ML20133C863: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:p* **% | {{#Wiki_filter:p* **% | ||
s k | |||
[ | UNITED STATES z) I' s v | ||
O | [ | ||
p, NUCLEAR REGULATORY COMMISSION g | |||
O | |||
-l WASHINGTON, D. C. 20555 g | |||
g | g | ||
%,..... /, | |||
v NAY 8 8 12 5 | |||
Ms. Michele Varricchio Mr. Thomas Devine Government Accountability Project 1555 Connecticut Avenue, NW, Suite 202 | } | ||
Ms. Michele Varricchio Mr. Thomas Devine Government Accountability Project 1555 Connecticut Avenue, NW, Suite 202 IN RESPONSE REFER Washington, DC 20036 TO F0IA-85-101 | |||
==Dear Ms. Varricchio and Mr. Devine:== | ==Dear Ms. Varricchio and Mr. Devine:== | ||
This is a second partial response to your {{letter dated|date=February 6, 1985|text=letter dated February 6, 1985}}, in which you requested, pursuant to the Freedom of Infomation Act (F0IA), six categories of documents regarding the Wolf Creek Generating Station STN-50-482. | This is a second partial response to your {{letter dated|date=February 6, 1985|text=letter dated February 6, 1985}}, in which you requested, pursuant to the Freedom of Infomation Act (F0IA), six categories of documents regarding the Wolf Creek Generating Station STN-50-482. | ||
The documents listed on the enclosed Appendix D are responsive to your request and are being placed in the NRC Public Document Room (PDR), 1717 H Street, NW, Washington, DC 20555. You may obtain access to these records by presenting a copy of this letter to the PDR staff or by requesting folder F01A-85-101 under your name. | The documents listed on the enclosed Appendix D are responsive to your request and are being placed in the NRC Public Document Room (PDR), 1717 H Street, NW, Washington, DC 20555. You may obtain access to these records by presenting a copy of this letter to the PDR staff or by requesting folder F01A-85-101 under your name. | ||
The documents listed on the enclosed Appendix E are also responsive to your | The documents listed on the enclosed Appendix E are also responsive to your Public Document Room (y available in the Nuclear Regulatory Comission's (NRC) request and are alread PDR), 1717 H Street, NW, Washington, DC 20555. The file location is noted next to the description of each document. | ||
In response to category one of your request regarding the 1983 Institute of Nuclear Power Operations Report (INP0), we have been informed by the NRC staff that the NRC does not have a copy of the report. The licensee's copy of the INP0 report was reviewed on site by the NRC staff. | In response to category one of your request regarding the 1983 Institute of Nuclear Power Operations Report (INP0), we have been informed by the NRC staff that the NRC does not have a copy of the report. The licensee's copy of the INP0 report was reviewed on site by the NRC staff. | ||
In addition, records have been referred to the Department of Labor for disclo-sure detemination and direct response to you. | In addition, records have been referred to the Department of Labor for disclo-sure detemination and direct response to you. | ||
The staff is continuing to search for additional documents. We will notify you upon completion of the search. | The staff is continuing to search for additional documents. We will notify you upon completion of the search. | ||
Sincerely, | Sincerely, | ||
/g s M-M g | |||
J. M. Felton, Director Division of Rules and Records Office of Administration i | |||
==Enclosures:== | ==Enclosures:== | ||
As stated | As stated i | ||
8507220026 850528 PDR FOIA VARRICC85-101 PDR | |||
8507220026 850528 PDR | ] | ||
.o Re: F01A-85-101 (Second Response) | .o Re: F01A-85-101 (Second Response) | ||
APPENDIX E Documents Already Available in the PDR | APPENDIX E Documents Already Available in the PDR 1. | ||
10/24/84 Document from R.P. Denise, RIV: NRC, to G.L. Koester Kansas Gas & Electric re: NRC Inspection Report 50-482/84-18, Accession No. 8503250489 2. | |||
