{{#Wiki_filter:.    ..                                                                                                                  t Dave Morzy               S uther2Nucl:ar i
{{#Wiki_filter:t Dave Morzy S uther2Nucl:ar Vice President Operating Company i
Vice President           Operating Company Farley Project           P.O. Box 1295 Birmingham. Alabama 35201 Tel 205.992.5131 I
Farley Project P.O. Box 1295 Birmingham. Alabama 35201 Tel 205.992.5131 I
l December 10, 1996 SOUTHERN COMPANY               i Energy to Serve YourWorld' l
SOUTHERN December 10, 1996 COMPANY i
Docket Nos.         50-348 50-364 U. S. Nuclect Regulatory Commission ATTN: Document Control Desk Washington, D C 20555 Joseph M. Farley Nuclear Plant Monthly Operating Report i
Energy to Serve YourWorld' l
Ladies and Gentlemen:                                                                                       'l l
Docket Nos.
Attached are the November 1996 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.
50-348 50-364 U. S. Nuclect Regulatory Commission ATTN: Document Control Desk Washington, D C 20555 Joseph M. Farley Nuclear Plant Monthly Operating Report i
Ladies and Gentlemen:
'l Attached are the November 1996 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.
If you have any questions, please advise.
If you have any questions, please advise.
Respectfully submitted, h       W'W Dave Morey RWC:(mor)
Respectfully submitted, h
Attachments cc:       Mr. S. D. Ebneter, Region II Administrator Mr. J. I. Zimmerman, NRR Project Manager Mr. T. M. Ross, FNP Sr. Resident inspector l
W'W Dave Morey RWC:(mor)
l Ie W 9612180097 961130 PDR     ADOCK 05000348 R                           PDR 170025
Attachments cc:
Mr. S. D. Ebneter, Region II Administrator Mr. J. I. Zimmerman, NRR Project Manager Mr. T. M. Ross, FNP Sr. Resident inspector l
l Ie W 9612180097 961130 PDR ADOCK 05000348 R
PDR 170025


i, L
i L
1 d
1 d
k Joseph M. Farley Nuclear Plant
k Joseph M. Farley Nuclear Plant Unit 1 j
;                                                              Unit 1 j                                         Narrative Summary of Operations i                                                   November 1996 i
Narrative Summary of Operations i
November 1996 i
4 4
4 4
;                      There were no unit shutdowns or major power reductions during the month.
There were no unit shutdowns or major power reductions during the month.
There was no major safety related maintenance perfonned during the month.
There was no major safety related maintenance perfonned during the month.
i f
i f
Line 46: Line 52:
4
4


