 3       3       j E~         Licensee     Eg           .                  Cause & Corrective
-_E E*
                                                                                                                                    ^''"'"
.] 3 3
    .          N..         Date     i       3g           (     2g&             Event       g'2 mO g*b E
j E~
Prevent Recurrence Report 8              g H
Licensee Eg Cause & Corrective g*b
fE           &      j;ji g i
^ ' ' " ' "
d 25     84 11 24   F     80.6             A         4     251-84-25       CB       CKIBKR     Reactor trip on low flow resultirg frcm failed RCP breaker. Breaker repaired.
N..
4 I                   2                                                       3                                 4 1               F Forced           Reas m:                                                   Method:                           Exhibit G Instructions 5 Stheduled         A Equiprnent Failure (Explain)                           1-Manual                           for Preparation of Data B-Maintenance or Test                                     2-Manual Scram.                   Entry Sheets for Licensee C Refueling                                               3 Automatoc Scram.                 Event Repor:ILER) File (NUREG-D-Regulatory Rest:iction                                 9-Other (Explain 1                 01611                     ,
Date i
l.-Operator Traming A Ucense Enamination F- Administrative                                        M ~ O *"" ''""                 5 G-Operati. mal I e r..r I F =plem t                     x-   /.. a a s e w . ,#           Exhibit I - Same Source tas/77)               Il-Other i E xplain t
3g
(
2g&
Event g'2 E
Prevent Recurrence fE j;ji g Report 8 mO H
g d
i 25 84 11 24 F
80.6 A
4 251-84-25 CB CKIBKR Reactor trip on low flow resultirg frcm failed RCP breaker. Breaker repaired.
4 I
2 3
4 1
F Forced Reas m:
Method:
Exhibit G Instructions 5 Stheduled A Equiprnent Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling 3 Automatoc Scram.
Event Repor:ILER) File (NUREG-D-Regulatory Rest:iction 9-Other (Explain 1 01611 l.-Operator Traming A Ucense Enamination M ~ O *"" ''""
5 F-Administrative G-Operati. mal I e r..r I F =plem t x-
/.. a a s e w.,#
Exhibit I - Same Source tas/77)
Il-Other i E xplain t


GUMMARY OF OPERATING EXPERIEECE DOCKET NO.         50-251 UNIT   Turkey Point Unit #4 DATE   J_anuary 19. 1985 COMPLETED BY       N. W. Grant TELEPHONE       (305) 552-3675 REPORT MONTH         pecomher. 1984 o                                                     .
GUMMARY OF OPERATING EXPERIEECE DOCKET NO.
!              Unit.#4 operated at essentially full poweF except as noted on Unit Shutdown Report.
50-251 UNIT Turkey Point Unit #4 DATE J_anuary 19. 1985 COMPLETED BY N. W. Grant TELEPHONE (305) 552-3675 REPORT MONTH pecomher. 1984 o
Unit.#4 operated at essentially full poweF except as noted on Unit Shutdown Report.
Inspection and requirements of IE Bulletin and NUREG -0737 are continuing.
Inspection and requirements of IE Bulletin and NUREG -0737 are continuing.
Florida Power & Light Company commitments to NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.
Florida Power & Light Company commitments to NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.
a l
a l
  ._-_A.--_.-
. - A.--.-


AVLl; AGE D All i UNil PD*1 }; Ll VI.I DOCKET NO. 50-333 g.,)St. Lucie Unit #1 DATE 1/15/85 0051PLETED BY N. W. Grant TELEPilONE(305)552-3675 MONm       December, 1984                   .
AVLl; AGE D All i UNil PD*1 }; Ll VI.I DOCKET NO. 50-333 g.,)St. Lucie Unit #1 DATE 1/15/85 N. W. Grant 0051PLETED BY TELEPilONE(305)552-3675 MONm December, 1984 DAY AVER ACE DAILY POWER LEVEL DAY AVER ACE DAILY POWER LEVEL IMWe Net)
DAY     AVER ACE DAILY POWER LEVEL                                     DAY               AVER ACE DAILY POWER LEVEL IMWe Net)                                                                                 -(MWe Net i I                 852                                                        j                                 853 2                 851                                                                                           855 is 4          3                 ""O                                 ,
-(MWe Net i 852 I
19                                     w7 4               850                                                                                           ---
j 853 2
.;                                                                                  20 5               851                                                                                           155 21 6               850                                                   22                                     780 7               854                                                                                         796 23 8               857                                                   24                                   843 9               855                                                                                         844 25 10               856                                                                                         838 26           _
851 is 855 3
ll               853                                                   27                                   834 la               854                                                                                         844 2s 13 854                                                                                         845 29         -
""O 19 w7 4
14               853                                                                                         846 30 15               853                                                                                       816 33 16               RS3 INSTRUCTIONS
4 850 20 5
            '    ''" ''        'esage daily unis p.mer leselin MWe.Nei for each day :: the reporting month. Compute su he earest hiil   asva
851 21 155 6
                          .                                                                                                                                                          i,mi S
850 22 780 7
                                          ,    a   ,  .-g.,-.,   , .
854 23 796 8
c., ,- - . - .-,    r-      - - - - - , , - , , - - - . , - - - . . , . . - -        . , . . - - - - - - .        . - - - -
857 24 843 9
855 844 25 10 856 838 26 ll 853 27 834 la 854 844 2s 854 845 13 29 14 853 30 846 15 853 816 33 16 RS3 INSTRUCTIONS
'esage daily unis p.mer leselin MWe.Nei for each day :: the reporting month. Compute su he earest hiil asva i,mi S
a
.-g.,-.,
c.,
r-


