ML20129G957: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:e
{{#Wiki_filter:e
B
'
'
                                                                                          B
p (A
  . -     ..
. -
                                                                                    p (A
..
                                          .
{MM 31 GB5
                                            {MM 31 GB5
.
      Docks.t No. 50-461
Docks.t No. 50-461
      Illinois Power Company
Illinois Power Company
      ATTN: Mr. W. C. Gerstner
ATTN: Mr. W. C. Gerstner
                Executive Vice President
Executive Vice President
      500 South 27th Street
500 South 27th Street
      Decatur, Il 62525
Decatur, Il 62525
      Gentlemen:
Gentlemen:
      This refers to the routine safety inspection conducted by Messrs. T. P. Gwynn,
This refers to the routine safety inspection conducted by Messrs. T. P. Gwynn,
      W. F. Christianson, F. J. Jablonski, and P. L. Hiland of this office on
W. F. Christianson, F. J. Jablonski, and P. L. Hiland of this office on
      April 16, 1985 through May 28, 1985 of activities at Clinton Power Station
April 16, 1985 through May 28, 1985 of activities at Clinton Power Station
      authorized by NRC Construction Permit No. CFPR-137, and to the discussion of
authorized by NRC Construction Permit No. CFPR-137, and to the discussion of
      our findings with yourself and others of your staff at the conclusion of the
our findings with yourself and others of your staff at the conclusion of the
      inspection.
inspection.
      The enclosed copy of our inspection report identifies areas examined during
The enclosed copy of our inspection report identifies areas examined during
      .the inspection. Within.these areas, the inspection consisted of a selective
.the inspection.
      examination of procedures and representative records, observations, and
Within.these areas, the inspection consisted of a selective
      interviews with personnel.
examination of procedures and representative records, observations, and
      No items of noncompliance with NRC requirements were identified during the
interviews with personnel.
      course of this inspection.
No items of noncompliance with NRC requirements were identified during the
      In accordance with 10 CFR 2.790, a copy of this letter and the enclosure (s)
course of this inspection.
      will be placed in the NRC's Public Document Room.
In accordance with 10 CFR 2.790, a copy of this letter and the enclosure (s)
              8506070422 850531
will be placed in the NRC's Public Document Room.
              PDR ADOCM 05000461                                                         \
8506070422 850531
              *                 PDR                                                     O
PDR
                                                                                      G
ADOCM 05000461
                                                                                    ,Y 1 \
\\
                                                        .   .   .
*
O
PDR
G
,Y 1 \\
.
.
.


  '
'
    s       .
s
        Illinois Power company                       2                           MAY31 1985'
.
        We will-gladly discuss any questions you have concerning this inspection.
Illinois Power company
                                                  Sincerely,
2
                                              3' Original sicacd by .R. F. Varnick"
MAY31 1985'
                                                  R. F. Warnick, Chief
We will-gladly discuss any questions you have concerning this inspection.
                                                  Projects Branch 1
Sincerely,
        Enclosure: Inspection Report
3' Original sicacd by .R. F. Varnick"
          -No. 50-461/85021(DRP)
R. F. Warnick, Chief
        cc w/ enclosure:
Projects Branch 1
        DMB/ Document Control Desk (RIDS)
Enclosure:
        Resident Inspector, RIII
Inspection Report
        Richard Hubbard-
-No. 50-461/85021(DRP)
        Gary N. Wright, Manager
cc w/ enclosure:
            Nuclear Facility Safety
DMB/ Document Control Desk (RIDS)
        Jean Foy, Prairie Alliance
Resident Inspector, RIII
        Allen Samelson, Assistant
Richard Hubbard-
            Attorney General,
Gary N. Wright, Manager
            Environmental Control Division
Nuclear Facility Safety
        H. S. Taylor, Quality Assurance
Jean Foy, Prairie Alliance
Allen Samelson, Assistant
Attorney General,
Environmental Control Division
H. S. Taylor, Quality Assurance
Division
*
*
            Division
&
&
          J
J
      .
.
.
R
I-
.'RI h
RII
RIII'
.I
,Y
Rru)
n/kja
Ja
nski
e1
Greenma
Warnick
$/31/85
gy
-
. --
.
..
.
.
        R      I-        .'RI h                      RII                  RIII'
- , . - . - - . -
        .I                                                            ,Y Rru)
- - .
                n/kja    Ja    nski      e1        Greenma              Warnick
_
        $/31/85                            gy
. - .
                      -    . --      .  ..  .      - , . - . - - . -     - - .     _
                                                                                          . - .
}}
}}

Latest revision as of 11:07, 12 December 2024

Forwards Insp Rept 50-461/85-21 on 850416-0528.No Noncompliance Noted
ML20129G957
Person / Time
Site: Clinton 
Issue date: 05/31/1985
From: Warnick R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
Shared Package
ML20129G960 List:
References
NUDOCS 8506070422
Download: ML20129G957 (2)


See also: IR 05000416/2005028

Text

e

B

'

p (A

. -

..

{MM 31 GB5

.

Docks.t No. 50-461

Illinois Power Company

ATTN: Mr. W. C. Gerstner

Executive Vice President

500 South 27th Street

Decatur, Il 62525

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. T. P. Gwynn,

W. F. Christianson, F. J. Jablonski, and P. L. Hiland of this office on

April 16, 1985 through May 28, 1985 of activities at Clinton Power Station

authorized by NRC Construction Permit No. CFPR-137, and to the discussion of

our findings with yourself and others of your staff at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas examined during

.the inspection.

Within.these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790, a copy of this letter and the enclosure (s)

will be placed in the NRC's Public Document Room.

8506070422 850531

PDR

ADOCM 05000461

\\

O

PDR

G

,Y 1 \\

.

.

.

'

s

.

Illinois Power company

2

MAY31 1985'

We will-gladly discuss any questions you have concerning this inspection.

Sincerely,

3' Original sicacd by .R. F. Varnick"

R. F. Warnick, Chief

Projects Branch 1

Enclosure:

Inspection Report

-No. 50-461/85021(DRP)

cc w/ enclosure:

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Richard Hubbard-

Gary N. Wright, Manager

Nuclear Facility Safety

Jean Foy, Prairie Alliance

Allen Samelson, Assistant

Attorney General,

Environmental Control Division

H. S. Taylor, Quality Assurance

Division

&

J

.

.

R

I-

.'RI h

RII

RIII'

.I

,Y

Rru)

n/kja

Ja

nski

e1

Greenma

Warnick

$/31/85

gy

-

. --

.

..

.

- , . - . - - . -

- - .

_

. - .