ENS 45022: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 04/26/2009 10:00 EDT
| event date = 04/26/2009 10:00 EDT
| last update date = 04/26/2009
| last update date = 04/26/2009
| title = Ndt Reveals Circumferential Indications On Rcs Hot Leg Drain Piping
| title = Ndt Reveals Circumferential Indications on Rcs Hot Leg Drain Piping
| event text = On April 26, 2009 at approximately 1000 hours during the Beaver Valley Power Station Unit No. 1 (BVPS-1) refueling outage, ultrasonic (UT) examinations were performed on pipe base material per the Materials Reliability Project (MRP) MRP-146 recommendations.  The MRP recommendations were to address industry operating experience for similar indications identified by other utilities.  Two circumferential UT indications approximately 3/8 inches in length were recorded in the base material adjacent to a socket weld on the horizontal portion of line BV-1 RC-41 which is a two (2) inch drain line that connects to the 'A'  Reactor Coolant System (RCS) Hot Leg.  The function of this piping is to drain the applicable loop during maintenance periods.  The indications are not through wall and there was no evidence of leakage. Similar 2 inch drain lines on the other loops have been inspected satisfactorily.
| event text = On April 26, 2009 at approximately 1000 hours during the Beaver Valley Power Station Unit No. 1 (BVPS-1) refueling outage, ultrasonic (UT) examinations were performed on pipe base material per the Materials Reliability Project (MRP) MRP-146 recommendations.  The MRP recommendations were to address industry operating experience for similar indications identified by other utilities.  Two circumferential UT indications approximately 3/8 inches in length were recorded in the base material adjacent to a socket weld on the horizontal portion of line BV-1 RC-41 which is a two (2) inch drain line that connects to the 'A'  Reactor Coolant System (RCS) Hot Leg.  The function of this piping is to drain the applicable loop during maintenance periods.  The indications are not through wall and there was no evidence of leakage. Similar 2 inch drain lines on the other loops have been inspected satisfactorily.
The plant is currently shutdown and in Mode 6. The affected RCS loop is not required to be Operable and is currently isolated and drained. Repairs are currently being planned and will be completed prior to
The plant is currently shutdown and in Mode 6. The affected RCS loop is not required to be Operable and is currently isolated and drained. Repairs are currently being planned and will be completed prior to

Latest revision as of 21:12, 1 March 2018

ENS 45022 +/-
Where
Beaver Valley
Pennsylvania (NRC Region 1)
Reporting
10 CFR 50.72(b)(3)(ii)(A), Seriously Degraded
LER: 05000334/LER-2009-004
Time - Person (Reporting Time:+-0.23 h-0.00958 days <br />-0.00137 weeks <br />-3.15054e-4 months <br />)
Opened: Dan Schwer
13:46 Apr 26, 2009
NRC Officer: Bill Huffman
Last Updated: Apr 26, 2009
45022 - NRC Website
Loading map...