OPERATING DATA REPORT DOCKET NO.50-335 DATElDb/66 COMPLETED TELEPHONL 305) 552-3675BY( A. W OPERATING STATUS Notes
OPERATING DATA REPORT DOCKET NO.50-335 DATElDb/66 COMPLETED BY( A. W TELEPHONL 305) 552-3675 OPERATING STATUS Notes
: 1. Unit Name: "       I" cia Unit 41                                             Unit #1 operated at Decomhpr. 14Rd
: 1. Unit Name: "
: 2. Reporting Period:                                                         essentially full power.
I" cia Unit 41 Unit #1 operated at Decomhpr. 14Rd
: 2. Reporting Period:
essentially full power.
2700
2700
: 3. Licensed Thermal Power (MWI):
: 3. Licensed Thermal Power (MWI):
: 4. Nameplate Rating (Gross MWe):                     893                        ,
893
: 4. Nameplate Rating (Gross MWe):
6
6
: 5. Design Electrical Rating (Net MWe):               g
: 5. Design Electrical Rating (Net MWe):
: 6. Maximum Dependable Capacity (Gross MWe):                       ~
g
: 6. Maximum Dependable Capacity (Gross MWe):
~
822
822
: 7. Maximum Dependable Capacity (Net MWe):
: 7. Maximum Dependable Capacity (Net MWe):
Line 189: Line 264:
: 9. Power Level To Which Restricted.lf Any (Net MWe):
: 9. Power Level To Which Restricted.lf Any (Net MWe):
: 10. Reasons For Restrictions,if Any:
: 10. Reasons For Restrictions,if Any:
This Month           Yr..to.Date         Cinnulative
This Month Yr..to.Date Cinnulative
: 11. Houn in Reporting Period                             744                     8784             70392
: 11. Houn in Reporting Period 744 8784 70392
: 12. Number Of Hours Reactor Was Critical                   712.7                 5555.2           49021.3
: 12. Number Of Hours Reactor Was Critical 712.7 5555.2 49021.3
: 13. Reactor Reserve Shutdown Hours                           0                     .
: 13. Reactor Reserve Shutdown Hours 0
Oi                 205.3
Oi 205.3 690.0 Esl57.3 48733.5
,        14. Hours Generator On.Line                              690.0                   Esl57.3           48733.5 U                         U                   M*3
: 14. Hours Generator On.Line U
: 15. Unit Reserve Shutdown Qours                       1834566 I         16. Gross Thermal Energy Generated (MWH)                                   13469598          "TTT37636
U M*3
: 17. Gross Electrical Energy Generated (MWH)           611080        ,,
: 15. Unit Reserve Shutdown Qours 1834566 13469598 "TTT37636 I
4484780            39858665
: 16. Gross Thermal Energy Generated (MWH) 611080 4484780 39858665
: 18. Net Electrical Energy Generated (MWH)             578937                4223075            37662348
: 17. Gross Electrical Energy Generated (MWH) 578937 4223075 37662348
                                                      ~
: 18. Net Electrical Energy Generated (MWH)
: 19. Unit Service Factor                                     92.7                     58.7                 69.2
: 19. Unit Service Factor
: 20. Unit Availability Factor                                92*7                     98.7                 69.3
~
: 21. Unit Capacity Factor (Using MDC Net) 94.7                     68.6                 6L3
92.7 58.7 69.2 92*7 98.7 69.3
: 22. Unit Capacity Factor (Using DER Net)                   93.8                     58_ 0                 65.7
: 20. Unit Availability Factor 94.7 68.6 6L3
: 23. Unit Forced Outage Rate                                7.3                       6.4                   4.8
: 21. Unit Capacity Factor (Using MDC Net) 93.8 58_ 0 65.7
: 22. Unit Capacity Factor (Using DER Net) 7.3 6.4 4.8
: 23. Unit Forced Outage Rate
: 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Eacht:
: 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Eacht:
l         25. If Shut Down At End Of Report Period. Estimated Date of Startup:                                   _
l
l         26. Units in Test Status (Prior o Commercial Operation):                     Forecast           Achined l       .              ,
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
!                                INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCI AL OPER ATION                                                     __,
l
: 26. Units in Test Status (Prior o Commercial Operation):
Forecast Achined l
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCI AL OPER ATION


i                                                                                                                                                                         :
i UNIT SHUTDOWNS AND POWER REDUCTIONS AME 5t u e Unit #1.
* UNIT SHUTDOWNS AND POWER REDUCTIONS                                 AME 5t u e Unit #1.
DATE 1/16/85 COttl2TED gy N. W. Grant REPORT MONTH Decomher 1484 TEl.EPHONE (305) 662-3675 e.
,                                                                                                                                            DATE 1/16/85
E e
* COttl2TED gy       N. W. Grant REPORT MONTH Decomher 1484                       TEl.EPHONE (305) 662-3675 e.
i 1g 3
i                                                                    -_    E                                 e
y E~
                                          --            1g   3       y E~             Licensee     ,E g         .              Cause a Corrective
Licensee
                                                                                                                                        ^*'*'"
,E g Cause a Corrective g*d N. i.
'.                N. i .       Daie       {           3g   4     2g&               Event       g'1         g*d E
Daie
l H
{
f=   5       jgg             Report a     mO g                 Prevent Recurrence i
3g 4
6 i                 13         84- 12 19     F           54.0   A         1       335-84-12         EB       RELAYX- A reactor trip resulted from a failed closed diesel generator relay. The relay was repaired and the VMT s                    returned to Power operation.
2g&
i i
Event g'1
1 i
^ * ' * ' "
I                        2                                                       3                               4 F: Forced             Reason:                                                   Method:                         Eshibit G . instructions f
E Prevent Recurrence f=
S Stheduled             A Equiprnent Failure (Explain)                           1 Manual                         for Preparation of Data R-Maintenance or Test                                     2-Manual Scram.                 Entry Sheets for Licensee C Refueling .                                             3 Automatic Scram.               Event Report (LER) File INUREG.
5 jgg Report a mO H
2 D-Regulatory Restriction                               @-Other (Explain)                 01611                     ,
g l
I:-Operator Training & Ucense Examination                                         .
6 i
F-Adminntrative 9,          ,,
i 13 84-12 19 F
5 4
54.0 A
G-Operational Fer..t iFiptaml                           4     /,e4. Asewc .,#          Exhibit I Same Source
1 335-84-12 EB RELAYX-A reactor trip resulted from a failed closed diesel generator relay. The relay was repaired and the VMT returned to Power operation.
(**/77 )                   Il-Other ( Explaini
s i
i 1
i I
2 3
4 F: Forced Reason:
Method:
Eshibit G. instructions f
S Stheduled A Equiprnent Failure (Explain) 1 Manual for Preparation of Data R-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling.
3 Automatic Scram.
Event Report (LER) File INUREG.
2 D-Regulatory Restriction
@-Other (Explain) 01611 I:-Operator Training & Ucense Examination 9,
5 F-Adminntrative G-Operational Fer..t iFiptaml 4
/,e4. Asewc Exhibit I Same Source 4
(**/77 )
Il-Other ( Explaini


