| title = Loss | | title = Loss of Emergency Siren Capability Due to Adverse Weather Conditions | ||
| event text = Due to the effects of severe weather related to Hurricane Isabel, local power outages have resulted in an excessive number of sirens within the Salem/Hope Creek 10-mile Emergency Protection Zone (EPZ) being unavailable. At 21:11 on September 18, 2003, 29 offsite sirens were unavailable (22 in Delaware and 7 located in New Jersey). As of 22:11, some sirens have been restored, but there are still 14 unavailable in Delaware and 7 unavailable in New Jersey. It is likely that the functionality of the EPZ sirens will continue to change due to the ongoing severe weather. Sirens will be recovered when power is restored. | | event text = Due to the effects of severe weather related to Hurricane Isabel, local power outages have resulted in an excessive number of sirens within the Salem/Hope Creek 10-mile Emergency Protection Zone (EPZ) being unavailable. At 21:11 on September 18, 2003, 29 offsite sirens were unavailable (22 in Delaware and 7 located in New Jersey). As of 22:11, some sirens have been restored, but there are still 14 unavailable in Delaware and 7 unavailable in New Jersey. It is likely that the functionality of the EPZ sirens will continue to change due to the ongoing severe weather. Sirens will be recovered when power is restored. | ||
This notification is being for both Salem Generating Station and Hope Creek Generating Station pursuant to 10CFR50.72(b)(3)(xiii) as a major loss of emergency assessment, offsite response, or communication capability. Salem Units 1 and 2 are operating at 100% power with all safety related equipment operable. | This notification is being for both Salem Generating Station and Hope Creek Generating Station pursuant to 10CFR50.72(b)(3)(xiii) as a major loss of emergency assessment, offsite response, or communication capability. Salem Units 1 and 2 are operating at 100% power with all safety related equipment operable. |
Latest revision as of 22:25, 1 March 2018
Where | |
---|---|
Hope Creek ![]() New Jersey (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness | |
Time - Person (Reporting Time:+-0.57 h-0.0238 days <br />-0.00339 weeks <br />-7.80786e-4 months <br />) | |
Opened: | Tom Fowler 00:37 Sep 19, 2003 |
NRC Officer: | Steve Sandin |
Last Updated: | Sep 20, 2003 |