ML20133F608: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:F | {{#Wiki_filter:F 1 | ||
APPENDIX A NOTICE OF VIOLATION Arkansas Power and Light Company | 1 APPENDIX A NOTICE OF VIOLATION Arkansas Power and Light Company Docket: | ||
l | 50-368 Arkansas Nuclear One, Unit 2 License: | ||
i | NPF-6 l | ||
l During an NRC inspection conducted on May 20-24, 1985, a violation of NRC requirements was identified. | |||
The violation involved failure to maintain procedures current. | |||
In accordance with the " General Statement of Policy and Procedure for NRC Enforceeent Actions," 10 CFR Part 2, Appendix C (1985), the violation is listed below: | |||
i i | |||
Failure to Maintain Procedures Arkansas Nuc1 car One, Unit 2, Technical Specifications paragraph 6.8.1 states: | |||
" Written procedures shall be established, implemented, and maintained covering the activities referenced below: | |||
. f. Fire protection program implementation...." | |||
Contrary to the above, Procedure 2203.09, " Fire Protection System Annunciator Corrective Action," Revision 0, dated June 26, 1981, Attachment A, 1-5-5, " Corridor by Emergency Control Room Chillers Zone Module " had not been revised to reflect deactivation of remote actuation by closing supply valve for deluge system automatic valve as a result of the granting of an exemption request to deactivate the automatic capability of this deluge valve. | Contrary to the above, Procedure 2203.09, " Fire Protection System Annunciator Corrective Action," Revision 0, dated June 26, 1981, Attachment A, 1-5-5, " Corridor by Emergency Control Room Chillers Zone Module " had not been revised to reflect deactivation of remote actuation by closing supply valve for deluge system automatic valve as a result of the granting of an exemption request to deactivate the automatic capability of this deluge valve. | ||
This is a Severity Level V Violation. | This is a Severity Level V Violation. | ||
Pursuant to the provlsions of 10 CFR 2.201, Arkansas Power & Light Company is hereby required to submit to this office, within 30 days of the date of | (Supplement I) (50-368/85-16) | ||
the letter transmittin0 this Notice, a written statement or explanation in reply, includin0: | Pursuant to the provlsions of 10 CFR 2.201, Arkansas Power & Light Company is hereby required to submit to this office, within 30 days of the date of the letter transmittin0 this Notice, a written statement or explanation in reply, includin0: | ||
Dated at Arlington, Texas this | (1) the reason for the violation if admitted, (2) the corrective steps which have been taken and the results achieved; (3) corrective steps which will be taken to avoid further violations; and (4) the date when full compliance will be achieved. Where good cause is shown, consideration will be Diven to extending the response time. | ||
Dated at Arlington, Texas d | |||
this Ji day of July,1985 0500000359 050705 i | |||
PDN ADOCK 050003f3 0 | |||
PDH | |||
.}} | |||
Latest revision as of 08:25, 12 December 2024
| ML20133F608 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 07/25/1985 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | |
| Shared Package | |
| ML20133F585 | List: |
| References | |
| 50-368-85-16, NUDOCS 8508080359 | |
| Download: ML20133F608 (1) | |
Text
F 1
1 APPENDIX A NOTICE OF VIOLATION Arkansas Power and Light Company Docket:
50-368 Arkansas Nuclear One, Unit 2 License:
NPF-6 l
l During an NRC inspection conducted on May 20-24, 1985, a violation of NRC requirements was identified.
The violation involved failure to maintain procedures current.
In accordance with the " General Statement of Policy and Procedure for NRC Enforceeent Actions," 10 CFR Part 2, Appendix C (1985), the violation is listed below:
i i
Failure to Maintain Procedures Arkansas Nuc1 car One, Unit 2, Technical Specifications paragraph 6.8.1 states:
" Written procedures shall be established, implemented, and maintained covering the activities referenced below:
. f. Fire protection program implementation...."
Contrary to the above, Procedure 2203.09, " Fire Protection System Annunciator Corrective Action," Revision 0, dated June 26, 1981, Attachment A, 1-5-5, " Corridor by Emergency Control Room Chillers Zone Module " had not been revised to reflect deactivation of remote actuation by closing supply valve for deluge system automatic valve as a result of the granting of an exemption request to deactivate the automatic capability of this deluge valve.
This is a Severity Level V Violation.
(Supplement I) (50-368/85-16)
Pursuant to the provlsions of 10 CFR 2.201, Arkansas Power & Light Company is hereby required to submit to this office, within 30 days of the date of the letter transmittin0 this Notice, a written statement or explanation in reply, includin0:
(1) the reason for the violation if admitted, (2) the corrective steps which have been taken and the results achieved; (3) corrective steps which will be taken to avoid further violations; and (4) the date when full compliance will be achieved. Where good cause is shown, consideration will be Diven to extending the response time.
Dated at Arlington, Texas d
this Ji day of July,1985 0500000359 050705 i
PDN ADOCK 050003f3 0
PDH
.