ENS 40807: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 06/10/2004 15:00 EDT
| event date = 06/10/2004 15:00 EDT
| last update date = 06/11/2004
| last update date = 06/11/2004
| title = Agreement State Nc -  Notification Of Equipment Failure Due To Metal Fatigue
| title = Agreement State Nc -  Notification of Equipment Failure Due to Metal Fatigue
| event text = The licensee [Flowserve US Inc.] performing Booth IR has an automatic IR setup that uses source switches to stop the extension of the source for IR operations.  The source switch at the end of the guide tube failed and the source [Ir-192] extended beyond the end of the guide tube and got stuck.  The licensee contacted Amersham (the manufacturer of the camera) for advice.  By following Amersham's suggestions the licensee was able to remotely retract the source back into the guide tube, and from there to retract the source back into the camera in the fully shielded position.  The licensee intends to have the source leak tested as soon as possible and said they would submit a complete report within 30 days.
| event text = The licensee [Flowserve US Inc.] performing Booth IR has an automatic IR setup that uses source switches to stop the extension of the source for IR operations.  The source switch at the end of the guide tube failed and the source [Ir-192] extended beyond the end of the guide tube and got stuck.  The licensee contacted Amersham (the manufacturer of the camera) for advice.  By following Amersham's suggestions the licensee was able to remotely retract the source back into the guide tube, and from there to retract the source back into the camera in the fully shielded position.  The licensee intends to have the source leak tested as soon as possible and said they would submit a complete report within 30 days.
No one was injured or overexposed during this incident.
No one was injured or overexposed during this incident.

Latest revision as of 21:23, 1 March 2018

ENS 40807 +/-
Where
Flowserve Us Inc
Raleigh, North Carolina (NRC Region 1)
License number: 092-0121-1
Organization: Nc Div Of Radiation Protection
Reporting
Agreement State
Time - Person (Reporting Time:+19.6 h0.817 days <br />0.117 weeks <br />0.0268 months <br />)
Opened: James D. Albright
14:36 Jun 11, 2004
NRC Officer: Arlon Costa
Last Updated: Jun 11, 2004
40807 - NRC Website