i
i


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE l
OF OPERATING EXPERIENCE
                                          ~
~
DOCKET NO.         50-335 UNIT       St. Lucie Unit #1 DATE       January 15. 1985' COMPLETED BY           N. W. Grant TELEPHONE           (305) 552-3675 REPORT MONTH           December. 1984
DOCKET NO.
  )                                                   -
50-335 UNIT St. Lucie Unit #1 DATE January 15. 1985' COMPLETED BY N. W. Grant TELEPHONE (305) 552-3675 REPORT MONTH December. 1984
)
Unit #1 operated at essentially full poweF.
Unit #1 operated at essentially full poweF.
Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.
Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.
Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.
Florida Power & Light Company commitments for NUREG-0737 implementation are continuing.
Refer to correspondence between FPL and NRC for additional information.
In accordance with requirements of NUREG-0737 Item II.K.3.3, there were no challenges to PORV or safety valves during the report month.
In accordance with requirements of NUREG-0737 Item II.K.3.3, there were no challenges to PORV or safety valves during the report month.
i n
i n


AYLl' AGE is All ) UNil POwl t Li VI.L DOCKET NO.       50-389 UNilst - I neia linit J2, DATE    1 /15/85 COMPLETED BY        N. W. Grant
AYLl' AGE is All ) UNil POwl t Li VI.L DOCKET NO.
                                                                                                                  ~
50-389 UNilst - I neia linit J2 1 /15/85 DATE N. W. Grant COMPLETED BY
TELEMIONE MONTH       December, 1984             -
~
DAY       AVER ACE DAILY POWEP. LEVEL                       DAY       AVER ACE DAILY POWER LEVEL o                            IMWe Net)                                               .(MWe Net)
TELEMIONE MONTH December, 1984 DAY AVER ACE DAILY POWEP. LEVEL DAY AVER ACE DAILY POWER LEVEL IMWe Net)
:                    807                                 ij                 819 2                     Ala                                 is                 740 3                     A1n                                 39                     36 4                     809                                                     ---
.(MWe Net) o 807 ij 819 2
20 5                     101                                                     ___
Ala is 740 3
3
A1n 39 36 4
                              ---                                                      ~~~
809 20 5
6                                                         22 7                     144                                                     ---
101 3
23 a
~~~
703                                                      ---
6 22 7
        ,                    820                                                     ---
144 23 703 a
25 10                     All 26                 ---
820 25 10 All 26 13 820 21 3,
13                     820                                 3,                     21 12                     820                                                     468           .
12 820 468 28 13 821 754 29 14 820 815 30 15 819-3 817 16 819 INSTRUCTIONS On this foimat. lat the aserage daily unit power lesel in MWe Nei for each day in the reporting in.inth. Compute o the nearest whiile twgawaii.
28 13                     821                                                     754 29 14                     820                                                     815 30 15                     819-                                                     817 3      ,_
(9/771 I
16                     819 INSTRUCTIONS On this foimat. lat the aserage daily unit power lesel in MWe Nei for each day in the reporting in.inth. Compute o the nearest whiile twgawaii.
                          .                                                                                          (9/771
                                    .                                                                                      I


OPERATING DATA REPORT DOCKET NO.         50-3B9 DATE _T/ lb/6b COMPLETED             BY (N. W. G TELEPHONL 305)S52-3675 OPERATING STATUS St. Lucie Unit #2                                   Notes
OPERATING DATA REPORT 50-3B9 DOCKET NO.
: 1. Unit Name:                                                                 Unit #2 operated at
DATE _T/ lb/6b COMPLETED BY (N. W. G TELEPHONL 305)S52-3675 OPERATING STATUS St. Lucie Unit #2 Notes
: 2. Reporting reriod. December.1984                                     power except as indicated in 2560             the' Unit Shutdowns and         Power
: 1. Unit Name:
Unit #2 operated at
: 2. Reporting reriod. December.1984 power except as indicated in 2560 the' Unit Shutdowns and Power
: 3. Licensed Thennel Power (MW ):
: 3. Licensed Thennel Power (MW ):
850             Reducti,ons    f R6 port.
850 f
  )   4. Namepiste Rating (Gross MWe):
)
: 4. Namepiste Rating (Gross MWe):
Reducti,ons R6 port.
0#
0#
: 5. Design Electrical Reting (Net MWe):
: 5. Design Electrical Reting (Net MWe):
832
832
: 6. Maximum Dependable Cepecity (Gross MWe):
: 6. Maximum Dependable Cepecity (Gross MWe):
: 7. Maximum Dependable Capacity (Net MWe):             786
786
: 7. Maximum Dependable Capacity (Net MWe):
: 8. If Changes Occur in Capacity Ratings (leems Number 3 Through 7) Since tast Report,Give Reasone
: 8. If Changes Occur in Capacity Ratings (leems Number 3 Through 7) Since tast Report,Give Reasone