10/26/84 Document from L. Martin, NRC: RIV re: Notice of Significant Licensee Meeting (1 page) Docket 50 482, RIV, Arlington, TX, Accession 8411020253 3. | |||
11/16/84 Document from Robert D. Martin to KG&E, re: Confirmatory Action Letter (3 pages) Accession No. 8411290633 4. | |||
11/21/84 Document from Robert D. Martin, NRC: RIV, to KG&E re: Notice of Violation and Proposed Imposition of Civil Penalty EA 84-107 (7 pages) Accession No. 8411260360 5. | |||
12/21/84 Document from G.L. Koester, KG&E to R.C. DeYoung, Dir., I AE: | |||
NRC re: Letter, | NRC re: Letter, | ||
==Subject:== | ==Subject:== | ||
Enforcement Action 84-107 (5 pages) | Enforcement Action 84-107 (5 pages) | ||
Accession No. 8412310121 | Accession No. 8412310121 6. | ||
12/31/84 Document from G.L. Koester to R.C. DeYoung KG&E Pesponse letter to EA 84-107 (1 page) Accession No. 8501090184 7. | |||
12/31/84 Document from G.L. Koester to R.C. DeYoung, KG&E response letter to EA 84-107 (1 page), w/ enclosures, Violation assessed Civil Penalty, (3 pages) Dath of Affiliation (1 page) | |||
Accession No. 8501090184 | Accession No. 8501090184 8. | ||
01/21/85 Docunent from G.L. Koester to R.C. DeYoung, KGAE Supplemental response to EA 84-107. Accession No. 8501280421 9. | |||
02/15/85 Document from G.L. Koester to R.P. Denise NPC;RIV, Letter, Sub,iect: " Supplemental Information Concerning Structural Steel Welding" (2 pages) w/ attachments, " Criticality Review of Inaccessible Welds" (1 page) Accession No. 8503150003 | |||
: 10. 03/04/85 Document from G.L. Koester to R.P. Denise, Letter, Sub.iect: | : 10. 03/04/85 Document from G.L. Koester to R.P. Denise, Letter, Sub.iect: | ||
" Supplemental Info Concerning Structural Steel Welding" (1 page) w/att., " Reinspection Status of Structural Steel Connections Previously Reported as Inaccessible But Not Embedded in Concrete" (1 page) Accession No. 8503150003 | |||
Re: F0lA-85-101 (Second Response) | Re: F0lA-85-101 (Second Response) | ||
APPENDIX D Documents 8eing Placed in PDR | APPENDIX D Documents 8eing Placed in PDR 1. | ||
Undated Management Plan Overview (3 pages) 2. | |||
03/26/85 Meeting Sununary Distribution (36 pages) 3. | |||
03/18/85 Meeting Summary Distribution (25 pages) 4. | |||
02/27/85 Structural Steel Welding Presentation, Kansas Gas and Electric Company, Wolf Creek Generating Station (44 pages) 5. | |||
12/27/84 Interoffice Coorespondence to R. M. Grant from G. L. Fouts, subject: Wolf Creek Generating Station Correction Action Request No. 19 Final Report (341 pages) 6. | |||
11/28/84 Agenda for Meeting (KG&E and Region IV, NRC (19 pages) 7. | |||
10/29/84 Letter to Mr. Robert D. Martin, NRC from Glen L. Koester, KG&E subject: Interim 10 CFR 50.55(e) Report-Inspection of Welds (2 pages) 8. | |||
,10/29/84 Agenda: NRC/KG&E Region IV Headquarters, Arlington, TX (1page) 9. | |||
10/29/84 Enforcement Conference - Attendance List KG&E (1 page) 10. | |||
10/26/84 Interoffice Correspondence to R. M. Grant from G. L. Fouts subject: Wolf Creek Generating Station Management Plan for KG&E Corrective Action Request 19-Resolution (2 pages) 11. | |||
10/26/84 Kansas Electric Gas & Electric, subject: Management Plan (15 pages) w/following attachments: | |||
a) 10/26/84 KG&E Logic Chart for Resolution CAR 19 (4 xerox pages) b) 10/26/84 KG&E CAR 19 Correction Action Schedule (4 xerox pages) | a) 10/26/84 KG&E Logic Chart for Resolution CAR 19 (4 xerox pages) b) 10/26/84 KG&E CAR 19 Correction Action Schedule (4 xerox pages) 12. | ||
10/17/84 Interoffice Correspondence to G. L. Fouts from R. M. Grant, | |||
==Subject:== | ==Subject:== | ||
Corrective Action Request (CAR) No. 19 (12 pages) v | Corrective Action Request (CAR) No. 19 (12 pages) v T | ||
? | |||
e GOVERNMENT ACCOUNTABluTY PROKCT 1555 Comecncut Awmue, N.W., Suite 202 Washington. D.C. 20036 | e GOVERNMENT ACCOUNTABluTY PROKCT 1555 Comecncut Awmue, N.W., Suite 202 1 | ||
