ML20132H076: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:\
{{#Wiki_filter:\\
.i .
.i
                                      'JUL 3 01985
.
      Docket No. 50-346
'JUL 3 01985
      Toledo Edison Company
Docket No. 50-346
      ATTN:   Mr. Richard P. Crouse
Toledo Edison Company
              Vice President
ATTN:
              Nuclear
Mr. Richard P. Crouse
      Edison Plaza
Vice President
      300 Madison Avenue
Nuclear
      Toledo, OH 43652
Edison Plaza
      Gentlemen:
300 Madison Avenue
      This refers to the special safety inspection conducted by Mr. T. Ploski of
Toledo, OH 43652
      this office during the period June 24 through July 3, 1985, of activities
Gentlemen:
      at Davis-Besse Nuclear Power Station, Unit 1, authorized by NRC Operating
This refers to the special safety inspection conducted by Mr. T. Ploski of
      License No. NPF-3 and to the discussion of our findings with Mr. T. Murray
this office during the period June 24 through July 3, 1985, of activities
  , and others of your staff at the conclusion of the inspection.
at Davis-Besse Nuclear Power Station, Unit 1, authorized by NRC Operating
      The enclosed copy of our inspection report identifies areas examined during
License No. NPF-3 and to the discussion of our findings with Mr. T. Murray
      the inspection. Within these areas, the inspection consisted of a selective
, and others of your staff at the conclusion of the inspection.
      examination of procedures and representative records, observations, and
The enclosed copy of our inspection report identifies areas examined during
      interviews with personnel.
the inspection. Within these areas, the inspection consisted of a selective
      During this inspection, certain of your activities appeared to be in violatino
examination of procedures and representative records, observations, and
      with NRC requirements, as described in the enclosed Appendix.     The inspection
interviews with personnel.
      showed that action had been taken to correct the identified violation and to
During this inspection, certain of your activities appeared to be in violatino
      prevent recurrence.   Consequently, no reply to this violation is required and
with NRC requirements, as described in the enclosed Appendix.
      we have no further questions regarding this matter at this time.
The inspection
      In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
showed that action had been taken to correct the identified violation and to
      this letter and the enclosed inspection report will be placed in the NRC's
prevent recurrence.
      Public Document Room.
Consequently, no reply to this violation is required and
                                                                        /
we have no further questions regarding this matter at this time.
                                                              J'
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
                                                                                il,
this letter and the enclosed inspection report will be placed in the NRC's
    VAWR8
Public Document Room.
/
J'
il,
VAWR8


                                                                                            .
.
  . .
.
      Toledo Edison Company                           2
.
                                                            rJUL 3 01985
Toledo Edison Company
2
rJUL 3 01985
,
,
      We will gladly discuss any questions you have concerning this inspection.
We will gladly discuss any questions you have concerning this inspection.
                                                      Sincerely,
Sincerely,
5/
W. D. Shafer, Chief
"
"
                                                          5/
Emergency Preparedness and
                                                      W. D. Shafer, Chief
Radiological Protection Branch
                                                      Emergency Preparedness and
Enclosures:
                                                          Radiological Protection Branch
1.
      Enclosures:
Appendix, Notice
      1. Appendix, Notice
of Violation
            of Violation
2.
      2.   Inspection Report
Inspection Report
            No. 50-346/85023(DRSS)
No. 50-346/85023(DRSS)
      cc w/ enclosures:
cc w/ enclosures:
      S. Quennoz, Plant Manager
S. Quennoz, Plant Manager
      DMB/ Document Control Desk (RIDS)
DMB/ Document Control Desk (RIDS)
      Resident Inspector, RIII'
Resident Inspector, RIII'
      Harold W. Kohn, Ohio EPA
Harold W. Kohn, Ohio EPA
      James W. Harris, State of Ohio
James W. Harris, State of Ohio
      Robert H. Quillin, Ohio
Robert H. Quillin, Ohio
                .
.
        Department of Health
Department of Health
      D. Matthews, EPB, OIE
D. Matthews, EPB, OIE
      E. Rossi, EAB, OIE
E. Rossi, EAB, OIE
      W. Weaver, FEMA, RV
W. Weaver, FEMA, RV
      R I                     I                           I               R
R I
      Ploski/jp                   ips                   Tac     *
I
                                                                                  er
I
      07/25/85                                           /
R
Ploski/jp
ips
Tac
er
*
07/25/85
/
l
l
                  .-   -
.-
                            .   . . . _ _ _ . - - _ .       ..       ..           _ - - - . -
-
.
. . . _ _ _ . - - _ .
..
..
_ -
- - .
-
}}
}}

Latest revision as of 09:21, 12 December 2024

Forwards Safety Insp Rept 50-346/85-23 on 850624-0703 & Notice of Violation
ML20132H076
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/30/1985
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Crouse R
TOLEDO EDISON CO.
Shared Package
ML20132H078 List:
References
NUDOCS 8508050240
Download: ML20132H076 (2)


See also: IR 05000346/1985023

Text

\\

.i

.

'JUL 3 01985

Docket No. 50-346

Toledo Edison Company

ATTN:

Mr. Richard P. Crouse

Vice President

Nuclear

Edison Plaza

300 Madison Avenue

Toledo, OH 43652

Gentlemen:

This refers to the special safety inspection conducted by Mr. T. Ploski of

this office during the period June 24 through July 3, 1985, of activities

at Davis-Besse Nuclear Power Station, Unit 1, authorized by NRC Operating

License No. NPF-3 and to the discussion of our findings with Mr. T. Murray

, and others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in violatino

with NRC requirements, as described in the enclosed Appendix.

The inspection

showed that action had been taken to correct the identified violation and to

prevent recurrence.

Consequently, no reply to this violation is required and

we have no further questions regarding this matter at this time.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

/

J'

il,

VAWR8

.

.

.

Toledo Edison Company

2

rJUL 3 01985

,

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

5/

W. D. Shafer, Chief

"

Emergency Preparedness and

Radiological Protection Branch

Enclosures:

1.

Appendix, Notice

of Violation

2.

Inspection Report

No. 50-346/85023(DRSS)

cc w/ enclosures:

S. Quennoz, Plant Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII'

Harold W. Kohn, Ohio EPA

James W. Harris, State of Ohio

Robert H. Quillin, Ohio

.

Department of Health

D. Matthews, EPB, OIE

E. Rossi, EAB, OIE

W. Weaver, FEMA, RV

R I

I

I

R

Ploski/jp

ips

Tac

er

07/25/85

/

l

.-

-

.

. . . _ _ _ . - - _ .

..

..

_ -

- - .

-