ENS 43613: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 09/03/2007 02:14 CDT
| event date = 09/03/2007 02:14 CDT
| last update date = 09/05/2007
| last update date = 09/05/2007
| title = Manual Reactor Scram Due To Electro-Hydraulic Control (Ehc) System Leak
| title = Manual Reactor Scram Due to Electro-Hydraulic Control (Ehc) System Leak
| event text = At 0214 [CDT] on 09/03/2007 with Unit 1 at 100% power a core flow runback and manual reactor scram were initiated due to a Electro-Hydraulic Control (EHC) System leak. Units 2 and 3 were also at 100% power and were unaffected by the event. As expected reactor water level momentarily lowered below +2 inches (Reactor Low Water Level) and all appropriate PCIS [Primary Containment Isolation System] isolations, Group 2 (RHR Shutdown Cooling). Group 3 (RWCU), Group 6 (Ventilation), and Group 8 (TIP) were received along with the auto start of CREVs [Control Room Emergency Ventilation] and 3 SBGT trains.
| event text = At 0214 [CDT] on 09/03/2007 with Unit 1 at 100% power a core flow runback and manual reactor scram were initiated due to a Electro-Hydraulic Control (EHC) System leak. Units 2 and 3 were also at 100% power and were unaffected by the event. As expected reactor water level momentarily lowered below +2 inches (Reactor Low Water Level) and all appropriate PCIS [Primary Containment Isolation System] isolations, Group 2 (RHR Shutdown Cooling). Group 3 (RWCU), Group 6 (Ventilation), and Group 8 (TIP) were received along with the auto start of CREVs [Control Room Emergency Ventilation] and 3 SBGT trains.
This event is reportable as a 4-hour and 8-hour non-emergency notification along with a 60-day written report in accordance with 10 CFR 50.72(b)(2)(iv)(B), 10 CFR 50 72(b)(3)(iv)(A) and 10 CFR 50.73(a)(2)(iv)(A) as 'any event or condition that results in valid actuation of RPS or PCIS.'
This event is reportable as a 4-hour and 8-hour non-emergency notification along with a 60-day written report in accordance with 10 CFR 50.72(b)(2)(iv)(B), 10 CFR 50 72(b)(3)(iv)(A) and 10 CFR 50.73(a)(2)(iv)(A) as 'any event or condition that results in valid actuation of RPS or PCIS.'

Latest revision as of 22:16, 1 March 2018

ENS 43613 +/-
Where
Browns Ferry Tennessee Valley Authority icon.png
Alabama (NRC Region 2)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+-2.15 h-0.0896 days <br />-0.0128 weeks <br />-0.00295 months <br />)
Opened: Matthew Rasmussen
05:05 Sep 3, 2007
NRC Officer: Jason Kozal
Last Updated: Sep 5, 2007
43613 - NRC Website