Washington, D.C. | Washington. D.C. 20036 (202)232-8550 s | ||
February 6, 1985 gp or )NFORMATON Director Office of Administration gp1 Nuclear Regulatory Commission | |||
" \\ (> | |||
f0M' Washington, D.C. | |||
205S5 To Whom It May Concern: | |||
$44 Pursuant to the Freedom of Information Act (FOIA), 5 U.S.C. | |||
E552, the Government Accountability Project (GAP) recuests copies of any and al] agency records and information, including but not limitec to notes, inter-office memoranda, letters, memoranda, drafts, minutes, diaries, logs, calendars, tapes, transcripts, summaries, interview reports, procedures instructions, engineering analyses, drawings, files, graphs, maps, photographs, agreements, handwritten notes, studies, data sheets, notebooks, telephone messages, books, computations, voice recordings, computer run-offs, representative records, interim and/or final reports, status reports, and any and all other records relevant to and/or generated in connection with the Wolf Creek Generating Station STN-50-4E2 in the following areas: | E552, the Government Accountability Project (GAP) recuests copies of any and al] agency records and information, including but not limitec to notes, inter-office memoranda, letters, memoranda, drafts, minutes, diaries, logs, calendars, tapes, transcripts, summaries, interview reports, procedures instructions, engineering analyses, drawings, files, graphs, maps, photographs, agreements, handwritten notes, studies, data sheets, notebooks, telephone messages, books, computations, voice recordings, computer run-offs, representative records, interim and/or final reports, status reports, and any and all other records relevant to and/or generated in connection with the Wolf Creek Generating Station STN-50-4E2 in the following areas: | ||
Institute of Nuclear Power Operations 1983 (INPO) Report cr U; f C: c te . | Institute of Nuclear Power Operations 1983 (INPO) Report cr U; f C: c te. | ||
En r reptr,rcferred tc i: cr. October 9, | |||
_ _ g L . . c :.; cc: ' c te ; d riz.; c;r.r.racilen a | 19E4 lettc f rt: Enrrel G. E i s e r.h u t, Director of the Office of Nuclear Reactor Regulation, tc Michele Varricchio of the Government Acccuntability Project, was received on the Wolf Creek site by NRC Cffice of Inspectior ar.d Enforcement and NRC Regior I'J representEtiver, | ||
cf th. <:1. | .t_ _ _ g L.. c :.; cc: ' c te ; d riz.; c;r.r.racilen a | ||
. ; c e ". s i r : | |||
cf th. | |||
<:1. Creci Sc:.cr c.ing S ta tion by thc ':hC C,f fice c f I nve s ti ga tior.s, | |||
NRC meeting of January 15, 1985 with Kansas Gas and Electric to discuss the operational readiness of Wolf Creek and a February 6, 1985 meeting held for the same purpose, NRC meeting held in Bethesda Maryland on November 28, 1984 to discuss the status of completion and future schedule for licensing of Wolf Creek, l | NRC meeting of January 15, 1985 with Kansas Gas and Electric to discuss the operational readiness of Wolf Creek and a February 6, 1985 meeting held for the same purpose, NRC meeting held in Bethesda Maryland on November 28, 1984 to discuss the status of completion and future schedule for licensing of Wolf Creek, l | ||
9 | 9 | ||
/ | |||
/ | |||
a Director | a Director Page two Office of Administration February 6, 1985 NRC investigations and inspections regarding the allegations of James Wells, employee at Wolf Creek. | ||
NRC Region IV meeting October 29, 1984, Enforcement Conference. | NRC Region IV meeting October 29, 1984, Enforcement Conference. | ||
If any records as defined in 10 CFR 59.3(b) and the NRC | If any records as defined in 10 CFR 59.3(b) and the NRC | ||
. Manual, supra, and covered by this request have been destroyed and/or removed after this request, please provide all records which.have been or are destroyed and/or removed, a description of the action (s) taken relevant to, generated in connection with, and/or issued in order to implement the action (s). | |||
