ML20112H818: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:- | {{#Wiki_filter:- | ||
~ | ~ | ||
4' | I DOCXIT NO.' ' 50-148 s | ||
I UNIT DATE l-7--85 L D. Woodard COMPLETED BY TF' ** HONE (205) 899-5156 | |||
+ | |||
St0NTig December. 1984 | |||
/ | |||
.I | DAY AVERACE DAILY F0WER LEVEL DAY AVERACE DAILY POWER LEVEL (MWe-Net) | ||
;j | (AlWe-Net) 818 g | ||
g7 gig 816 820 2 | |||
gg 816~~~~- | |||
3 | |||
--------..---_g9_. | |||
(DRADOCK 05000348 | 817 816 | ||
~ | |||
4' 823 | |||
;g 821 3 | |||
21 816 815 6 | |||
821 22 823 7 | |||
23 823 819 g | |||
823 | |||
;4 819 9 | |||
,j. | |||
818' 685 10 817 3 | |||
ll 777 1g 27 820 | |||
.I;j 12 604 3 | |||
gi g ll1 816 13 29 605 815 | |||
't 14 30 15 678 31 817 16 CISTRUCTIONS On this 63rm:r. list the :ver:se d:ily unit power levelin MWe Net for e:ch d y in the reporting munth. Campute to | |||
, the ne:re:t whole me;: watt. | |||
8501180055 841231 e | |||
(DRADOCK 05000348 | |||
\\ | |||
PDR | |||
:l | :l | ||
?:{ | |||
:{ | lil-m | ||
lil- | |||
OPERATING DATA REPORT DOCKET NO. | OPERATING DATA REPORT DOCKET NO. | ||
Sn un DATE l- / ~D COMPLETED BY J. D. Woodard TELEPHONE (2051 899-5156 OPERATING STATUS Notes | |||
: 1. Unit Name: | : 1. Unit Name: | ||
December, 1984 | Joseph M. | ||
Farley - Unit 1 | |||
: 3. Licensed Thermal Power (MWt): | : 2. Reporting Period: | ||
December, 1984 | |||
: 1) Cumulative data since 12-1-77, date of commercial | |||
: 3. Licensed Thermal Power (MWt): | |||
2652 Peration. | |||
860 | |||
: 4. Nameplate Rating (Gross MWs): | : 4. Nameplate Rating (Gross MWs): | ||
829 | 829 | ||
: 5. Design Electrical Rating (Net MWe): | : 5. Design Electrical Rating (Net MWe): | ||
: 6. Maximum Dependable Capacity (Gross MWe): | RAI R | ||
: 7. Maximum Dependable Capacity (Net MWe): | : 6. Maximum Dependable Capacity (Gross MWe): | ||
797 1 | |||
: 7. Maximum Dependable Capacity (Net MWe): | |||
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons: | : 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons: | ||
N/A | N/A N/A | ||
: 9. Power Level To Which Restricted,1f Any (Net MWe): | : 9. Power Level To Which Restricted,1f Any (Net MWe): | ||
: 10. Reasons For Restrictions. If Any: | : 10. Reasons For Restrictions. If Any: | ||
O | M/A d | ||
O This Month Yr.-to Date Cur'nulative | |||
: 11. Hours In Reporting Period 744 8,784 62,112 744.0 7,005.8 42,129.0 | |||
: 13. Reactor Reserve Shutdown Hours l | : 12. Number Of Hours Reactor Was Critical 0.0 0.0 3,650.0 | ||
: 15. Unit Reserve Shutdown Hours | : 13. Reactor Reserve Shutdown Hours l | ||
: 16. Gross Thermal Energy Generated (MWH) 1,898,787 | : 14. Hours Gecerator On.Line 744,0 6.921.0 41.024.4 | ||
: 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 l | |||
: 16. Gross Thermal Energy Generated (MWH) 1,898,787 17,799,049 103,900,575 5,751,304 33,094,314 | |||
: 17. Gross Electrical Energy Generated (MWH) | : 17. Gross Electrical Energy Generated (MWH) | ||