OPERATING DATA REPORT DOCKET NO.             50-348 DATE     December 9,1996 COMPLETED BY           M. W. McAnuity TELEPilONE     (334) 899-5156, ext.3640 OPERATINGETATUS
OPERATING DATA REPORT DOCKET NO.
: 1. Unit Name:                       Joseph M. Farley - Unit 1         Notes
50-348 DATE December 9,1996 COMPLETED BY M. W. McAnuity TELEPilONE (334) 899-5156, ext.3640 OPERATINGETATUS 1.
: 2. Reporting Period:                             November 1996       1) Cumulative data since 12-01-77,
Unit Name:
: 3. Licensed Thermal Power (MWt):                           2,652       date of commercial operation.
Joseph M. Farley - Unit 1 Notes 2.
: 4. Nameplate Rating (Gross MWe):                               860
Reporting Period:
: 5. Design Electrical Rating (Net MWe):                       829
November 1996
: 6. Maximum Dependable Capacity (Gross MWe):                 855.7
: 1) Cumulative data since 12-01-77, 3.
: 7. Maximum Dependable Capacity (Net MWe):                     812 .
Licensed Thermal Power (MWt):
l
2,652 date of commercial operation.
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) 8mee Last Report, Give Reasons:                     N/A J
4.
: 9. Power Level To Which Restricted, If Any (Net MWe):               N/A                                           )
Nameplate Rating (Gross MWe):
: 10. Reasons For Restrictions,If Any:                                 N/A                                           l 1
860 5.
l This Month           Yr. to Date           Cumulative
Design Electrical Rating (Net MWe):
: 11. Hours in Reporting Period                                 720.0               8,040.0               166,560.0
829 6.
: 12. Number Of Hours . Reactor Was Critical                   720.0               8,011.3               134,700.7
Maximum Dependable Capacity (Gross MWe):
: 13. Reactor Reserve Shutdown Hours                               0.0                 0.0                 3,650.0
855.7 7.
: 14. Hours Generator On-line                                   720.0             7,996.0               132,671.7
Maximum Dependable Capacity (Net MWe):
: 15. Unit Reserve Shutdown Hours                                 0.0                 0.0                       0.0
812 8.
: 16. Gross Thermal Energy Generated (MWH)               1,908,591.4         20,991,545.5           341,745,918.4 l
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) 8mee Last Report, Give Reasons:
: 17. Gross Electrical Energy Generated (MWH)               627,580.0         6,870,335.0           110,362,489.0
N/A J
: 18. Net Electrical Energy Generated (MWH)                 596,556.0         6,525,209.0           104,264,861.0
9.
: 19. Unit Service Factor                                       100.0                 99.5                     79.7
Power Level To Which Restricted, If Any (Net MWe):
: 20. Unit Availability Factor                                 100.0                 99.5                     79.7
N/A
: 21. Unit Capacity Factor (Using MDC Net)                     102.0                 99.9                     77.1
: 10. Reasons For Restrictions,If Any:
: 22. Unit Capacity Factor (Using DER Net)                       99.9                 97.9                     75.5
N/A This Month Yr. to Date Cumulative
: 23. Unit Forced Outage Rate                                     0.0                 0.0                       5.6
: 11. Hours in Reporting Period 720.0 8,040.0 166,560.0
: 12. Number Of Hours. Reactor Was Critical 720.0 8,011.3 134,700.7
: 13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0
: 14. Hours Generator On-line 720.0 7,996.0 132,671.7
: 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
: 16. Gross Thermal Energy Generated (MWH) 1,908,591.4 20,991,545.5 341,745,918.4
: 17. Gross Electrical Energy Generated (MWH) 627,580.0 6,870,335.0 110,362,489.0
: 18. Net Electrical Energy Generated (MWH) 596,556.0 6,525,209.0 104,264,861.0
: 19. Unit Service Factor 100.0 99.5 79.7
: 20. Unit Availability Factor 100.0 99.5 79.7
: 21. Unit Capacity Factor (Using MDC Net) 102.0 99.9 77.1
: 22. Unit Capacity Factor (Using DER Net) 99.9 97.9 75.5
: 23. Unit Forced Outage Rate 0.0 0.0 5.6
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling Outage scheduled for March 15,1997 with a duration of 49 days.
Refueling Outage scheduled for March 15,1997 with a duration of 49 days.
: 25. If Shut Down at End Of Report Period, Estimated Date of Startup:     N/A
: 25. If Shut Down at End Of Report Period, Estimated Date of Startup:
: 26. Units In Test Status (Prior To Commercial 7peration)-                   Forecast               Achieved Initial Criticality                                 08/06/77               08/09/77 Initial Electricity                                 08/20/77               08/l8/77 Commercial Operation                               12/01/77               12/01/77
N/A
: 26. Units In Test Status (Prior To Commercial 7peration)-
Forecast Achieved Initial Criticality 08/06/77 08/09/77 Initial Electricity 08/20/77 08/l8/77 Commercial Operation 12/01/77 12/01/77