GAP requests that fees be waived, because providing the requested | GAP requests that fees be waived, because providing the requested information "can be considered as primarily benefitting the general'public," 5 U.S.C. 552 (a) (4) (A). | ||
552 (a) (4) (A) . GAP is a non-profit, non-particcn public interest organization concerned with honest and open government. Through legal representation, advice, national >ccnferences, films, publications, and public outreach, GAP promoteg w,histle-blowers as agents of governmental accountability. | GAP is a non-profit, non-particcn public interest organization concerned with honest and open government. | ||
Through legal representation, advice, national >ccnferences, films, publications, and public outreach, GAP promoteg w,histle-blowers as agents of governmental accountability. | |||
GAP is currently working with citizens groups in the 1:ansas area concerning the Wolf Creek Generating Station. | GAP is currently working with citizens groups in the 1:ansas area concerning the Wolf Creek Generating Station. | ||
For any documents or portions of documents that you deny access to, please provide an index, as required b3 Vauchn v. Rcsen, 484 F.2d E20 (D.C .Cir . 19 73) , cert. denied, 415 U.S. 977 (1977), | For any documents or portions of documents that you deny access to, please provide an index, as required b3 Vauchn v. Rcsen, 484 F.2d E20 (D.C.Cir. 19 73), cert. denied, 415 U.S. | ||
itemizing and describing the documents or portions of doeur.ents wi | 977 (1977), | ||
itemizing and describing the documents or portions of doeur.ents wi thhcli,g ar.C p rovi ding a dc tcilti justificati:- cf 3 en g:c u: : | |||
for c1Litir.: caer excr.pticr. | for c1Litir.: caer excr.pticr. | ||
Tbir? you for your prerpt response to this requcst. We look f erward to such a response within ter. days. | Tbir? you for your prerpt response to this requcst. | ||
We look f erward to such a response within ter. days. | |||
i:::dre; I'. | =\\ | ||
i:::dre; I'. | |||
jNichele Varricchio Law Clerk | < '. : s.. '. e. | ||
o- | t jNichele Varricchio Law Clerk o-un, | ||
un, | .ns. | ||
Thomas Devine Legal Director i | Thomas Devine Legal Director i | ||
d I | d I | ||
1 | d O | ||
1 l' | |||
_-___s}} | _-___s}} | ||
Latest revision as of 08:53, 12 December 2024
| ML20133C863 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 05/28/1985 |
| From: | Felton J NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Devine T, Varricchio M GOVERNMENT ACCOUNTABILITY PROJECT |
| Shared Package | |
| ML20133C868 | List: |
| References | |
| FOIA-85-101 NUDOCS 8507220026 | |
| Download: ML20133C863 (3) | |
Text
p* **%
s k
UNITED STATES z) I' s v
[
p, NUCLEAR REGULATORY COMMISSION g
O
-l WASHINGTON, D. C. 20555 g
g
%,..... /,
v NAY 8 8 12 5
}
Ms. Michele Varricchio Mr. Thomas Devine Government Accountability Project 1555 Connecticut Avenue, NW, Suite 202 IN RESPONSE REFER Washington, DC 20036 TO F0IA-85-101
Dear Ms. Varricchio and Mr. Devine:
This is a second partial response to your letter dated February 6, 1985, in which you requested, pursuant to the Freedom of Infomation Act (F0IA), six categories of documents regarding the Wolf Creek Generating Station STN-50-482.
The documents listed on the enclosed Appendix D are responsive to your request and are being placed in the NRC Public Document Room (PDR), 1717 H Street, NW, Washington, DC 20555. You may obtain access to these records by presenting a copy of this letter to the PDR staff or by requesting folder F01A-85-101 under your name.
The documents listed on the enclosed Appendix E are also responsive to your Public Document Room (y available in the Nuclear Regulatory Comission's (NRC) request and are alread PDR), 1717 H Street, NW, Washington, DC 20555. The file location is noted next to the description of each document.