: 18. Net Electrical Energy Generated (MWH) | Ata 9An | ||
: 19. Unit Service Factor | : 18. Net Electrical Energy Generated (MWH) 585 848 5 427 984 | ||
: 20. Unit Availability Factor | '41 179 046 | ||
: 21. Unit Capacity Factor (Using MDC Net) | : 19. Unit Service Factor 100.0 78.8 66.0 100.0 78.8 66.0 | ||
: 22. Unit Capacity Factor (Using DER Net) | : 20. Unit Availability Factor 77.5 62.9 | ||
: 23. Unit Forced Outage Rate | : 21. Unit Capacity Factor (Using MDC Net) on a | ||
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. .and Duration of Each): | : 22. Unit Capacity Factor (Using DER Net) 9s n 76 s An:s | ||
: 23. Unit Forced Outage Rate 0.0 1.I 13.2 | |||
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date..and Duration of Each): | |||
Refueling / maintenance outage, 4/">/85, approximately 5 weeks. | Refueling / maintenance outage, 4/">/85, approximately 5 weeks. | ||
: 25. If Shur Down At End Of Report Period. Estimated Date of Startup: | : 25. If Shur Down At End Of Report Period. Estimated Date of Startup: | ||
: 26. Units In Test Status (Prior to Commercial Operation): | N/A | ||
: 26. Units In Test Status (Prior to Commercial Operation): | |||
Forecast Achieved | |||
( | |||
INITIAL CRITICALITY 08-06-77 08-09-77 INITIAL ELECTRICITY 08-20-77 08-18-77 12-01-77 12-01-77 COMMERCIAL OPERATION W/77) | |||
a - | |||
L..- | |||
~ | |||
~=_n... | |||
~ | |||
i | i | ||
~ | |||
l l. | l l. | ||
l | 3 l | ||
I)OCKETNO. | UNIT SilulDOWNS AND POWER RElHX'TIONS I)OCKETNO. | ||
50-148 l | |||
UNIT NAME J.M. Farley - Unit 1 | UNIT NAME J.M. Farley - Unit 1 DATE l-7-85 l | ||
COMPLETED sY J. | |||
D. Woodard NEPORTMONTig December TELEPalONE (205) 899-5156 i | |||
,,g o se E | |||
.23 8 | |||
(? | gE'g Licensec Ev, h*l, Cause & Cuneceive s: | ||
o3 | re | ||
~ | |||
005 | No. | ||
l' l | 1)ete k | ||
gg g | |||
D-Regulaisuy Restsiction . | .c g x Event | ||
E-Opesaios Tsaining & license Examination F- Administ salive | (? | ||
] | |||
Actiini tu E | |||
o3 M | |||
ji5g Repost # | |||
PICvent l(ccussence MU 6 | |||
005 841211 F | |||
0 A | |||
4 N/A SD M0 Significant Power Reduction due to failure of 1A condensate pump motor bearing. Power reduced to increase feedwater pump suctipn pressure margin. | |||
l' l | |||
2 3 | |||
4 F: Fusced Reason: | |||
Method: | |||
Exhibit G - Instsuctions S: Stheduled A-Equipment Failuse(Explain) 1 -Manual for Prepasatiem ofI).ata 4 | |||
n Maintenance of Test 2 Manual Scram. | |||
Entiy Sheets fos I.icensee C-Refuchug 3 Automatic Scram. | |||
Event RepiwI(l.Elt) File tNUREG. | |||
D-Regulaisuy Restsiction. | |||
4 04hes (Explain) 0161) | |||
E-Opesaios Tsaining & license Examination F-Administ salive 5 | |||
G Ope ational Enus (Explain) | |||
ExInbit 1 Same Sousee | ExInbit 1 Same Sousee | ||
('#/17) | ('#/17) 11 Othes (Emplain) 1 4 | ||
h t | h t | ||
l.* ' | l.* ' | ||
Malling Address Allbams Power Company 600 North 18th Street Post Office Box 2641 | |||