                    ,                                                                DOCKET NO.           50-348 UNIT             1 i                                                                                           DATE December 9,1996 4
DOCKET NO.
COMPLETED BY           M. W. McAnulty TELEPHONE (334) 899-5156 ext 3640 4
50-348 UNIT 1
MONTH       November l
i DATE December 9,1996 COMPLETED BY M. W. McAnulty 4
DAY   AVERAGE DAILY POWER LEVEL                   DAY       AVERAGE DAILY POWER LEVEL (MWe-Net)                                                   (MWe-Net) i j                   1                       824                       17                               828 2                       826                       18                               827 3                       824                       19                               825 4                       830                       20                               827 5                       825                       21                               821 6                       822                       22                               832 7                       818                       23                               832 8                       827                       24                               830 9                       833                       25                               827 10                       832                       26                               832 11                       834                       27                               833 12                       833                       28                               833 13                       833                       29                               831 14                       831                       30                               826 15                       831                       31     _
TELEPHONE (334) 899-5156 ext 3640 4
NA 16                       831 INSTRUCTIONS l
MONTH November l
On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) i j
1 824 17 828 2
826 18 827 3
824 19 825 4
830 20 827 5
825 21 821 6
822 22 832 7
818 23 832 8
827 24 830 9
833 25 827 10 832 26 832 11 834 27 833 12 833 28 833 13 833 29 831 14 831 30 826 15 831 31 NA 16 831 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.


                                                    - ~ . - - - = . .         . - -              - - - .         - - - - -                - - -.     - - ----
... -.... ~. - - -.. =.. - -
  . . . - . . .-. . ~ . - - - . . = . . - -
- ~. - - - =..
l    ''        *
l l
* l l
UNIT SHUTDOWNS AND POWER REDUCTIONS i
UNIT SHUTDOWNS AND POWER REDUCTIONS                                                                           '
l DOCKET NO.
i             .
50-348 UNIT NAME J. M. Farley - Unit 1 l
l DOCKET NO.                   50-348 UNIT NAME             J. M. Farley - Unit 1 l
DATE December 9,1996 i
i DATE             December 9,1996 COMPLETED BY               M. W. McAnulty l                                   REPORT MONTH November                                                 TELEPHONE (334)899-5156, ext.3640 l
COMPLETED BY M. W. McAnulty l
R       M E         E           S T                     A         T           Y                                                                                 l Y                     S         11         SC l                               P                     O         O           TO                                     CAUSE AND CORRECTIVE E   DURATION         N         D           ED       COMPONENT                               ACIlON TO                       I NO.     DATE     (1)     (IlOURS)       (2)       (3)   LER # ME           CODE (5)                   PREVENT RECURRENCE i
REPORT MONTH November TELEPHONE (334)899-5156, ext.3640 l
R M
E E
S T
A T
Y l
Y S
11 SC l
P O
O TO CAUSE AND CORRECTIVE E
DURATION N
D ED COMPONENT ACIlON TO NO.
DATE (1)
(IlOURS)
(2)
(3)
LER #
ME CODE (5)
PREVENT RECURRENCE i
j There were nO Shutdowns Or power reductions during the month.
j There were nO Shutdowns Or power reductions during the month.
I l
I l
l 1
l 1
I                                                                                                                                                              I 4
I 4
l l
l i
l l
l l'
i l
L_._
l' L_._
1:
1:                 2:                                                   3:                                       EVENTS REPORTED F; Forced           Reason                                                 Method                               (NVOLVE A S: Scheduled         A - Equipment Failure (Explain)                     1 Manual                             GREATER TilAN 20%
2:
B Maintenance or Test                               2 - Manual Scram                     REDUCilON IN
3:
;                                C Refueling -                                       3 AutomaticScram                     AVERAGE DAILY l                               D Regulatory Restriction                             4 Other(Explain)                     POWER LEVEL FOR l                               E Operator Training & License Examination                                                 Tile PRECEDING 24
EVENTS REPORTED F; Forced Reason Method (NVOLVE A S: Scheduled A - Equipment Failure (Explain) 1 Manual GREATER TilAN 20%
: i.                               F- Administrative                                                                         llOURS.
B Maintenance or Test 2 - Manual Scram REDUCilON IN C Refueling -
;                                G -Operational Error (Explain) l'                               II-Other (Explain) l r
3 AutomaticScram AVERAGE DAILY l
D Regulatory Restriction 4 Other(Explain)
POWER LEVEL FOR l
E Operator Training & License Examination Tile PRECEDING 24 i.
F-Administrative llOURS.
G -Operational Error (Explain) l' II-Other (Explain) l r
w~
w