In response to category one of your request regarding the 1983 Institute of Nuclear Power Operations Report (INP0), we have been informed by the NRC staff that the NRC does not have a copy of the report. The licensee's copy of the INP0 report was reviewed on site by the NRC staff.
In addition, records have been referred to the Department of Labor for disclo-sure detemination and direct response to you.
The staff is continuing to search for additional documents. We will notify you upon completion of the search.
Sincerely,
/g s M-M g
J. M. Felton, Director Division of Rules and Records Office of Administration i
Enclosures:
As stated i
8507220026 850528 PDR FOIA VARRICC85-101 PDR
]
.o Re: F01A-85-101 (Second Response)
APPENDIX E Documents Already Available in the PDR 1.
10/24/84 Document from R.P. Denise, RIV: NRC, to G.L. Koester Kansas Gas & Electric re: NRC Inspection Report 50-482/84-18, Accession No. 8503250489 2.
10/26/84 Document from L. Martin, NRC: RIV re: Notice of Significant Licensee Meeting (1 page) Docket 50 482, RIV, Arlington, TX, Accession 8411020253 3.
11/16/84 Document from Robert D. Martin to KG&E, re: Confirmatory Action Letter (3 pages) Accession No. 8411290633 4.
11/21/84 Document from Robert D. Martin, NRC: RIV, to KG&E re: Notice of Violation and Proposed Imposition of Civil Penalty EA 84-107 (7 pages) Accession No. 8411260360 5.
12/21/84 Document from G.L. Koester, KG&E to R.C. DeYoung, Dir., I AE:
NRC re: Letter,
Subject:
Enforcement Action 84-107 (5 pages)
Accession No. 8412310121 6.
12/31/84 Document from G.L. Koester to R.C. DeYoung KG&E Pesponse letter to EA 84-107 (1 page) Accession No. 8501090184 7.
12/31/84 Document from G.L. Koester to R.C. DeYoung, KG&E response letter to EA 84-107 (1 page), w/ enclosures, Violation assessed Civil Penalty, (3 pages) Dath of Affiliation (1 page)
Accession No. 8501090184 8.
01/21/85 Docunent from G.L. Koester to R.C. DeYoung, KGAE Supplemental response to EA 84-107. Accession No. 8501280421 9.
02/15/85 Document from G.L. Koester to R.P. Denise NPC;RIV, Letter, Sub,iect: " Supplemental Information Concerning Structural Steel Welding" (2 pages) w/ attachments, " Criticality Review of Inaccessible Welds" (1 page) Accession No. 8503150003
- 10. 03/04/85 Document from G.L. Koester to R.P. Denise, Letter, Sub.iect:
" Supplemental Info Concerning Structural Steel Welding" (1 page) w/att., " Reinspection Status of Structural Steel Connections Previously Reported as Inaccessible But Not Embedded in Concrete" (1 page) Accession No. 8503150003
Re: F0lA-85-101 (Second Response)
APPENDIX D Documents 8eing Placed in PDR 1.
Undated Management Plan Overview (3 pages) 2.
03/26/85 Meeting Sununary Distribution (36 pages) 3.
03/18/85 Meeting Summary Distribution (25 pages) 4.
02/27/85 Structural Steel Welding Presentation, Kansas Gas and Electric Company, Wolf Creek Generating Station (44 pages) 5.
12/27/84 Interoffice Coorespondence to R. M. Grant from G. L. Fouts, subject: Wolf Creek Generating Station Correction Action Request No. 19 Final Report (341 pages) 6.
11/28/84 Agenda for Meeting (KG&E and Region IV, NRC (19 pages) 7.
10/29/84 Letter to Mr. Robert D. Martin, NRC from Glen L. Koester, KG&E subject: Interim 10 CFR 50.55(e) Report-Inspection of Welds (2 pages) 8.
,10/29/84 Agenda: NRC/KG&E Region IV Headquarters, Arlington, TX (1page) 9.
10/29/84 Enforcement Conference - Attendance List KG&E (1 page) 10.
10/26/84 Interoffice Correspondence to R. M. Grant from G. L. Fouts subject: Wolf Creek Generating Station Management Plan for KG&E Corrective Action Request 19-Resolution (2 pages) 11.
