| event date = 09/26/2007 22:44 CDT
| event date = 09/26/2007 22:44 CDT
| last update date = 09/27/2007
| last update date = 09/27/2007
| title = Automatic Reactor Scram During The Performance Of Aprm Surveillance Testing
| title = Automatic Reactor Scram During the Performance of Aprm Surveillance Testing
| event text = At approximately 2244 on September 26, 2007 an unplanned reactor scram occurred.  An Average Power Range Monitor (APRM) surveillance was being performed at the time.  This surveillance should not have caused a full scram and the cause of the scram is under investigation.  The plant responded to the scram as expected, all control rods fully inserted, and there is no need for emergency injection system operation.  Critical parameters are being maintained within prescribed bands and the plant has been stabilized.  A level 3 signal was received during this scram which would have caused an isolation but all affected valves were already in the closed position.   
| event text = At approximately 2244 on September 26, 2007 an unplanned reactor scram occurred.  An Average Power Range Monitor (APRM) surveillance was being performed at the time.  This surveillance should not have caused a full scram and the cause of the scram is under investigation.  The plant responded to the scram as expected, all control rods fully inserted, and there is no need for emergency injection system operation.  Critical parameters are being maintained within prescribed bands and the plant has been stabilized.  A level 3 signal was received during this scram which would have caused an isolation but all affected valves were already in the closed position.   
This event is being reported in accordance with 10CFR50.72(b)(2)(iv)(B) as an event that results in activation of the reactor protection system with the reactor critical.
This event is being reported in accordance with 10CFR50.72(b)(2)(iv)(B) as an event that results in activation of the reactor protection system with the reactor critical.

Latest revision as of 22:15, 1 March 2018

ENS 43668 +/-
Where
River Bend Entergy icon.png
Louisiana (NRC Region 4)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation
Time - Person (Reporting Time:+0.07 h0.00292 days <br />4.166667e-4 weeks <br />9.5886e-5 months <br />)
Opened: Gary Huston
03:48 Sep 27, 2007
NRC Officer: Joe O'Hara
Last Updated: Sep 27, 2007
43668 - NRC Website