: 9. Power level To Which Restricted. If Any (Net MWe):
: 9. Power level To Which Restricted. If Any (Net MWe):
: 10. Reasons For Restrictions.lf Any:
: 10. Reasons For Restrictions.lf Any:
This Month           Yr to Date           Omnulatise 744                   8784                 12289
This Month Yr to Date Omnulatise 744 8784 12289
: 11. Hours in Reporting Period
: 11. Hours in Reporting Period 518.5 7379.2 10606.2
: 12. Number Of Hours Reactor was Critical                   518.5                  7379.2                10606.2 U
: 12. Number Of Hours Reactor was Critical U
* U   -                &
U
: 13. Reactor Reserve Shutdown Hours                                                         --
: 13. Reactor Reserve Shutdown Hours
: 14. Hours Generator On Line                                 497.8                 7070.2               10200.6 0                        0                    0
: 14. Hours Generator On Line 497.8 7070.2 10200.6
!    15. Unit Reserve Shutdown 1(ours
: 15. Unit Reserve Shutdown 1(ours 0
: 16. Gross Thermal Energy Generated (MWH)               110a990             177mmn91               '9ganngAn
0 0
: 17. Gross Electrical Energy Genersted (MWH)             400580      _,
: 16. Gross Thermal Energy Generated (MWH) 110a990 177mmn91
5906480                8449700
'9ganngAn 400580 5906480 8449700
: 18. Net Electrical Energy Generated (MWH).             374033                5564826                7962412 l     19. Unit Service Factor                                     66.9                   80.5                   83.0
: 17. Gross Electrical Energy Genersted (MWH) 374033 5564826 7962412
: 20. Unit Availability Factor                                 66.9                    80.5                  83.0
: 18. Net Electrical Energy Generated (MWH).
66.9 80.5 83.0 l
: 19. Unit Service Factor 66.9 80.5 83.0
: 20. Unit Availability Factor
_ 82.4 64.0 80.6
: 21. Unit Cepecity Factor (Using MDC Net)
: 21. Unit Cepecity Factor (Using MDC Net)
                                                    -              64.0                  80.6                _ 82.4
: 22. Unit Cepecity Factor (Using DER Net) 62.5 78.8 80.6-29.3 8.0 8.9
: 22. Unit Cepecity Factor (Using DER Net)                     62.5                   78.8                   80.6-
: 23. Unit Forced Outage Rate i
: 23. Unit Forced Outage Rate                                  29.3                     8.0                   8.9 i     24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Each):
: 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Each):
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 26. Uniss in Test Status (Prior io Commercial Operation):                     Forecast               Arliiaed INITIAL CRITICALITY                                                           __
: 26. Uniss in Test Status (Prior io Commercial Operation):
l                            INITI AL ELECTRICITY COMMERCI AL OPER ATION                                                         _
Forecast Arliiaed INITIAL CRITICALITY l
l l
INITI AL ELECTRICITY COMMERCI AL OPER ATION l
rgcn
l rgcn


50-389 DOCKETNO.         St. Lucie Unit #2 UNIT SHUTDOWNS AND POWER REDUCTIONS                          UNIT NAME DATE 1/1 R/R9 REPORT MONT1g Decerrber 1984                                      (*$u i       b/3 e.
50-389 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO. St. Lucie Unit #2 UNIT NAME DATE 1/1 R/R9
                                                                                          .      E                               e
(*$u i REPORT MONT1g Decerrber 1984 b/3 e.
                                                                  .        E       }
E e
* E5         Licensee   $*,        g*.                   Cause & Corrective N. . .                               Date     E       iE         d     .3 s 5           Event     3,7                                             '"
Cause & Corrective E
                                                                #          5I      y                      Report a   mO           EO                   Prevent Recurrence c-                 2U ;lij ey                            vo 6
}
16                                 84 12 05   S     40 1         A           l                     CP       PUMPXI=   The unit was shutdcwn for the schedulot repair of a reactor coolant ptmp oil leak. Ibliowing repairs full power operation was delayed in order to acrnpl '
* E5 Licensee g*.
with MIC recuirements.
N...
                                                                                                                                                        ~
Date E
17                                 84 12 18   F     7.2         A           3       389-84-15     EB       RELAYX. The trip of a steam generator feed punp resulted in a reactor . trip on 1ow steam generator level.
iE d
18                               84 12 19   F     198.9         A           1       389-84-16     EB                 A r actor trip resulted from a turbine RELAYr trip caused by low condenser vacuun.
.3 s 5 Event 3,7 2 ;lij e Report a mO EO Prevent Recurrence 5I y
U o
c-y v
6 16 84 12 05 S
40 1 A
l CP PUMPXI=
The unit was shutdcwn for the schedulot repair of a reactor coolant ptmp oil leak. Ibliowing repairs full power operation was delayed in order to acrnpl' with MIC recuirements.
~
17 84 12 18 F
7.2 A
3 389-84-15 EB RELAYX.
