ML20129G631: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML20129G631
| number = ML20129G631
| issue date = 10/01/1996
| issue date = 10/01/1996
| title = Advises That Giraffe Helium Series Test Rept,As Requested by 960624 Ltr Will Be Withheld from Public Disclosure Per 10CFR2.790(b)(5) & Section 103(b) of 1954 AEA
| title = Advises That Giraffe Helium Series Test Rept,As Requested by Will Be Withheld from Public Disclosure Per 10CFR2.790(b)(5) & Section 103(b) of 1954 AEA
| author name = Ninh S
| author name = Ninh S
| author affiliation = NRC (Affiliation Not Assigned)
| author affiliation = NRC (Affiliation Not Assigned)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 9610070240
| document report number = NUDOCS 9610070240
| title reference date = 06-24-1996
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| page count = 3
| page count = 3
Line 16: Line 17:


=Text=
=Text=
{{#Wiki_filter:--       -    -  .                                      _ _ _ .                _.
{{#Wiki_filter:--
  ''        p arg%   ,                          UNITED STATES f               a             NUCLEAR REGULATORY COMMISSION I*               I WASHINGTON, D.C. 20066 4 001 k.....                                           October 1, 1996 Mr. James E. Quinn, Projects Manager LMR and SBWR Programs GE Nuclear Energy 175 Curtner Avenue, M/C 165 San Jose, California 95125
p arg%
{        
UNITED STATES f
a NUCLEAR REGULATORY COMMISSION I*
I WASHINGTON, D.C. 20066 4 001 k.....
October 1, 1996 Mr. James E. Quinn, Projects Manager LMR and SBWR Programs GE Nuclear Energy 175 Curtner Avenue, M/C 165 San Jose, California 95125
{


==Dear Mr. Quinn:==
==Dear Mr. Quinn:==
==SUBJECT:==
==SUBJECT:==
 
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE ELECTRIC (GE) GIRAFFE HELIUM SERIES TEST REPORT By your {{letter dated|date=June 24, 1996|text=letter dated June 24, 1996}}, you submitted the " GIRAFFE Helium Series Test Report," NEDC-32608P, June 1996, and requested that it be withheld from public disclosure.
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE, ELECTRIC (GE) GIRAFFE HELIUM SERIES TEST REPORT By your letter dated June 24, 1996, you submitted the " GIRAFFE Helium Series Test publicReport,"
is support 3d by an affidavit executed by Joseph F. Quirk, dated Ju which claims in part that information identified by bar in the right-side 24, 1996, margins is ciascified as proprietary because it contains detailed results of the Simplified Boiling Water Reactor (SBWR) tests.
disclosure. NEDC-32608P, June 1996, and requested that it be withheld from is support 3d by an affidavit executed by Joseph F. Quirk, dated Ju which claims in part that information identified by bar in the right-side 24, 1996, margins is ciascified as proprietary because it contains detailed results of the Simplified Boiling Water Reactor (SBWR) tests.               This SBWR test program has been under development by GE and its associates for more than seven years at a total cost of tens of millions of dollars. In addition, the affidavit identifies the following reasons for maintaining the information as propri-etary:
This SBWR test program has been under development by GE and its associates for more than seven years at a total cost of tens of millions of dollars.
: 1. Information that discloses a supporting data and analyses, process, method, or apparatus, includi tors other over    without   license from GE constitutes a competitive economic advantage companies; i
In addition, the affidavit identifies the following reasons for maintaining the information as propri-etary:
1.
Information that discloses a supporting data and analyses, process, method, or apparatus, includ tors without license from GE constitutes a competitive economic advantage over other companies; i
2.
2.
Information which, if used by a competitor, would reduce his expenditures of resources or improve his competitive position in the design, manufac-ture, shipment, similar    product. installation, assurance of quality, or licensing of a We have reviewed your letter and the material in accordance with the require-ments of 10 CFR 2.790 and, on the basis of your statements, have determined                     ,
Information which, if used by a competitor, would reduce his expenditures of resources or improve his competitive position in the design, manufac-ture, shipment, installation, assurance of quality, or licensing of a similar product.
that the subject report contains trade secrets or proprietary commercial information.
We have reviewed your letter and the material in accordance with the require-ments of 10 CFR 2.790 and, on the basis of your statements, have determined that the subject report contains trade secrets or proprietary commercial i
i Therefore, the subject " GIRAFFE Helium Series Test Report",
information.
dated June 1996, will be withheld from public disclosure pursuant to 10 CFR 2.790(b 5 and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Therefore, the subject " GIRAFFE Helium Series Test Report",
The nonp)r(op)rietary version of the " GIRAFFE Helium Series T placed in the Nuclear Regulatory Commission's (NRC's) Public Document Room.
dated June 1996, will be withheld from public disclosure pursuant to 10 CFR 2.790(b 5 The nonp)r(op)rietary version of the " GIRAFFE Helium Series T and Section 103(b) of the Atomic Energy Act of 1954, as amended.
                                                                      %N PJ                                                                              f(1-(lW A      !$8! Eo$r i
placed in the Nuclear Regulatory Commission's (NRC's) Public Document Room.
%N f(1-(lW PJ !$8! Eo$r A
i


