ENS 50085: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 05/03/2014 12:09 CDT
| event date = 05/03/2014 12:09 CDT
| last update date = 05/03/2014
| last update date = 05/03/2014
| title = Automatic Reactor Scram Due To Generator/Turbine Load Mismatch
| title = Automatic Reactor Scram Due to Generator/Turbine Load Mismatch
| event text = At 1209 CDT on 3 May 2014, Dresden Unit 2 automatically scrammed on a Generator-Turbine Load Mismatch signal following a main generator trip.  All rods inserted to their full in positions.
| event text = At 1209 CDT on 3 May 2014, Dresden Unit 2 automatically scrammed on a Generator-Turbine Load Mismatch signal following a main generator trip.  All rods inserted to their full in positions.
All systems operated as expected.  Reactor vessel inventory and pressure are being maintained in automatic.
All systems operated as expected.  Reactor vessel inventory and pressure are being maintained in automatic.

Latest revision as of 20:50, 1 March 2018

ENS 50085 +/-
Where
Dresden Constellation icon.png
Illinois (NRC Region 3)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation
Time - Person (Reporting Time:+-1.9 h-0.0792 days <br />-0.0113 weeks <br />-0.0026 months <br />)
Opened: Joshua Pickett
15:15 May 3, 2014
NRC Officer: Jeff Rotton
Last Updated: May 3, 2014
50085 - NRC Website
Loading map...