The trip of a steam generator feed punp resulted in a reactor. trip on 1ow steam generator level.
18 84 12 19 F
198.9 A
1 389-84-16 EB A r actor trip resulted from a turbine RELAYr trip caused by low condenser vacuun.
Outage extended to repair RCP seals and safety injection valves.
Outage extended to repair RCP seals and safety injection valves.
19                               84 12 27   S     0.0         B           5                     ZZ       ZZZZZZ   Full power operation delayed for secondary chemistry and MFC ocxnpliance.
19 84 12 27 S
0.0 B
5 ZZ ZZZZZZ Full power operation delayed for secondary chemistry and MFC ocxnpliance.
s_
s_
i                                             2                                                     3                                 4 f Forced                                     Reason:                                                 Method:                             Exhibit G -Instructions S Scheduled                                 A Equipment Failure (Explain)                           1. Manual                           for Preparation of Data B. Maintenance or Test                                 2 Manual Scram.                     Entry Sheets for Licensee -
i 2
C Refueling                                             3 Automatk Scram.                   Event Report ILER) File INtlREG-D-Regulatory Restriction                               @-Other (Explain)                     0161)                     .
3 4
l.-Operator Training & Ucenw Examination 9,          ,
f Forced Reason:
F Administrative                                                                       5 G. Operational I tror if splami                       c . /. 4.     Aseve.w.ci             Ethibit I - Same Source l'8/77)                                         Il Other IE xplain)
Method:
Exhibit G -Instructions S Scheduled A Equipment Failure (Explain)
: 1. Manual for Preparation of Data B. Maintenance or Test 2 Manual Scram.
Entry Sheets for Licensee -
C Refueling 3 Automatk Scram.
Event Report ILER) File INtlREG-D-Regulatory Restriction
@-Other (Explain) 0161) l.-Operator Training & Ucenw Examination 9,
5 F Administrative G. Operational I tror if splami c. /.
4.
Aseve.w.ci Ethibit I - Same Source l'8/77)
Il Other IE xplain)


          .*: A ' .                                                                  *
A '


==SUMMARY==
==SUMMARY==
OF- OPERATING ?.<PERIENCE
OF-OPERATING ?.<PERIENCE
                                        '                  ~
~
DOCKET NO.             50-389 UNIT           St. Lucie Unit #2 DATE           January 15, 1985 COMPLETED BY               N. W. Grant TELEPHONE         _ t .tng ) gg?_tA7s REPORT MONTH         Decomher. 1984 See the' Unit Shutdowns and Power Reductions
DOCKET NO.
50-389 UNIT St. Lucie Unit #2 DATE January 15, 1985 COMPLETED BY N. W. Grant TELEPHONE
_ t.tng )
gg?_tA7s REPORT MONTH Decomher. 1984 See the' Unit Shutdowns and Power Reductions
* Report.
* Report.
Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.               -
Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.
Florida Power & Light Company comitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.
Florida Power & Light Company comitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.
In accordance with requirements of Technical specification 6.9.1.6 there were no challenges to PORV or Safety Valves during the report month.
In accordance with requirements of Technical specification 6.9.1.6 there were no challenges to PORV or Safety Valves during the report month.
Line 332: Line 465:


v.
v.
  >o,    .
>o FLORIDA POWER & LIGHT COMPANY January 15, 1985 L-85-24 Director, Office of Resource Managemer.t U. S. Nuclear Regulatory Connission Washington, D. C.
FLORIDA POWER & LIGHT COMPANY January 15, 1985 L-85-24 Director, Office of Resource Managemer.t U. S. Nuclear Regulatory Connission Washington, D. C. 20555
20555


==Dear Sir:==
==Dear Sir:==
Attached are the December 1984 Operating Status Reports and Operating Summary Reports for Turkey Point Units No. 3 and 4 and St. Lucie Units No. 1 and 2.
Attached are the December 1984 Operating Status Reports and Operating Summary Reports for Turkey Point Units No. 3 and 4 and St. Lucie Units No. 1 and 2.
Very truly yours, fY'
Very truly yours, fY'
      /otJ.W.Will           , Jr.
/otJ.W.Will
Group Vic President Nuclear Energy JWW/NWG/cc Attachment c.;: J. P. O'Reilly, Region II Harold F. Reis, Esquire PNS-LI-85-23 4
, Jr.
Group Vic President Nuclear Energy JWW/NWG/cc Attachment c.;:
J. P. O'Reilly, Region II Harold F. Reis, Esquire PNS-LI-85-23 4
V
V
                                                                                          '\'
'\\'
PEOPLE ... SERVING PEOPLE}}
PEOPLE... SERVING PEOPLE}}

Latest revision as of 02:43, 13 December 2024

Monthly Operating Repts for Dec 1984
ML20107A534
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 12/31/1984
From: Grant N, Williams J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
L-85-24, NUDOCS 8502200020
Download: ML20107A534 (17)


Text

l AVLl; AGE !)All) UNil POwl t LI VI.t

~

DOCKET NO.

50-250 UNil. Turkey Point Unit #3 DATE 1/15/85 COMPLETED BY N.W. Grant TELEPilONE (305)552-3675 MONTH December, 1984 DAY AVER ACE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL o

IMWe Net)

.(MWe Neil I

6R1 gf 2

682 gg 673 3

675 4

20 674 5

i 6

672 22 7

681 23 g

697 24 9

697 25 10 696 26 696 3

2' 32 694 25 13 29 14 30