10/26/84 Kansas Electric Gas & Electric, subject: Management Plan (15 pages) w/following attachments:
a) 10/26/84 KG&E Logic Chart for Resolution CAR 19 (4 xerox pages) b) 10/26/84 KG&E CAR 19 Correction Action Schedule (4 xerox pages) 12.
10/17/84 Interoffice Correspondence to G. L. Fouts from R. M. Grant,
Subject:
Corrective Action Request (CAR) No. 19 (12 pages) v T
?
e GOVERNMENT ACCOUNTABluTY PROKCT 1555 Comecncut Awmue, N.W., Suite 202 1
Washington. D.C. 20036 (202)232-8550 s
February 6, 1985 gp or )NFORMATON Director Office of Administration gp1 Nuclear Regulatory Commission
" \\ (>
f0M' Washington, D.C.
205S5 To Whom It May Concern:
$44 Pursuant to the Freedom of Information Act (FOIA), 5 U.S.C.
E552, the Government Accountability Project (GAP) recuests copies of any and al] agency records and information, including but not limitec to notes, inter-office memoranda, letters, memoranda, drafts, minutes, diaries, logs, calendars, tapes, transcripts, summaries, interview reports, procedures instructions, engineering analyses, drawings, files, graphs, maps, photographs, agreements, handwritten notes, studies, data sheets, notebooks, telephone messages, books, computations, voice recordings, computer run-offs, representative records, interim and/or final reports, status reports, and any and all other records relevant to and/or generated in connection with the Wolf Creek Generating Station STN-50-4E2 in the following areas:
Institute of Nuclear Power Operations 1983 (INPO) Report cr U; f C: c te.
En r reptr,rcferred tc i: cr. October 9,
19E4 lettc f rt: Enrrel G. E i s e r.h u t, Director of the Office of Nuclear Reactor Regulation, tc Michele Varricchio of the Government Acccuntability Project, was received on the Wolf Creek site by NRC Cffice of Inspectior ar.d Enforcement and NRC Regior I'J representEtiver,
.t_ _ _ g L.. c :.; cc: ' c te ; d riz.; c;r.r.racilen a
. ; c e ". s i r :
cf th.
<:1. Creci Sc:.cr c.ing S ta tion by thc ':hC C,f fice c f I nve s ti ga tior.s,
NRC meeting of January 15, 1985 with Kansas Gas and Electric to discuss the operational readiness of Wolf Creek and a February 6, 1985 meeting held for the same purpose, NRC meeting held in Bethesda Maryland on November 28, 1984 to discuss the status of completion and future schedule for licensing of Wolf Creek, l
9
/
/
a Director Page two Office of Administration February 6, 1985 NRC investigations and inspections regarding the allegations of James Wells, employee at Wolf Creek.
NRC Region IV meeting October 29, 1984, Enforcement Conference.
If any records as defined in 10 CFR 59.3(b) and the NRC
. Manual, supra, and covered by this request have been destroyed and/or removed after this request, please provide all records which.have been or are destroyed and/or removed, a description of the action (s) taken relevant to, generated in connection with, and/or issued in order to implement the action (s).
GAP requests that fees be waived, because providing the requested information "can be considered as primarily benefitting the general'public," 5 U.S.C. 552 (a) (4) (A).
GAP is a non-profit, non-particcn public interest organization concerned with honest and open government.
Through legal representation, advice, national >ccnferences, films, publications, and public outreach, GAP promoteg w,histle-blowers as agents of governmental accountability.
GAP is currently working with citizens groups in the 1:ansas area concerning the Wolf Creek Generating Station.
For any documents or portions of documents that you deny access to, please provide an index, as required b3 Vauchn v. Rcsen, 484 F.2d E20 (D.C.Cir. 19 73), cert. denied, 415 U.S.
977 (1977),
itemizing and describing the documents or portions of doeur.ents wi thhcli,g ar.C p rovi ding a dc tcilti justificati:- cf 3 en g:c u: :
for c1Litir.: caer excr.pticr.
Tbir? you for your prerpt response to this requcst.
We look f erward to such a response within ter. days.
=\\
i:::dre; I'.
< '. : s.. '. e.
t jNichele Varricchio Law Clerk o-un,
.ns.
Thomas Devine Legal Director i
d I
d O
1 l'
_-___s