;                                                              Joseph M. Farley Nuclear Plant
Joseph M. Farley Nuclear Plant Unit 2 Narrative Summary of Operations November 1996 i
:                                                                              Unit 2 Narrative Summary of Operations November 1996 i
i The eleventh refueling outage continued through the month of November.
i 4
4 The following major safety related maintenance was performed during the month:
The eleventh refueling outage continued through the month of November.
i 8
The following major safety related maintenance was performed during the month:
: 1. The 2A charging pump was disassembled due to an overheated outboard seal.
i                                                                                                                                     l 8
j j-The repairs included replacement of the pump rotating assembly.
: 1. The 2A charging pump was disassembled due to an overheated outboard seal.               j j-                                             The repairs included replacement of the pump rotating assembly.                       '
).
).                                       The following maintenance was associated with outage activities:
The following maintenance was associated with outage activities:
I
I
: 1. The reactor was refueled.
: 1. The reactor was refueled.
Line 122: Line 177:
E
E


              ,                    OPERATING DATA REPORT DOCKET NO.             50-364 DATE     December 9,1996 COMPLETED BY           M. W. McAnulty TELEPHONE     (334) 899-5156, ext.3640 OPERATING _ STATUS
OPERATING DATA REPORT DOCKET NO.
: 1. Unit Name:                       Joseph M. Farley - Unit 2       Notes
50-364 DATE December 9,1996 COMPLETED BY M. W. McAnulty TELEPHONE (334) 899-5156, ext.3640 OPERATING _ STATUS 1.
: 2. Reporting Period:                             November 1996     1) Cumulative data since 07-30-81,
Unit Name:
: 3. Licensed Thermal Power (MWt):                           2,652       date of commercial operation.
Joseph M. Farley - Unit 2 Notes 2.
: 4. Nameplate Rating (Gross MWe):                             860
Reporting Period:
: 5. Design Electrical Rating (Net MWe):                       829                                                 ;
November 1996
: 6. Maximum Dependable Capacity (Gross MWe):                 863.6
: 1) Cumulative data since 07-30-81, 3.
: 7. Maximum Dependable Capacity (Net MWe):                     822 (                                             )
Licensed Thermal Power (MWt):
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Smce Last Report, Give Reasons:                     N/A                                                           i
2,652 date of commercial operation.
: 9. Power Level To Which Restricted, If Any (Net MWe):             N/A
4.
: 10. Reasons For Restrictions,If Any:             N/A This Month         Yr. to Date           Cumulative
Nameplate Rating (Gross MWe):
: 11. Hours in Reporting Period                                 720.0             8,040.0               134,473.0   l
860 5.
: 12. Number Of Hours Reactor Was Critical                         0.0             6,840.9               115,744.3   l
Design Electrical Rating (Net MWe):
: 13. Reactor Reserve Shutdown Hours                               0.0                 0.0                   138.0   l
829 6.
: 14. Hours Generator On-line                                     0.0             6,839.0               114,049.2   l
Maximum Dependable Capacity (Gross MWe):
: 15. Unit Reserve Shutdown Hours                                 0.0                 0.0                     0.0 l
863.6 7.
: 16. Gross Thermal Energy Generated (MWH)                         0.0       17,725,193.8           290,698,984.2
Maximum Dependable Capacity (Net MWe):
: 17. Gross Electrical Energy Generated (MWH)                     0.0       5,806,131.0           95,268,610.0
822
: 18. Net Electrical Energy Generated (MWH)                 (4,474.0) _       5,516,143.0           90,329,794.0     l
(
: 19. Unit Service Factor                                         0.0                 85.1                   84.8
)
: 20. Unit Availability Factor                                     0.0               85.1                     84.8
8.
: 21. Unit Capacity Factor (Using MDC Net)         _
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Smce Last Report, Give Reasons:
N/A                 83.5                     81.9
N/A i
: 22. Unit Capacity Factor (Using DER Net)                       N/A                 82.8                     81.0
9.
: 23. Unit Forced Outage Rate                                     0.0                 0.0                     3.8
Power Level To Which Restricted, If Any (Net MWe):
N/A
: 10. Reasons For Restrictions,If Any:
N/A This Month Yr. to Date Cumulative
: 11. Hours in Reporting Period 720.0 8,040.0 134,473.0
: 12. Number Of Hours Reactor Was Critical 0.0 6,840.9 115,744.3
: 13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
: 14. Hours Generator On-line 0.0 6,839.0 114,049.2
: 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
: 16. Gross Thermal Energy Generated (MWH) 0.0 17,725,193.8 290,698,984.2
: 17. Gross Electrical Energy Generated (MWH) 0.0 5,806,131.0 95,268,610.0
: 18. Net Electrical Energy Generated (MWH)
(4,474.0) _
5,516,143.0 90,329,794.0
: 19. Unit Service Factor 0.0 85.1 84.8
: 20. Unit Availability Factor 0.0 85.1 84.8
: 21. Unit Capacity Factor (Using MDC Net)
N/A 83.5 81.9
: 22. Unit Capacity Factor (Using DER Net)
N/A 82.8 81.0
: 23. Unit Forced Outage Rate 0.0 0.0 3.8
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
: 25. If Shut Down at End Of Report Period, Estimated Date of Startup:       12/12/96
: 25. If Shut Down at End Of Report Period, Estimated Date of Startup:
: 26. Units In Test Status (Prior To Commercial Operation):                 Forecast               Achieved Initial Criticality                               05/06/81               05/08/81 Initial Electricity                               05/24/81               05/25/81 Commercial Operation                               08/01/81               07/30/81
12/12/96
: 26. Units In Test Status (Prior To Commercial Operation):
Forecast Achieved Initial Criticality 05/06/81 05/08/81 Initial Electricity 05/24/81 05/25/81 Commercial Operation 08/01/81 07/30/81


