ENS 48968: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 04/25/2013 17:59 CDT | | event date = 04/25/2013 17:59 CDT | ||
| last update date = 04/29/2013 | | last update date = 04/29/2013 | ||
| title = Vent Stack Radiation Monitors De-Energized | | title = Vent Stack Radiation Monitors De-Energized for Short Duration During Pre-Planned Maintenance | ||
| event text = This is a report of a loss of emergency assessment capability as required by 10 CFR 50.72(b)(3)(xiii). | | event text = This is a report of a loss of emergency assessment capability as required by 10 CFR 50.72(b)(3)(xiii). | ||
On April 25, 2013 at 1759 CDT, with Unit 2 in Mode 6 during a refueling outage, power was interrupted to all Unit 2 vent stack radiation monitors as part of a pre-planned activity to connect the radiation monitors to an alternate temporary power supply to support de-energizing the normal power source for preventative maintenance. The connection to the alternate supply was completed and power was restored to the vent stack radiation monitors at 1845 CDT. While the radiation monitors were without power, pre-planned compensatory measures were implemented to monitor vent stack discharge and to minimize activities that posed a potential for release. | On April 25, 2013 at 1759 CDT, with Unit 2 in Mode 6 during a refueling outage, power was interrupted to all Unit 2 vent stack radiation monitors as part of a pre-planned activity to connect the radiation monitors to an alternate temporary power supply to support de-energizing the normal power source for preventative maintenance. The connection to the alternate supply was completed and power was restored to the vent stack radiation monitors at 1845 CDT. While the radiation monitors were without power, pre-planned compensatory measures were implemented to monitor vent stack discharge and to minimize activities that posed a potential for release. |
Latest revision as of 21:01, 1 March 2018
Where | |
---|---|
Farley Alabama (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness | |
Time - Person (Reporting Time:+-2.13 h-0.0888 days <br />-0.0127 weeks <br />-0.00292 months <br />) | |
Opened: | Josh Carroll 20:51 Apr 25, 2013 |
NRC Officer: | Bill Huffman |
Last Updated: | Apr 29, 2013 |
48968 - NRC Website
| |