~~~

~~~

15 33 I

INSTRUCTIONS On this format.lar the aveuge daily unit power lesel in MWe Nei for cach day in the reportin; m.inth. Compute to the nearest whiite expwast.

8502200020 841231 gDR ADOCK 05000250 f

PDR hi

\\

~

OPERATING DATA RLPORT DOCKET NO- --

DATE.1 /15/85 COMPLETED BY N. W. ' Grant TELEPHONL (305)SS2-3675 OPERATING STATUS Notes

1. Unit Name:

Turkey Point Unit #3 See the, Unit Shutdowns and December,1984

2. Reporting Period:

2200 Power Reductions" Report

3. Licensed Thermal Power (MWI):

0 o'

4. Namepiste Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):

700

6. Maximum Dependable Capacity (Gross MWe):

666

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (llems Number 3 Through 7) Since Last Report, Give Reasone
9. Power I.svel To Which Restricted.lf Any (Net MWe):
10. Reasons For Restrictions.lf Any:

This Month Yr.-to Date Cumulative

11. Hours in Repo:1ing Period 744 8784 10RR44.6
12. Number Of Hours Reactor Was Critical 288.3 7366.6 73672.8 0

0 844.4

13. Reactor Reserve Shutdown Hours 288.3 7357.1 73179.1
14. Hours Generator On Line 0

0 121.8

15. Unit Reserve Shutdown 1(ours
16. Gross Thermal Energy Generated (MWH) 619365 1R640914

-141194;11

17. Gross Electrical Energy Generated (MWH) 207160 5046130 48255695 a
18. Net Electrial Energy Generated (MWH) 193577 4784209 45697206
19. Unit Service Factor 30;8 82.6 69.1
20. Unit Availability Factor 38.8 82.6 69.3 39.1 81.8 33 L
21. Unit Capacity Factor (Using MDC Net) 37.5 78.6 62.3
22. Unit Capacity Factor (Using DER Net) i 61.3 14.7 6.4 i
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Eacht:

Refueling March 30, 1985, 11 weeks 1

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

j

26. Units in Test Status (Prior eo Commercial Operation):

Forecast Arisiaed l

INITI AL CRITICALITY l

INITIAL ELECTRICITY COMMERCI AL OPER ATION

1 i

DOCKET NO. 50-250 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME 'rnrkm m,, r+ rh,it #3 DATE l /.l 6186 ND BY PL W Grant REPORT MONTHDecmber, 1984 17.t.EPHONE (305) 552-3675 5

E

]g 3

  • E3 Licensee Eg Cause & Corrective

^ ' ' * ' "

i.

N..

Date i

3g it js&

Event 3,7 Ed y=

5 ggg Report a mU Prevent Recurrence b-g l

6 I

19 84 12 13 F

455.7 A

3 250-84-33 Im GENEPA A short to ground in the Unit'#3 generator exciter caused a turbine trip which resulted in a reactor trip.

'Ihe exciter was replaced.

l I

2 3

4 F: Forced Reason:

Method:

Exhibit G - Instructions S Scheduled A-Equipment Failure (Esplain) 1 -Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LERI File (NUREG-D-Regulatory Restriction

@-Other iExplain) 0161)

I;-Operator Traming A bcense Esamination k ~ O * ** ** """

5 F Adnunistrative G.Operatomal I ire.r i F splam l s-. f.4.

m,.,#

Ethibit I - Same Source l's/77 )

Il-Other ( E xplain)

SUMMARY

OF OPERATING 2XPERIENCE DOCKET NO..

50-250-UNIT Turkey Point Unit #3.

DATE January 15, 1985 COMPLETED BY N. W. Grant s

TELEPHONE (305) 552-3675 REPORT 110 NTH December, 1984-See the' Unit Shutdowns 'and Power Reductions" Report.

Inspection and requirements of IE Bulletins and NUREG 0737 are continuing.

Florida Power & Light. Company commitments for NUREG-0373 implementation are continuing.

Refer to correspondence between FPL and NRC for additional information.

s 1

1 t

A

i AVLl; AGE DAll i tWil POwi k LI VI.t j

DOCKET NO.

50-251 UNir Turkey Point Unit #4 DATE 1/15/85-COMPLETED BY H. W. Grant TELEPilONE (305)552-3675 MONTH December. 1984 DAY AVER ACE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL i

IMWe. Net)

-(MWe Neu 3

gj 688 2

is 687 3

39 6b9__

385 688 4

20 5

676 al 686 6

677 22 685 7

684 685 23 693 686 g

74 9

692 684 25 10 693 683 26 693 684 12 693 685 28 13 687 686 29 14 6nn 30 685 15 688 684 3,

16 M7 INSTRUCTIONS On this forenas. list the average daily unit pinwer leselin MWe Nes for each day in the rep.istin;in.inth. Compute to the nearest whiite twgawars.

19/77) 9

OPERATING DATA REPORT 50-251 DOCKET NO. P15/85 DATE COMPLETED BYN. W. Grant TELEPHONL (3tnsiS52-3675 OPERATING STATUS Turkey Point Unit #4 Notes

,, g g

2. Reporting Period:

December. 19Rd See the unit shutdowns and

3. Licensed Thermal Power (MWI):

?200 power reductions report.

4. Nameplate Rating (Gross MWe):

6

5. Design Electrical Rating (Net MWe):

70n

6. Maximum Dependable Capacity (Gross MWe):

666

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report,Give Reasone
9. Power 1.nel To Which Restricted. lf Any (Net MWe):
10. Reasons For Restrictions.lf Any:

This Month Yr..to.Date Cumulative 744 8784 99581

11. Hours in Reporting Period 669.1 5079.8 69718.4
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours 0

.0 166.6

14. Hours Generator On.Line 663.4 4772.1 67240.2 0

0 31.2

15. Unit Reserve Shutdown gours

.1449439.

10383365 142130106

16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH) 476055 1771ngs; aslopto7 452898 3079222 427R1?R1
18. Net Electrical Energy Generated (MWH)'

89.2 54.3 67.5

19. Unit Service Factor 1
20. Unit Availability Factor 89.2 54.3 67.6 91.4 52.6 6M
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net) 87~.8 50.6 62.0 10.8 24.1 6.1
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Eacht:

l anuan 2 M (adual)

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior io Commercial Operation):

Forecast Atinioed INITIAL CRITICALITY INITI AL ELECTRICITY COMMERCI AL OPER ATION