          +   .u..w   ..    . - . . - -m cr_- -ur .-- - a -,e a a-,. n a- _u.--...a-       u-..~..=.n~       -
+
                                                                                                                            , ,. - ..- , _ aa.
.u..w
DOCKET NO.                   50-364 I     -
-m cr_-
UNIT               2
-ur
.1 DATE December 9,1996 COMPLETED BY               M. W. McAnulty TELEPHONE (334) 899-5156 ext 3640 MONTH         November                                                                                                                 !
.-- - a
l DAY     AVERAGE DAILY POWER LEVEL                 DAY         AVERAGE DAILY POWER LEVEL                                           l (MWe-Net)                                                   (MWe-Net)                                     I 1                       0                         17                                       0 2                         0                         18                                       0 3                         0                         19                                       0 4                         0                         20                                       0 5                         0                         21                                       0 6                         0                         22                                       0 7                         0                         23                                       0                                   l 8                         0                         24                                       0 9                         0                         25                                       0 10                         0                         26                                       0 11                         0                         27                                       0 12                         0                         28                                       0 13                         0                         29                                       0 14                         0                         30                                       0 15                         0                         31                               NA 16                         0 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.
-,e a
                                                                                                                                                  .i
a-,.
n a-
_u.--...a-u-..~..=.n~
aa.
DOCKET NO.
50-364 I
UNIT 2
.1 DATE December 9,1996 COMPLETED BY M. W. McAnulty TELEPHONE (334) 899-5156 ext 3640 MONTH November DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 NA 16 0
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.
. i


