ENS 40922: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 08/04/2004 07:15 CDT | | event date = 08/04/2004 07:15 CDT | ||
| last update date = 08/04/2004 | | last update date = 08/04/2004 | ||
| title = Loss | | title = Loss of Emergency Notification Due to Inoperable Sirens | ||
| event text = At 0715 on August 4, 2004, Exelon was notified by Fulton Contracting that Braidwood Station had >[greater than] 25% of its emergency notification sirens inoperable. The cause of the inoperability [at 0626] for the sirens was due to a loss of power due to severe weather. As of 0708 on August 4, 2004, the number of inoperable sirens was less than 25%. Due to a major loss of emergency preparedness capabilities, this event is reportable per 10 CFR 50.72(b)(3)(xiii). | | event text = At 0715 on August 4, 2004, Exelon was notified by Fulton Contracting that Braidwood Station had >[greater than] 25% of its emergency notification sirens inoperable. The cause of the inoperability [at 0626] for the sirens was due to a loss of power due to severe weather. As of 0708 on August 4, 2004, the number of inoperable sirens was less than 25%. Due to a major loss of emergency preparedness capabilities, this event is reportable per 10 CFR 50.72(b)(3)(xiii). | ||
The licensee notified the NRC Resident Inspector. | The licensee notified the NRC Resident Inspector. |
Latest revision as of 22:23, 1 March 2018
Where | |
---|---|
Braidwood Illinois (NRC Region 3) | |
Reporting | |
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness | |
Time - Person (Reporting Time:+3.05 h0.127 days <br />0.0182 weeks <br />0.00418 months <br />) | |
Opened: | Larry Brooks 15:18 Aug 4, 2004 |
NRC Officer: | Arlon Costa |
Last Updated: | Aug 4, 2004 |
40922 - NRC Website
| |