ENS 50085: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 16: | Line 16: | ||
| event date = 05/03/2014 12:09 CDT | | event date = 05/03/2014 12:09 CDT | ||
| last update date = 05/03/2014 | | last update date = 05/03/2014 | ||
| title = Automatic Reactor Scram Due | | title = Automatic Reactor Scram Due to Generator/Turbine Load Mismatch | ||
| event text = At 1209 CDT on 3 May 2014, Dresden Unit 2 automatically scrammed on a Generator-Turbine Load Mismatch signal following a main generator trip. All rods inserted to their full in positions. | | event text = At 1209 CDT on 3 May 2014, Dresden Unit 2 automatically scrammed on a Generator-Turbine Load Mismatch signal following a main generator trip. All rods inserted to their full in positions. | ||
All systems operated as expected. Reactor vessel inventory and pressure are being maintained in automatic. | All systems operated as expected. Reactor vessel inventory and pressure are being maintained in automatic. | ||
Latest revision as of 20:50, 1 March 2018
| Where | |
|---|---|
| Dresden Illinois (NRC Region 3) | |
| Reporting | |
| 10 CFR 50.72(b)(2)(iv)(B), RPS Actuation | |
| Time - Person (Reporting Time:+-1.9 h-0.0792 days <br />-0.0113 weeks <br />-0.0026 months <br />) | |
| Opened: | Joshua Pickett 15:15 May 3, 2014 |
| NRC Officer: | Jeff Rotton |
| Last Updated: | May 3, 2014 |
| 50085 - NRC Website
| |