' Birmingham, Alabama 35291 Telephone 205 783-6090 R. P. Mcdonald Senior Vice President Flintridge Budding AlabamaPower t e saat~em en :~c m:e n January 8,1985 Docket No. 50-348 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C. | |||
20555 | |||
==Dear Sir:== | ==Dear Sir:== | ||
RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the December 1984 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 1, reouired by Section 6.9.1.10 of Appendix A of the Technical Specifications. As reauested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report. | RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the December 1984 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 1, reouired by Section 6.9.1.10 of Appendix A of the Technical Specifications. As reauested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report. | ||
If you have any questions, please advise. | If you have any questions, please advise. | ||
Yours very rul | Yours very rul x | ||
/ | |||
R. P. Mcdonald l | R. P. Mcdonald l | ||
( | RPM /KWM: sam | ||
Director, RII | ( | ||
Enclosures xc: Director, IE (10 copies) | |||
Director, RII (1 copy) 1 l | |||
l l | l l | ||
l g | l g | ||
o, t | o, L | ||
t | |||
i | i | ||
' JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE | |||
==SUMMARY== | ==SUMMARY== | ||
OF OPERATIONS DECEMBER There were no unit shutdowns during the month of December. A significant power reduction occurred on 12-11-84. | OF OPERATIONS DECEMBER There were no unit shutdowns during the month of December. A significant power reduction occurred on 12-11-84. | ||
Power was reduced following failure of a bearing on the 1A condensate pump motor. | |||
The following major safety-related maintenance was performed in the 4 | |||
month of December: | |||
1. | |||
Performed miscellaneous corrective and preventive maintenance on diesel generators. | |||
1 | 1 | ||
'l i | 'l i | ||
4 | 4 | ||
,,,.}} | |||
Latest revision as of 00:35, 13 December 2024
| ML20112H818 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 12/31/1984 |
| From: | Mcdonald R, Woodard J ALABAMA POWER CO. |
| To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| NUDOCS 8501180055 | |
| Download: ML20112H818 (5) | |
Text
-
~
I DOCXIT NO.' ' 50-148 s
I UNIT DATE l-7--85 L D. Woodard COMPLETED BY TF' ** HONE (205) 899-5156
+
St0NTig December. 1984
/
DAY AVERACE DAILY F0WER LEVEL DAY AVERACE DAILY POWER LEVEL (MWe-Net)
(AlWe-Net) 818 g
g7 gig 816 820 2
gg 816~~~~-
3
..---_g9_.
817 816
~
4' 823
- g 821 3
21 816 815 6
821 22 823 7
23 823 819 g
823
- 4 819 9
,j.
818' 685 10 817 3
ll 777 1g 27 820
.I;j 12 604 3
gi g ll1 816 13 29 605 815
't 14 30 15 678 31 817 16 CISTRUCTIONS On this 63rm:r. list the :ver:se d:ily unit power levelin MWe Net for e:ch d y in the reporting munth. Campute to
, the ne:re:t whole me;: watt.
8501180055 841231 e
(DRADOCK 05000348
\\
- l
?:{
lil-m
OPERATING DATA REPORT DOCKET NO.
Sn un DATE l- / ~D COMPLETED BY J. D. Woodard TELEPHONE (2051 899-5156 OPERATING STATUS Notes
- 1. Unit Name:
Joseph M.