_. .-.          . . _ .      . _ .          .-        ..          _ - . . ~ . -         -.        . . ~ . . . - _ - - -
_ -.. ~. -
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.                 50-364 UNIT NAME       J. M. Farley - Unit 2 i
.. ~... - _ - - -
DATE         December 9,1996 COMPLETED BY                 M. W. McAnulty REPORTMONTH November                                                         TELEP110NE (334) 899-5156, ext.3640
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
!                                                            R    M j                                                             E     E               S T                     A     T               Y j                                     Y                     S     11               SC                                                                                     ,
50-364 UNIT NAME J. M. Farley - Unit 2 i
i                                    P                      O     O               TO                                         CAUSE AND CORRECTIVE                       I E     DURATION         N     D               ED   COMPONENT                                   ACrlON TO s
DATE December 9,1996 COMPLETED BY M. W. McAnulty REPORTMONTH November TELEP110NE (334) 899-5156, ext.3640 R
NO.           DATE     (1)     (llOURS)       (2)   (3)       LER # ME         CODE (5)                       PREVENT RECURRENCE
M j
!            011         96iblY       S         720~~       C     1         N/A   N/A         N/A         The eleventh ref'ueling Outage continued i                                                                                                             from 961012.
E E
S T
A T
Y j
Y S
11 SC P
O O
TO CAUSE AND CORRECTIVE i
E DURATION N
D ED COMPONENT ACrlON TO NO.
DATE (1)
(llOURS)
(2)
(3)
LER #
ME CODE (5)
PREVENT RECURRENCE s
011 96iblY S
720~~
C 1
N/A N/A N/A The eleventh ref'ueling Outage continued i
from 961012.
d k
d k
i                                                                                                                                                                           j l
i j
A s
l A
i l
s 4
4 1:                     2:                                                   3:                                         EVENTS REPORTED F: Forced                 Reason                                             Method                                 INVOLVE A S: Scheduled               A - Equipment Failure (Explain)                   1 - Manual                             GREATER TIIAN 20*'.                     !
1:
D Maintenance or Test                             2 - Manual Scram                       REDUCTION IN C Refueling                                       3 Automatic Scram                       AVERAGE DAILY D Regulatory Restriction                           4 - Other (Explain)                     POWER LEVEL FOR E - Operator Training & License Examination                                               TIIE PRECEDING 24 F Adtninistrative                                                                         IIOURS.
2:
O - Operational Error (Explain) 11 Other(Explain)}}
3:
EVENTS REPORTED F: Forced Reason Method INVOLVE A S: Scheduled A - Equipment Failure (Explain) 1 - Manual GREATER TIIAN 20*'.
D Maintenance or Test 2 - Manual Scram REDUCTION IN C Refueling 3 Automatic Scram AVERAGE DAILY D Regulatory Restriction 4 - Other (Explain)
POWER LEVEL FOR E - Operator Training & License Examination TIIE PRECEDING 24 F Adtninistrative IIOURS.
O - Operational Error (Explain) 11 Other(Explain)
__}}

Latest revision as of 10:17, 12 December 2024

Monthly Operating Repts for Nov 1996 for Jm Farley Nuclear Plant Units 1 & 2
ML20132C063
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 11/30/1996
From: Mcanulty M, Dennis Morey
SOUTHERN COMPANY SERVICES, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9612180097
Download: ML20132C063 (9)


Text

t Dave Morzy S uther2Nucl:ar Vice President Operating Company i

Farley Project P.O. Box 1295 Birmingham. Alabama 35201 Tel 205.992.5131 I

SOUTHERN December 10, 1996 COMPANY i

Energy to Serve YourWorld' l

Docket Nos.

50-348 50-364 U. S. Nuclect Regulatory Commission ATTN: Document Control Desk Washington, D C 20555 Joseph M. Farley Nuclear Plant Monthly Operating Report i

Ladies and Gentlemen:

'l Attached are the November 1996 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Respectfully submitted, h

W'W Dave Morey RWC:(mor)

Attachments cc:

Mr. S. D. Ebneter, Region II Administrator Mr. J. I. Zimmerman, NRR Project Manager Mr. T. M. Ross, FNP Sr. Resident inspector l

l Ie W 9612180097 961130 PDR ADOCK 05000348 R

PDR 170025

i L

1 d

k Joseph M. Farley Nuclear Plant Unit 1 j

Narrative Summary of Operations i

November 1996 i

4 4

There were no unit shutdowns or major power reductions during the month.

There was no major safety related maintenance perfonned during the month.

i f

5 4

3 4

i 4

E 4

s

'l J

4 4

l i.

I i

4

OPERATING DATA REPORT DOCKET NO.

50-348 DATE December 9,1996 COMPLETED BY M. W. McAnuity TELEPilONE (334) 899-5156, ext.3640 OPERATINGETATUS 1.