DOCKETNO. 50-251 UNIT SHUTDOWNS AND POWER REDUCTIONS UNITNAMETurkev Point tinit (4 -

DATE 1/15/85 CORWLETED BY N.

W-Cran +-

REPORT MONT1g Decmber. 1984

,yq3 qq,,_,q

-_E E*

.] 3 3

j E~

Licensee Eg Cause & Corrective g*b

^ ' ' " ' "

N..

Date i

3g

(

2g&

Event g'2 E

Prevent Recurrence fE j;ji g Report 8 mO H

g d

i 25 84 11 24 F

80.6 A

4 251-84-25 CB CKIBKR Reactor trip on low flow resultirg frcm failed RCP breaker. Breaker repaired.

4 I

2 3

4 1

F Forced Reas m:

Method:

Exhibit G Instructions 5 Stheduled A Equiprnent Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C Refueling 3 Automatoc Scram.

Event Repor:ILER) File (NUREG-D-Regulatory Rest:iction 9-Other (Explain 1 01611 l.-Operator Traming A Ucense Enamination M ~ O *"" ""

5 F-Administrative G-Operati. mal I e r..r I F =plem t x-

/.. a a s e w.,#

Exhibit I - Same Source tas/77)

Il-Other i E xplain t

GUMMARY OF OPERATING EXPERIEECE DOCKET NO.

50-251 UNIT Turkey Point Unit #4 DATE J_anuary 19. 1985 COMPLETED BY N. W. Grant TELEPHONE (305) 552-3675 REPORT MONTH pecomher. 1984 o

Unit.#4 operated at essentially full poweF except as noted on Unit Shutdown Report.

Inspection and requirements of IE Bulletin and NUREG -0737 are continuing.

Florida Power & Light Company commitments to NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.

a l

. - A.--.-

AVLl; AGE D All i UNil PD*1 }; Ll VI.I DOCKET NO. 50-333 g.,)St. Lucie Unit #1 DATE 1/15/85 N. W. Grant 0051PLETED BY TELEPilONE(305)552-3675 MONm December, 1984 DAY AVER ACE DAILY POWER LEVEL DAY AVER ACE DAILY POWER LEVEL IMWe Net)

-(MWe Net i 852 I

j 853 2

851 is 855 3

""O 19 w7 4

4 850 20 5

851 21 155 6

850 22 780 7

854 23 796 8

857 24 843 9

855 844 25 10 856 838 26 ll 853 27 834 la 854 844 2s 854 845 13 29 14 853 30 846 15 853 816 33 16 RS3 INSTRUCTIONS

'esage daily unis p.mer leselin MWe.Nei for each day :: the reporting month. Compute su he earest hiil asva i,mi S

a

.-g.,-.,

c.,

r-

OPERATING DATA REPORT DOCKET NO.50-335 DATElDb/66 COMPLETED BY( A. W TELEPHONL 305) 552-3675 OPERATING STATUS Notes

1. Unit Name: "

I" cia Unit 41 Unit #1 operated at Decomhpr. 14Rd

2. Reporting Period:

essentially full power.

2700

3. Licensed Thermal Power (MWI):

893

4. Nameplate Rating (Gross MWe):

6

5. Design Electrical Rating (Net MWe):

g

6. Maximum Dependable Capacity (Gross MWe):

~

822

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report,Give Reasone
9. Power Level To Which Restricted.lf Any (Net MWe):
10. Reasons For Restrictions,if Any:

This Month Yr..to.Date Cinnulative

11. Houn in Reporting Period 744 8784 70392
12. Number Of Hours Reactor Was Critical 712.7 5555.2 49021.3
13. Reactor Reserve Shutdown Hours 0

Oi 205.3 690.0 Esl57.3 48733.5

14. Hours Generator On.Line U

U M*3

15. Unit Reserve Shutdown Qours 1834566 13469598 "TTT37636 I
16. Gross Thermal Energy Generated (MWH) 611080 4484780 39858665
17. Gross Electrical Energy Generated (MWH) 578937 4223075 37662348
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor

~

92.7 58.7 69.2 92*7 98.7 69.3

20. Unit Availability Factor 94.7 68.6 6L3
21. Unit Capacity Factor (Using MDC Net) 93.8 58_ 0 65.7
22. Unit Capacity Factor (Using DER Net) 7.3 6.4 4.8
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Eacht:

l

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

l

26. Units in Test Status (Prior o Commercial Operation):

Forecast Achined l

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCI AL OPER ATION

i UNIT SHUTDOWNS AND POWER REDUCTIONS AME 5t u e Unit #1.

DATE 1/16/85 COttl2TED gy N. W. Grant REPORT MONTH Decomher 1484 TEl.EPHONE (305) 662-3675 e.

E e

i 1g 3

y E~

Licensee

,E g Cause a Corrective g*d N. i.

Daie

{

3g 4

2g&

Event g'1

^ * ' * ' "

E Prevent Recurrence f=

5 jgg Report a mO H

g l

6 i

i 13 84-12 19 F

54.0 A

1 335-84-12 EB RELAYX-A reactor trip resulted from a failed closed diesel generator relay. The relay was repaired and the VMT returned to Power operation.

s i

i 1

i I

2 3

4 F: Forced Reason:

Method:

Eshibit G. instructions f

S Stheduled A Equiprnent Failure (Explain) 1 Manual for Preparation of Data R-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C Refueling.

3 Automatic Scram.

Event Report (LER) File INUREG.

2 D-Regulatory Restriction

@-Other (Explain) 01611 I:-Operator Training & Ucense Examination 9,

5 F-Adminntrative G-Operational Fer..t iFiptaml 4

/,e4. Asewc Exhibit I Same Source 4

(**/77 )

Il-Other ( Explaini

i

SUMMARY

OF OPERATING EXPERIENCE

~

DOCKET NO.

50-335 UNIT St. Lucie Unit #1 DATE January 15. 1985' COMPLETED BY N. W. Grant TELEPHONE (305) 552-3675 REPORT MONTH December. 1984

)

Unit #1 operated at essentially full poweF.

Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.

Florida Power & Light Company commitments for NUREG-0737 implementation are continuing.

Refer to correspondence between FPL and NRC for additional information.

In accordance with requirements of NUREG-0737 Item II.K.3.3, there were no challenges to PORV or safety valves during the report month.

i n

AYLl' AGE is All ) UNil POwl t Li VI.L DOCKET NO.

50-389 UNilst - I neia linit J2 1 /15/85 DATE N. W. Grant COMPLETED BY

~

TELEMIONE MONTH December, 1984 DAY AVER ACE DAILY POWEP. LEVEL DAY AVER ACE DAILY POWER LEVEL IMWe Net)

.(MWe Net) o 807 ij 819 2

Ala is 740 3

A1n 39 36 4

809 20 5

101 3

