Notice of Violation from Insp on 850520-24
ML20133F608
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 07/25/1985
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20133F585 List:
References
50-368-85-16, NUDOCS 8508080359
Download: ML20133F608 (1)


Text

F 1 1

APPENDIX A NOTICE OF VIOLATION Arkansas Power and Light Company Docket: 50-368 Arkansas Nuclear One, Unit 2 License: NPF-6 l

l During an NRC inspection conducted on May 20-24, 1985, a violation of NRC requirements was identified. The violation involved failure to maintain procedures current. In accordance with the " General Statement of Policy and Procedure for NRC Enforceeent Actions," 10 CFR Part 2, Appendix C (1985), the i violation is listed below:

i Failure to Maintain Procedures Arkansas Nuc1 car One, Unit 2, Technical Specifications paragraph 6.8.1 states: " Written procedures shall be established, implemented, and maintained covering the activities referenced below: .. . f. Fire protection program implementation . . . ."

Contrary to the above, Procedure 2203.09, " Fire Protection System Annunciator Corrective Action," Revision 0, dated June 26, 1981, Attachment A, 1-5-5, " Corridor by Emergency Control Room Chillers Zone Module " had not been revised to reflect deactivation of remote actuation by closing supply valve for deluge system automatic valve as a result of the granting of an exemption request to deactivate the automatic capability of this deluge valve.

This is a Severity Level V Violation. (Supplement I) (50-368/85-16)

Pursuant to the provlsions of 10 CFR 2.201, Arkansas Power & Light Company is hereby required to submit to this office, within 30 days of the date of '

the letter transmittin0 this Notice, a written statement or explanation in reply, includin0: (1) the reason for the violation if admitted, (2) the corrective steps which have been taken and the results achieved; (3) corrective steps which will be taken to avoid further violations; and (4) the date when full compliance will be achieved. Where good cause is shown, consideration will be Diven to extending the response time.

Dated at Arlington, Texas this Jid day of July,1985 0500000359 050705 PDN i