ENS 47241: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 09/05/2011 04:03 EDT | | event date = 09/05/2011 04:03 EDT | ||
| last update date = 09/05/2011 | | last update date = 09/05/2011 | ||
| title = Loss | | title = Loss of Meterological Tower Vertical Temperature Difference Instrumentation Due to Lightning Strike | ||
| event text = On 9/5/11 at 0403 EDT, Vermont Yankee Nuclear Power Station experienced a lightning strike which resulted in a loss of all vertical temperature difference instrumentation. | | event text = On 9/5/11 at 0403 EDT, Vermont Yankee Nuclear Power Station experienced a lightning strike which resulted in a loss of all vertical temperature difference instrumentation. | ||
This condition is being reported as a loss of emergency assessment capability in accordance with 10CFR50.72(b)(3)(xiii) | This condition is being reported as a loss of emergency assessment capability in accordance with 10CFR50.72(b)(3)(xiii) |
Latest revision as of 21:06, 1 March 2018
Where | |
---|---|
Vermont Yankee File:NorthStar Vermont Yankee icon.png Vermont (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness | |
Time - Person (Reporting Time:+1.62 h0.0675 days <br />0.00964 weeks <br />0.00222 months <br />) | |
Opened: | James Kritzer 09:40 Sep 5, 2011 |
NRC Officer: | Donald Norwood |
Last Updated: | Sep 5, 2011 |
47241 - NRC Website
| |