| event date = 08/22/2003 02:01 CDT
| event date = 08/22/2003 02:01 CDT
| last update date = 08/27/2003
| last update date = 08/27/2003
| title = Invalid Actuation Of The "A" Standby Service Water System
| title = Invalid Actuation of the "a" Standby Service Water System
| event text = On August 22,2003, at 0201 Central Time, while operating at 100 percent power, Grand Gulf Nuclear Station experienced an invalid actuation of the 'A' Standby Service Water (SSW) System.  A failed DC/DC converter power supply in Panel 1H22P400 for the Division 1 Diesel Generator (DG) resulted in a faulty DG speed monitor signal indicating DG speed greater than 450 revolutions per minute (RPM).  The DG was not running since it was already inoperable due to a planned outage.  The event occurred during restoration activities to prepare the DG for retest.  The invalid DG start signal caused the outside air fan and SSW 'A' to auto start as designed to support DG operation.  SSW 'A' started and functioned as designed.  No other actuations occurred and all support systems functioned properly.
| event text = On August 22,2003, at 0201 Central Time, while operating at 100 percent power, Grand Gulf Nuclear Station experienced an invalid actuation of the 'A' Standby Service Water (SSW) System.  A failed DC/DC converter power supply in Panel 1H22P400 for the Division 1 Diesel Generator (DG) resulted in a faulty DG speed monitor signal indicating DG speed greater than 450 revolutions per minute (RPM).  The DG was not running since it was already inoperable due to a planned outage.  The event occurred during restoration activities to prepare the DG for retest.  The invalid DG start signal caused the outside air fan and SSW 'A' to auto start as designed to support DG operation.  SSW 'A' started and functioned as designed.  No other actuations occurred and all support systems functioned properly.
The licensee notified the NRC Resident Inspector.
The licensee notified the NRC Resident Inspector.

Latest revision as of 21:25, 1 March 2018

ENS 40108 +/-
Where
Grand Gulf Entergy icon.png
Mississippi (NRC Region 4)
Reporting
10 CFR 50.73(a)(1), Submit an LER, Invalid Actuation
Time - Person (Reporting Time:+133.67 h5.57 days <br />0.796 weeks <br />0.183 months <br />)
Opened: Gary Ingram
20:41 Aug 27, 2003
NRC Officer: Arlon Costa
Last Updated: Aug 27, 2003
40108 - NRC Website