JUL 16 685 | |||
Docket No. 50-409 | |||
Dairyland Power Cooperative | |||
-ATTN: | |||
Mr. F. W. Linder | |||
General Manager | |||
2615 East Avenue - South | |||
La Crosse, WI 54601 | |||
Gentlemen: | |||
This refers to the routine safety inspection conducted by Mr. W. Snell and | |||
others of this office on June 24-26, 1985 of activities at the La Crosse Boiling | |||
Water Reactor authorized by NRC Operating Licenses No. DPR-45 and to the | |||
discussion of our findings with Messrs. J. Parkyn, T. Steele and others of | |||
your staff at the conclusion of the inspection. | |||
The enclosed copy of our inspection report identifies areas examined during | |||
the inspection. Within these areas, the inspection consisted of a selective- | |||
examination of procedures and representative records, observations, and | |||
interviews with personnel. | |||
No items of noncompliance with NRC requirements were identified during the | |||
course of this inspection. | |||
However, weaknesses were identified which will need corrective action by your | |||
staff. | |||
These weaknesses are summarized in the attached Appendix to this | |||
letter. | |||
As required by 10 CFR Part 50, Appendix E, IV.F, any weaknesses that | |||
are identified must be corrected. | |||
We will gladly discuss any questions you have concerning this inspection. | |||
Sincerely, | |||
-/22;29~+ | |||
C. J. Paperiello, Chief | |||
Emergency Preparedness and | |||
Radiological Protection Branch | |||
Enclosures: | |||
1. | |||
Appendix, Exercise | |||
/ | |||
Weaknesses | |||
2. | |||
Inspection Report | |||
/[ | |||
No. 50-409/85008(DRSS) | |||
h | |||
See Attached List For Distribution | |||
8508020008 850716 | |||
PDR | |||
ADOCK 05000409 | |||
G | |||
PDR | |||
_ | |||
o , | o | ||
, | |||
Dairyland Power Cooperative | |||
2 | |||
JUL 1 61985 | |||
Distribution | |||
cc w/ enclosures: | |||
J. Parkyn, Plant Superintendent | |||
DMB/ Document Control Desk (RIDS) | |||
Resident Inspector, RIII | |||
John J. Duffy, Chief | |||
Boiler Section | |||
Ness Flores, Chairperson | |||
Wisconsin Public Service | |||
Cosaission | |||
Spark Burmaster, Coulee | |||
Region Energy Coalition | |||
W. Weaver, FEMA, Region V | |||
D. Matthews, EPB, OIE | |||
NIII | |||
RIII | |||
RIIIj | |||
R | |||
[ | |||
M1/,g | |||
M1Cen | |||
Shi | |||
1,s | |||
Be d | |||
1 | |||
les1. | |||
07/11/85 | |||
.-_ _ | |||
_ _ _ | |||
. - - | |||
' | |||
. | |||
APPENDIX | |||
EXERCISE WEAKNESSES | |||
1. | |||
Initial notifications to the offsite agencies for the Alert and Site | |||
Area Emergency classifications took longer than the 15 minutes specified | |||
in 10 CFR Part 50, Appendix E, IV.D.3. | |||
(0 pen Item No. 409/85008-01) | |||
(Section 4.a) | |||
2. | |||
The content of the initial notification to the offsite agencies for the | |||
Site Area Emergency did not state whether a release was in progress as | |||
required by the LACBWR Emergency Plan. | |||
(0 pen Item No. 409/85008-02) | |||
(Section 4.a) | |||
l | l | ||
l | l | ||
}} | }} | ||
Latest revision as of 09:47, 12 December 2024
| ML20132E511 | |
| Person / Time | |
|---|---|
| Site: | La Crosse File:Dairyland Power Cooperative icon.png |
| Issue date: | 07/16/1985 |
| From: | Paperiello C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Linder F DAIRYLAND POWER COOPERATIVE |
| Shared Package | |
| ML20132E515 | List: |
| References | |
| NUDOCS 8508020008 | |
| Download: ML20132E511 (3) | |
See also: IR 05000409/1985008
Text
..
,
JUL 16 685
Docket No. 50-409
Dairyland Power Cooperative
-ATTN:
Mr. F. W. Linder
General Manager
2615 East Avenue - South
La Crosse, WI 54601
Gentlemen:
This refers to the routine safety inspection conducted by Mr. W. Snell and
others of this office on June 24-26, 1985 of activities at the La Crosse Boiling
Water Reactor authorized by NRC Operating Licenses No. DPR-45 and to the
discussion of our findings with Messrs. J. Parkyn, T. Steele and others of
your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective-
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
However, weaknesses were identified which will need corrective action by your
staff.
These weaknesses are summarized in the attached Appendix to this
letter.
As required by 10 CFR Part 50, Appendix E, IV.F, any weaknesses that
are identified must be corrected.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
-/22;29~+
C. J. Paperiello, Chief
Radiological Protection Branch
Enclosures:
1.
Appendix, Exercise
/
Weaknesses
2.
Inspection Report
/[
No. 50-409/85008(DRSS)
h
See Attached List For Distribution
8508020008 850716
ADOCK 05000409
G
_
o
,
Dairyland Power Cooperative
2
JUL 1 61985
Distribution
cc w/ enclosures:
J. Parkyn, Plant Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
John J. Duffy, Chief
Boiler Section
Ness Flores, Chairperson
Wisconsin Public Service
Cosaission
Spark Burmaster, Coulee
Region Energy Coalition
W. Weaver, FEMA, Region V
D. Matthews, EPB, OIE
NIII
RIII
RIIIj
R
[
M1/,g
M1Cen
Shi
1,s
Be d
1
les1.
07/11/85
.-_ _
_ _ _
. - -
'
.
APPENDIX
EXERCISE WEAKNESSES
1.
Initial notifications to the offsite agencies for the Alert and Site
Area Emergency classifications took longer than the 15 minutes specified
in 10 CFR Part 50, Appendix E, IV.D.3.
(0 pen Item No. 409/85008-01)
(Section 4.a)
2.
The content of the initial notification to the offsite agencies for the
Site Area Emergency did not state whether a release was in progress as
required by the LACBWR Emergency Plan.
(0 pen Item No. 409/85008-02)