ENS 47241: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 09/05/2011 04:03 EDT
| event date = 09/05/2011 04:03 EDT
| last update date = 09/05/2011
| last update date = 09/05/2011
| title = Loss Of Meterological Tower Vertical Temperature Difference Instrumentation Due To Lightning Strike
| title = Loss of Meterological Tower Vertical Temperature Difference Instrumentation Due to Lightning Strike
| event text = On 9/5/11 at 0403 EDT, Vermont Yankee Nuclear Power Station experienced a lightning strike which resulted in a loss of all vertical temperature difference instrumentation.  
| event text = On 9/5/11 at 0403 EDT, Vermont Yankee Nuclear Power Station experienced a lightning strike which resulted in a loss of all vertical temperature difference instrumentation.  
This condition is being reported as a loss of emergency assessment capability in accordance with 10CFR50.72(b)(3)(xiii)
This condition is being reported as a loss of emergency assessment capability in accordance with 10CFR50.72(b)(3)(xiii)

Latest revision as of 21:06, 1 March 2018

ENS 47241 +/-
Where
Vermont Yankee File:NorthStar Vermont Yankee icon.png
Vermont (NRC Region 1)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+1.62 h0.0675 days <br />0.00964 weeks <br />0.00222 months <br />)
Opened: James Kritzer
09:40 Sep 5, 2011
NRC Officer: Donald Norwood
Last Updated: Sep 5, 2011
47241 - NRC Website
Loading map...