~~~

6 22 7

144 23 703 a

820 25 10 All 26 13 820 21 3,

12 820 468 28 13 821 754 29 14 820 815 30 15 819-3 817 16 819 INSTRUCTIONS On this foimat. lat the aserage daily unit power lesel in MWe Nei for each day in the reporting in.inth. Compute o the nearest whiile twgawaii.

(9/771 I

OPERATING DATA REPORT 50-3B9 DOCKET NO.

DATE _T/ lb/6b COMPLETED BY (N. W. G TELEPHONL 305)S52-3675 OPERATING STATUS St. Lucie Unit #2 Notes

1. Unit Name:

Unit #2 operated at

2. Reporting reriod. December.1984 power except as indicated in 2560 the' Unit Shutdowns and Power
3. Licensed Thennel Power (MW ):

850 f

)

4. Namepiste Rating (Gross MWe):

Reducti,ons R6 port.

0#

5. Design Electrical Reting (Net MWe):

832

6. Maximum Dependable Cepecity (Gross MWe):

786

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (leems Number 3 Through 7) Since tast Report,Give Reasone
9. Power level To Which Restricted. If Any (Net MWe):
10. Reasons For Restrictions.lf Any:

This Month Yr to Date Omnulatise 744 8784 12289

11. Hours in Reporting Period 518.5 7379.2 10606.2
12. Number Of Hours Reactor was Critical U

U

13. Reactor Reserve Shutdown Hours
14. Hours Generator On Line 497.8 7070.2 10200.6
15. Unit Reserve Shutdown 1(ours 0

0 0

16. Gross Thermal Energy Generated (MWH) 110a990 177mmn91

'9ganngAn 400580 5906480 8449700

17. Gross Electrical Energy Genersted (MWH) 374033 5564826 7962412
18. Net Electrical Energy Generated (MWH).

66.9 80.5 83.0 l

19. Unit Service Factor 66.9 80.5 83.0
20. Unit Availability Factor

_ 82.4 64.0 80.6

21. Unit Cepecity Factor (Using MDC Net)
22. Unit Cepecity Factor (Using DER Net) 62.5 78.8 80.6-29.3 8.0 8.9
23. Unit Forced Outage Rate i
24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Each):
25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Uniss in Test Status (Prior io Commercial Operation):

Forecast Arliiaed INITIAL CRITICALITY l

INITI AL ELECTRICITY COMMERCI AL OPER ATION l

l rgcn

50-389 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO. St. Lucie Unit #2 UNIT NAME DATE 1/1 R/R9

(*$u i REPORT MONT1g Decerrber 1984 b/3 e.

E e

Cause & Corrective E

}

  • E5 Licensee g*.

N...

Date E

iE d

.3 s 5 Event 3,7 2 ;lij e Report a mO EO Prevent Recurrence 5I y

U o

c-y v

6 16 84 12 05 S

40 1 A

l CP PUMPXI=

The unit was shutdcwn for the schedulot repair of a reactor coolant ptmp oil leak. Ibliowing repairs full power operation was delayed in order to acrnpl' with MIC recuirements.

~

17 84 12 18 F

7.2 A

3 389-84-15 EB RELAYX.

The trip of a steam generator feed punp resulted in a reactor. trip on 1ow steam generator level.

18 84 12 19 F

198.9 A

1 389-84-16 EB A r actor trip resulted from a turbine RELAYr trip caused by low condenser vacuun.

Outage extended to repair RCP seals and safety injection valves.

19 84 12 27 S

0.0 B

5 ZZ ZZZZZZ Full power operation delayed for secondary chemistry and MFC ocxnpliance.

s_

i 2

3 4

f Forced Reason:

Method:

Exhibit G -Instructions S Scheduled A Equipment Failure (Explain)

1. Manual for Preparation of Data B. Maintenance or Test 2 Manual Scram.

Entry Sheets for Licensee -

C Refueling 3 Automatk Scram.

Event Report ILER) File INtlREG-D-Regulatory Restriction

@-Other (Explain) 0161) l.-Operator Training & Ucenw Examination 9,

5 F Administrative G. Operational I tror if splami c. /.

4.

Aseve.w.ci Ethibit I - Same Source l'8/77)

Il Other IE xplain)

A '

SUMMARY

OF-OPERATING ?.<PERIENCE

~

DOCKET NO.

50-389 UNIT St. Lucie Unit #2 DATE January 15, 1985 COMPLETED BY N. W. Grant TELEPHONE

_ t.tng )

gg?_tA7s REPORT MONTH Decomher. 1984 See the' Unit Shutdowns and Power Reductions

  • Report.

Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.

Florida Power & Light Company comitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.

In accordance with requirements of Technical specification 6.9.1.6 there were no challenges to PORV or Safety Valves during the report month.

4 I

l 4

v.

>o FLORIDA POWER & LIGHT COMPANY January 15, 1985 L-85-24 Director, Office of Resource Managemer.t U. S. Nuclear Regulatory Connission Washington, D. C.

20555

Dear Sir:

Attached are the December 1984 Operating Status Reports and Operating Summary Reports for Turkey Point Units No. 3 and 4 and St. Lucie Units No. 1 and 2.

Very truly yours, fY'

/otJ.W.Will

, Jr.

Group Vic President Nuclear Energy JWW/NWG/cc Attachment c.;:

J. P. O'Reilly, Region II Harold F. Reis, Esquire PNS-LI-85-23 4

V

'\\'

PEOPLE... SERVING PEOPLE