l         ,        <
l
                                                                  ^
^
                            )*
)*
y _>
y _>
          ,r(James E. Quinn                                                                                                   Jctober i, 1996 d!
,r(James E. Quinn Jctober i, 1996 d!
Vithholding from public inspection shall not affect the right, if any, of persons properly and di.*ectly concerned to inspect the document.                                                                     If the need
Vithholding from public inspection shall not affect the right, if any, of persons properly and di.*ectly concerned to inspect the document.
      @Jthis    arises, area.we        Wemay    will,send      copies of course,       ensure   of thisthat                            information  to our ccesultants the consultants have signedworking the         in p appropriate agreements for handling proprietary information.
If the need
          'If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You should also understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request included your information. In all review situations, if the NkC needs additional information from you or makes a determination adverse to the above, you will be notified in advance of any public disclosure.                                                                                                                     _
@J arises, we may send copies of this information to our ccesultants working in this area. We will, of course, ensure that the consultants have signed the p appropriate agreements for handling proprietary information.
'If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC.
You should also understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request included your information.
In all review situations, if the NkC needs additional information from you or makes a determination adverse to the above, you will be notified in advance of any public disclosure.
Sincerely, original signed by: Theodore R. Quay Son Q. Ninh, Project Manager Standardization Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No. 52-004 cc: See next page DISTRIBUTION:
Sincerely, original signed by: Theodore R. Quay Son Q. Ninh, Project Manager Standardization Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No. 52-004 cc: See next page DISTRIBUTION:
Docket File                                               PDST R/F                                                       TMartin PUBLIC                                                   SGrimes                                                         TQuay DScaletti                                                 WDean, ED0                                                     EJordan, T-4 D18                                   -
Docket File PDST R/F TMartin PUBLIC SGrimes TQuay DScaletti WDean, ED0 EJordan, T-4 D18 JMoore, 0-15 B18 ACRS (11)
JMoore, 0-15 B18                                         ACRS (11)                                                       MPSiemien, 0-15 B18
MPSiemien, 0-15 B18
)
)
_    ,                                                4 4                             ,
4 4
DIENT           NAME: A: PROP-GE.50 (2B SBWR DISK) ulve e sepy of tide sleewee6mt,Inebaees in the ben: 'C' = Copy withJul attachmentlenclDSure "E" = Copy with attachment / enclosure                     *N" = No copy
DIENT NAME: A: PROP-GE.50 (2B SBWR DISK) ulve e sepy of tide sleewee6mt,Inebaees in the ben: 'C' = Copy withJul attachmentlenclDSure "E" = Copy with attachment / enclosure
' ICE lPM_:PDST:DRPM                         l     PM:PDST:DRPM                                           OGC               )   D:PDST:DRPM l IE         SQNinh                       -
*N" = No copy
DCScalett R                                             MPSiemien D/ V         TRQuay "( W E         09//N96-09/P796ff/                                               09/.$/96             i0f///96
' ICE lPM_:PDST:DRPM l
                                                                .OFflCIAL RECORD COPY                                                                                               -
PM:PDST:DRPM OGC
    .+
)
q
D:PDST:DRPM l IE SQNinh DCScalett R MPSiemien D/ V TRQuay "( W E
                                                                                                                                                                    .t ')
09//N96-09/P796ff/
9 g"m                        .
09/.$/96 i0f///96
EC RLE CEPJIER COPY                             \[
.OFflCIAL RECORD COPY q
i
.+
                                                                                                                                '6- //V
9
')
.t EC RLE CEPJIER COPY\\[
g"m
'6- //V i