Farley - Unit 1
- 2. Reporting Period:
December, 1984
- 1) Cumulative data since 12-1-77, date of commercial
- 3. Licensed Thermal Power (MWt):
2652 Peration.
860
- 4. Nameplate Rating (Gross MWs):
829
- 5. Design Electrical Rating (Net MWe):
RAI R
- 6. Maximum Dependable Capacity (Gross MWe):
797 1
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A N/A
- 9. Power Level To Which Restricted,1f Any (Net MWe):
- 10. Reasons For Restrictions. If Any:
M/A d
O This Month Yr.-to Date Cur'nulative
- 11. Hours In Reporting Period 744 8,784 62,112 744.0 7,005.8 42,129.0
- 12. Number Of Hours Reactor Was Critical 0.0 0.0 3,650.0
- 13. Reactor Reserve Shutdown Hours l
- 14. Hours Gecerator On.Line 744,0 6.921.0 41.024.4
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 l
- 16. Gross Thermal Energy Generated (MWH) 1,898,787 17,799,049 103,900,575 5,751,304 33,094,314
- 17. Gross Electrical Energy Generated (MWH)
Ata 9An
- 18. Net Electrical Energy Generated (MWH) 585 848 5 427 984
'41 179 046
- 19. Unit Service Factor 100.0 78.8 66.0 100.0 78.8 66.0
- 20. Unit Availability Factor 77.5 62.9
- 21. Unit Capacity Factor (Using MDC Net) on a
- 22. Unit Capacity Factor (Using DER Net) 9s n 76 s An:s
- 23. Unit Forced Outage Rate 0.0 1.I 13.2
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date..and Duration of Each):
Refueling / maintenance outage, 4/">/85, approximately 5 weeks.
- 25. If Shur Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved
(
INITIAL CRITICALITY 08-06-77 08-09-77 INITIAL ELECTRICITY 08-20-77 08-18-77 12-01-77 12-01-77 COMMERCIAL OPERATION W/77)
a -
L..-
~
~=_n...
~
i
~
l l.
3 l
UNIT SilulDOWNS AND POWER RElHX'TIONS I)OCKETNO.
50-148 l
UNIT NAME J.M. Farley - Unit 1 DATE l-7-85 l
COMPLETED sY J.
D. Woodard NEPORTMONTig December TELEPalONE (205) 899-5156 i
,,g o se E
.23 8
gE'g Licensec Ev, h*l, Cause & Cuneceive s:
re
~
No.
1)ete k
gg g
.c g x Event
(?
]
Actiini tu E
o3 M
ji5g Repost #
PICvent l(ccussence MU 6
005 841211 F
0 A
4 N/A SD M0 Significant Power Reduction due to failure of 1A condensate pump motor bearing. Power reduced to increase feedwater pump suctipn pressure margin.
l' l
2 3
4 F: Fusced Reason:
Method:
Exhibit G - Instsuctions S: Stheduled A-Equipment Failuse(Explain) 1 -Manual for Prepasatiem ofI).ata 4
n Maintenance of Test 2 Manual Scram.
Entiy Sheets fos I.icensee C-Refuchug 3 Automatic Scram.
Event RepiwI(l.Elt) File tNUREG.
D-Regulaisuy Restsiction.
4 04hes (Explain) 0161)
E-Opesaios Tsaining & license Examination F-Administ salive 5
G Ope ational Enus (Explain)
ExInbit 1 Same Sousee
('#/17) 11 Othes (Emplain) 1 4
h t
l.* '
Malling Address Allbams Power Company 600 North 18th Street Post Office Box 2641
' Birmingham, Alabama 35291 Telephone 205 783-6090 R. P. Mcdonald Senior Vice President Flintridge Budding AlabamaPower t e saat~em en :~c m:e n January 8,1985 Docket No. 50-348 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the December 1984 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 1, reouired by Section 6.9.1.10 of Appendix A of the Technical Specifications. As reauested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.
If you have any questions, please advise.
Yours very rul x
/
R. P. Mcdonald l
RPM /KWM: sam
(
Enclosures xc: Director, IE (10 copies)
Director, RII (1 copy) 1 l
l l
l g
o, L
t
i
' JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS DECEMBER There were no unit shutdowns during the month of December. A significant power reduction occurred on 12-11-84.
Power was reduced following failure of a bearing on the 1A condensate pump motor.
The following major safety-related maintenance was performed in the 4
month of December:
1.
Performed miscellaneous corrective and preventive maintenance on diesel generators.
1
'l i
4
,,,.