ENS 41286: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 12/23/2004 06:14 EST
| event date = 12/23/2004 06:14 EST
| last update date = 12/23/2004
| last update date = 12/23/2004
| title = Loss Of Response Capability
| title = Loss of Response Capability
| event text = At 0614 hours on December 23, 2004, Davis-Besse activated station isolation procedures due to heavy snow and blowing snow.  This is being reported as a loss of response capability under 10CFR 50.72 (b)(3)(xiii) due to the potential inability of local authorities to perform an evacuation.  Minimum Emergency Response staffing is being maintained at the site.  The state of Ohio and Ottawa and Lucas Counties have confirmed that they are currently capable of performing their emergency plan responsibilities.
| event text = At 0614 hours on December 23, 2004, Davis-Besse activated station isolation procedures due to heavy snow and blowing snow.  This is being reported as a loss of response capability under 10CFR 50.72 (b)(3)(xiii) due to the potential inability of local authorities to perform an evacuation.  Minimum Emergency Response staffing is being maintained at the site.  The state of Ohio and Ottawa and Lucas Counties have confirmed that they are currently capable of performing their emergency plan responsibilities.
The licensee notified the NRC Resident Inspector.
The licensee notified the NRC Resident Inspector.

Latest revision as of 21:22, 1 March 2018

ENS 41286 +/-
Where
Davis Besse Cleveland Electric icon.png
Ohio (NRC Region 3)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+2.52 h0.105 days <br />0.015 weeks <br />0.00345 months <br />)
Opened: Dan Hartnett
13:45 Dec 23, 2004
NRC Officer: Bill Gott
Last Updated: Dec 23, 2004
41286 - NRC Website
Loading map...