q
q t
                                      ,.                                                                                                                      t A,'                '
A,'
>                                  ,                                    "1 Mr. James E. Quinn                                                                   October 1, 1996 9
"1 Mr. James E. Quinn October 1, 1996 9
Withholding from public inspection shall not affect the right, if any, of                                                                   ,"
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the document.
persons properly and directly concerned to inspect the document. If the need arises, we may send copies of this information +.o our consultants working in                                                               :
If the need arises, we may send copies of this information +.o our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
this area. We will, of course, ensure that the consultants have signed the                                                                 !
1 If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC.
appropriate agreements for handling proprietary information.                                                                               1 If the basis for withholding this information from public inspection should                                                                 ;
You :hould also understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request included your information.
change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You :hould also understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request included your information. In all review situations, if the NRC needs                                                                       ,
In all review situations, if the NRC needs additional information from you or makes a determination adverse to the above, you will be notified in advance of any public disclosure.
additional information from you or makes a determination adverse to the above, you will be notified in advance of any public disclosure.
Sincerely, original signed by: Theodore R. Quay Son Q. Ninh, Project Manager Standardization Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No. 52-004 cc:
Sincerely, original signed by: Theodore R. Quay Son Q. Ninh, Project Manager Standardization Project Directorate Division of Reactor Program Management                                       .
See next page DISTRIBUTION:
Office of Nuclear Reactor Regulation                                       '
Docket File PDST R/F TMartin PUBLIC BGrimes TQuay DScaletti WDean, EDO EJordan, T-4 D18 JMoore, 0-15 B18 ACRS (11)
Docket No. 52-004 cc:     See next page DISTRIBUTION:
MPSiemien, 0-15 B18 i
Docket File                                             PDST R/F                           TMartin PUBLIC                                                   BGrimes                           TQuay                                             l DScaletti                                               WDean, EDO                         EJordan, T-4 D18                                 '
~,
JMoore, 0-15 B18                                         ACRS (11)                         MPSiemien, 0-15 B18                               ,
t s
i
DOCUMENT.NAME: 'A: PROP-GE.50 (2B SBWR DISK)
                ~,                                                           >
TJ seashe a sepy et this doeusnoot, ladsete la the bes: 'C' s Copy without ettechenent/ enclosure
t                   s DOCUMENT.NAME: 'A: PROP-GE.50 (2B SBWR DISK)
*E* = Copy with attachment / enclosure
TJ seashe a sepy et this doeusnoot, ladsete la the bes: 'C' s Copy without ettechenent/ enclosure *E* = Copy with attachment / enclosure
* N* = No copy 0FFICE PM_:PDST:DRPM l
* N* = No copy 0FFICE         PM_:PDST:DRPM                 l   PM:PDST:DRPMl               OGC                 ?, D:PDST:DRPM l                                    l l
PM:PDST:DRPMl OGC
NAME           S$1nh                             DCScalett R                 F.iemien         DN TRQuay "lhV                                             l DATE           09//11/96-09/ff 796] W               09/.t/96                 i0f///96
?, D:PDST:DRPM l l
                                                    ,                  .0FFICIAL RECORD COPY s
NAME S$1nh DCScalett R F.iemien DN TRQuay "lhV DATE 09//11/96-09/ff 796] W 09/.t/96 i0f///96
                                                ~                     '
.0FFICIAL RECORD COPY
                                                                                                                                                      , (y?)
~
                                                                                                                                                      \)
?
ygm                                           Nfl0 RLE CENTER COPY                                                 '[
, (y )
s
\\)
ygm Nfl0 RLE CENTER COPY '[
h
h
                                                                                                        + ur J
+ ur J