Unit Name:

Joseph M. Farley - Unit 1 Notes 2.

Reporting Period:

November 1996

1) Cumulative data since 12-01-77, 3.

Licensed Thermal Power (MWt):

2,652 date of commercial operation.

4.

Nameplate Rating (Gross MWe):

860 5.

Design Electrical Rating (Net MWe):

829 6.

Maximum Dependable Capacity (Gross MWe):

855.7 7.

Maximum Dependable Capacity (Net MWe):

812 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) 8mee Last Report, Give Reasons:

N/A J

9.

Power Level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons For Restrictions,If Any:

N/A This Month Yr. to Date Cumulative

11. Hours in Reporting Period 720.0 8,040.0 166,560.0
12. Number Of Hours. Reactor Was Critical 720.0 8,011.3 134,700.7
13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0
14. Hours Generator On-line 720.0 7,996.0 132,671.7
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1,908,591.4 20,991,545.5 341,745,918.4
17. Gross Electrical Energy Generated (MWH) 627,580.0 6,870,335.0 110,362,489.0
18. Net Electrical Energy Generated (MWH) 596,556.0 6,525,209.0 104,264,861.0
19. Unit Service Factor 100.0 99.5 79.7
20. Unit Availability Factor 100.0 99.5 79.7
21. Unit Capacity Factor (Using MDC Net) 102.0 99.9 77.1
22. Unit Capacity Factor (Using DER Net) 99.9 97.9 75.5
23. Unit Forced Outage Rate 0.0 0.0 5.6
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling Outage scheduled for March 15,1997 with a duration of 49 days.

25. If Shut Down at End Of Report Period, Estimated Date of Startup:

N/A

26. Units In Test Status (Prior To Commercial 7peration)-

Forecast Achieved Initial Criticality 08/06/77 08/09/77 Initial Electricity 08/20/77 08/l8/77 Commercial Operation 12/01/77 12/01/77

DOCKET NO.

50-348 UNIT 1

i DATE December 9,1996 COMPLETED BY M. W. McAnulty 4

TELEPHONE (334) 899-5156 ext 3640 4

MONTH November l

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) i j

1 824 17 828 2

826 18 827 3

824 19 825 4

830 20 827 5

825 21 821 6

822 22 832 7

818 23 832 8

827 24 830 9

833 25 827 10 832 26 832 11 834 27 833 12 833 28 833 13 833 29 831 14 831 30 826 15 831 31 NA 16 831 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.

... -.... ~. - - -.. =.. - -

- ~. - - - =..

l l

UNIT SHUTDOWNS AND POWER REDUCTIONS i

l DOCKET NO.

50-348 UNIT NAME J. M. Farley - Unit 1 l

DATE December 9,1996 i

COMPLETED BY M. W. McAnulty l

REPORT MONTH November TELEPHONE (334)899-5156, ext.3640 l

R M

E E

S T

A T

Y l

Y S

11 SC l

P O

O TO CAUSE AND CORRECTIVE E

DURATION N

D ED COMPONENT ACIlON TO NO.

DATE (1)

(IlOURS)

(2)

(3)

LER #

ME CODE (5)

PREVENT RECURRENCE i

j There were nO Shutdowns Or power reductions during the month.

I l

l 1

I 4

l i

l l'

L_._

1:

2:

3:

EVENTS REPORTED F; Forced Reason Method (NVOLVE A S: Scheduled A - Equipment Failure (Explain) 1 Manual GREATER TilAN 20%

B Maintenance or Test 2 - Manual Scram REDUCilON IN C Refueling -

3 AutomaticScram AVERAGE DAILY l

D Regulatory Restriction 4 Other(Explain)

POWER LEVEL FOR l

E Operator Training & License Examination Tile PRECEDING 24 i.

F-Administrative llOURS.

G -Operational Error (Explain) l' II-Other (Explain) l r

w~

w

Joseph M. Farley Nuclear Plant Unit 2 Narrative Summary of Operations November 1996 i

i The eleventh refueling outage continued through the month of November.

4 The following major safety related maintenance was performed during the month:

i 8

1. The 2A charging pump was disassembled due to an overheated outboard seal.

j j-The repairs included replacement of the pump rotating assembly.