t Mr. James E. Quinn                                 Docket No. 52-004 GE Nuclear Energy l
t Mr. James E. Quinn Docket No. 52-004 GE Nuclear Energy cc: Mr. Rob Wallace Mr. Brian McIntyre i
cc: Mr. Rob Wallace                                 Mr. Brian McIntyre                   i GE Nuclear Energy                         Westinghouse Electric Corporation 1299 Pennsylvania Avenue, N.W.           Energy Systems Business Unit         i Suite 1100                               Box 355 Washington, DC 20004                     Pittsburgh, PA 15222               {
GE Nuclear Energy Westinghouse Electric Corporation 1299 Pennsylvania Avenue, N.W.
Director, Criteria & Standards Division Office of Radiation Programs U.S. Environmental Protection Agency                                           I 401 M Street, S.W.                                                           ,
Energy Systems Business Unit i
Washington, DC 204C0                                                           '
Suite 1100 Box 355 Washington, DC 20004 Pittsburgh, PA 15222
Mr. Sterling Franks U.S. Department of Energy                                                     ,
{
NE-42                                                                         1 Washington, DC 20585 Mr. Robert H. Buchholz GE Nuclear Energy 175 Curtner Avenue, MC-781 San Jose, CA 95125 Mr. Steven A. Hucik GE Nuclear Energy 175 Curtner Avenue, MC-780                                                   i San Jose, CA 95125 Mr. Tom J. Mulford, Manager                                                   !
Director, Criteria & Standards Division Office of Radiation Programs U.S. Environmental Protection Agency I
SBWR Design Certification Electric Power Research Institute 3412 Hillview Avenue Palo Alto, CA 94304-1395 i
401 M Street, S.W.
                                                                                                  )
Washington, DC 204C0 Mr. Sterling Franks U.S. Department of Energy NE-42 1
                            .}}
Washington, DC 20585 Mr. Robert H. Buchholz GE Nuclear Energy 175 Curtner Avenue, MC-781 San Jose, CA 95125 Mr. Steven A. Hucik GE Nuclear Energy 175 Curtner Avenue, MC-780 i
San Jose, CA 95125 Mr. Tom J. Mulford, Manager SBWR Design Certification Electric Power Research Institute 3412 Hillview Avenue Palo Alto, CA 94304-1395 i
)
.}}

Latest revision as of 11:11, 12 December 2024

Advises That Giraffe Helium Series Test Rept,As Requested by Will Be Withheld from Public Disclosure Per 10CFR2.790(b)(5) & Section 103(b) of 1954 AEA
ML20129G631
Person / Time
Site: 05200004
Issue date: 10/01/1996
From: Son Ninh
NRC (Affiliation Not Assigned)
To: Quinn J
GENERAL ELECTRIC CO.
References
NUDOCS 9610070240
Download: ML20129G631 (3)


Text

--

p arg%

UNITED STATES f

a NUCLEAR REGULATORY COMMISSION I*

I WASHINGTON, D.C. 20066 4 001 k.....

October 1, 1996 Mr. James E. Quinn, Projects Manager LMR and SBWR Programs GE Nuclear Energy 175 Curtner Avenue, M/C 165 San Jose, California 95125

{

Dear Mr. Quinn:

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE ELECTRIC (GE) GIRAFFE HELIUM SERIES TEST REPORT By your letter dated June 24, 1996, you submitted the " GIRAFFE Helium Series Test Report," NEDC-32608P, June 1996, and requested that it be withheld from public disclosure.

is support 3d by an affidavit executed by Joseph F. Quirk, dated Ju which claims in part that information identified by bar in the right-side 24, 1996, margins is ciascified as proprietary because it contains detailed results of the Simplified Boiling Water Reactor (SBWR) tests.

This SBWR test program has been under development by GE and its associates for more than seven years at a total cost of tens of millions of dollars.

In addition, the affidavit identifies the following reasons for maintaining the information as propri-etary:

1.

Information that discloses a supporting data and analyses, process, method, or apparatus, includ tors without license from GE constitutes a competitive economic advantage over other companies; i

2.

Information which, if used by a competitor, would reduce his expenditures of resources or improve his competitive position in the design, manufac-ture, shipment, installation, assurance of quality, or licensing of a similar product.

We have reviewed your letter and the material in accordance with the require-ments of 10 CFR 2.790 and, on the basis of your statements, have determined that the subject report contains trade secrets or proprietary commercial i

information.

Therefore, the subject " GIRAFFE Helium Series Test Report",

dated June 1996, will be withheld from public disclosure pursuant to 10 CFR 2.790(b 5 The nonp)r(op)rietary version of the " GIRAFFE Helium Series T and Section 103(b) of the Atomic Energy Act of 1954, as amended.

placed in the Nuclear Regulatory Commission's (NRC's) Public Document Room.