).

The following maintenance was associated with outage activities:

I

1. The reactor was refueled.
2. The 10 year inspection of the 2C reactor coolant pump motor was completed.
3. Steam Generator test and inspection activities continued.

I a

E

OPERATING DATA REPORT DOCKET NO.

50-364 DATE December 9,1996 COMPLETED BY M. W. McAnulty TELEPHONE (334) 899-5156, ext.3640 OPERATING _ STATUS 1.

Unit Name:

Joseph M. Farley - Unit 2 Notes 2.

Reporting Period:

November 1996

1) Cumulative data since 07-30-81, 3.

Licensed Thermal Power (MWt):

2,652 date of commercial operation.

4.

Nameplate Rating (Gross MWe):

860 5.

Design Electrical Rating (Net MWe):

829 6.

Maximum Dependable Capacity (Gross MWe):

863.6 7.

Maximum Dependable Capacity (Net MWe):

822

(

)

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Smce Last Report, Give Reasons:

N/A i

9.

Power Level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons For Restrictions,If Any:

N/A This Month Yr. to Date Cumulative

11. Hours in Reporting Period 720.0 8,040.0 134,473.0
12. Number Of Hours Reactor Was Critical 0.0 6,840.9 115,744.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
14. Hours Generator On-line 0.0 6,839.0 114,049.2
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 0.0 17,725,193.8 290,698,984.2
17. Gross Electrical Energy Generated (MWH) 0.0 5,806,131.0 95,268,610.0
18. Net Electrical Energy Generated (MWH)

(4,474.0) _

5,516,143.0 90,329,794.0

19. Unit Service Factor 0.0 85.1 84.8
20. Unit Availability Factor 0.0 85.1 84.8
21. Unit Capacity Factor (Using MDC Net)

N/A 83.5 81.9

22. Unit Capacity Factor (Using DER Net)

N/A 82.8 81.0

23. Unit Forced Outage Rate 0.0 0.0 3.8
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. If Shut Down at End Of Report Period, Estimated Date of Startup:

12/12/96

26. Units In Test Status (Prior To Commercial Operation):

Forecast Achieved Initial Criticality 05/06/81 05/08/81 Initial Electricity 05/24/81 05/25/81 Commercial Operation 08/01/81 07/30/81

+

.u..w

-m cr_-

-ur

.-- - a

-,e a

a-,.

n a-

_u.--...a-u-..~..=.n~

aa.

DOCKET NO.

50-364 I

UNIT 2

.1 DATE December 9,1996 COMPLETED BY M. W. McAnulty TELEPHONE (334) 899-5156 ext 3640 MONTH November DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

17 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

14 0

30 0

15 0

31 NA 16 0

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.

. i

_ -.. ~. -

.. ~... - _ - - -

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-364 UNIT NAME J. M. Farley - Unit 2 i

DATE December 9,1996 COMPLETED BY M. W. McAnulty REPORTMONTH November TELEP110NE (334) 899-5156, ext.3640 R

M j

E E

S T

A T

Y j

Y S

11 SC P

O O

TO CAUSE AND CORRECTIVE i

E DURATION N

D ED COMPONENT ACrlON TO NO.

DATE (1)

(llOURS)

(2)

(3)

LER #

ME CODE (5)

PREVENT RECURRENCE s

011 96iblY S

720~~

C 1

N/A N/A N/A The eleventh ref'ueling Outage continued i

from 961012.

d k

i j

l A

s 4

1:

2:

3:

EVENTS REPORTED F: Forced Reason Method INVOLVE A S: Scheduled A - Equipment Failure (Explain) 1 - Manual GREATER TIIAN 20*'.

D Maintenance or Test 2 - Manual Scram REDUCTION IN C Refueling 3 Automatic Scram AVERAGE DAILY D Regulatory Restriction 4 - Other (Explain)

POWER LEVEL FOR E - Operator Training & License Examination TIIE PRECEDING 24 F Adtninistrative IIOURS.

O - Operational Error (Explain) 11 Other(Explain)

__