%N f(1-(lW PJ !$8! Eo$r A

i

l

^

)*

y _>

,r(James E. Quinn Jctober i, 1996 d!

Vithholding from public inspection shall not affect the right, if any, of persons properly and di.*ectly concerned to inspect the document.

If the need

@J arises, we may send copies of this information to our ccesultants working in this area. We will, of course, ensure that the consultants have signed the p appropriate agreements for handling proprietary information.

'If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC.

You should also understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request included your information.

In all review situations, if the NkC needs additional information from you or makes a determination adverse to the above, you will be notified in advance of any public disclosure.

Sincerely, original signed by: Theodore R. Quay Son Q. Ninh, Project Manager Standardization Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No.52-004 cc: See next page DISTRIBUTION:

Docket File PDST R/F TMartin PUBLIC SGrimes TQuay DScaletti WDean, ED0 EJordan, T-4 D18 JMoore, 0-15 B18 ACRS (11)

MPSiemien, 0-15 B18

)

4 4

DIENT NAME: A: PROP-GE.50 (2B SBWR DISK) ulve e sepy of tide sleewee6mt,Inebaees in the ben: 'C' = Copy withJul attachmentlenclDSure "E" = Copy with attachment / enclosure

  • N" = No copy

' ICE lPM_:PDST:DRPM l

PM:PDST:DRPM OGC

)

D:PDST:DRPM l IE SQNinh DCScalett R MPSiemien D/ V TRQuay "( W E

09//N96-09/P796ff/

09/.$/96 i0f///96

.OFflCIAL RECORD COPY q

.+

9

')

.t EC RLE CEPJIER COPY\\[

g"m

'6- //V i

q t

A,'

"1 Mr. James E. Quinn October 1, 1996 9

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the document.

If the need arises, we may send copies of this information +.o our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

1 If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC.

You :hould also understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request included your information.

In all review situations, if the NRC needs additional information from you or makes a determination adverse to the above, you will be notified in advance of any public disclosure.

Sincerely, original signed by: Theodore R. Quay Son Q. Ninh, Project Manager Standardization Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No.52-004 cc:

See next page DISTRIBUTION:

Docket File PDST R/F TMartin PUBLIC BGrimes TQuay DScaletti WDean, EDO EJordan, T-4 D18 JMoore, 0-15 B18 ACRS (11)

MPSiemien, 0-15 B18 i

~,

t s

DOCUMENT.NAME: 'A: PROP-GE.50 (2B SBWR DISK)

TJ seashe a sepy et this doeusnoot, ladsete la the bes: 'C' s Copy without ettechenent/ enclosure

  • E* = Copy with attachment / enclosure
  • N* = No copy 0FFICE PM_:PDST:DRPM l

PM:PDST:DRPMl OGC

?, D:PDST:DRPM l l

NAME S$1nh DCScalett R F.iemien DN TRQuay "lhV DATE 09//11/96-09/ff 796] W 09/.t/96 i0f///96

.0FFICIAL RECORD COPY

~

?

, (y )

s

\\)

ygm Nfl0 RLE CENTER COPY '[

h

+ ur J

t Mr. James E. Quinn Docket No.52-004 GE Nuclear Energy cc: Mr. Rob Wallace Mr. Brian McIntyre i

GE Nuclear Energy Westinghouse Electric Corporation 1299 Pennsylvania Avenue, N.W.

Energy Systems Business Unit i

Suite 1100 Box 355 Washington, DC 20004 Pittsburgh, PA 15222

{

Director, Criteria & Standards Division Office of Radiation Programs U.S. Environmental Protection Agency I

401 M Street, S.W.

Washington, DC 204C0 Mr. Sterling Franks U.S. Department of Energy NE-42 1

Washington, DC 20585 Mr. Robert H. Buchholz GE Nuclear Energy 175 Curtner Avenue, MC-781 San Jose, CA 95125 Mr. Steven A. Hucik GE Nuclear Energy 175 Curtner Avenue, MC-780 i

San Jose, CA 95125 Mr. Tom J. Mulford, Manager SBWR Design Certification Electric Power Research Institute 3412 Hillview Avenue Palo Alto, CA 94304-1395 i

)

.