ENS 50096: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 05/07/2014 MDT
| event date = 05/07/2014 MDT
| last update date = 05/08/2014
| last update date = 05/08/2014
| title = Part 21  - Potential Defect In Nus-710Du Trip Unit To Produce A Valid Trip Output Signal
| title = Part 21  - Potential Defect in Nus-710Du Trip Unit to Produce a Valid Trip Output Signal
| event text = The following summary was provided by Curtiss-Wright Flow Control Corporation:
| event text = The following summary was provided by Curtiss-Wright Flow Control Corporation:
In certain operating configurations, NUS-710DU Trip Units could fail to produce a valid trip output signal.
In certain operating configurations, NUS-710DU Trip Units could fail to produce a valid trip output signal.

Latest revision as of 20:50, 1 March 2018

ENS 50096 +/-
Where
Scientech
Idaho Falls, Idaho (NRC Region 4)
Organization: Scientech
Reporting
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect
Time - Person (Reporting Time:+32.95 h1.373 days <br />0.196 weeks <br />0.0451 months <br />)
Opened: Vincent Chermak
14:57 May 8, 2014
NRC Officer: Steve Sandin
Last Updated: May 8, 2014
50096 - NRC Website
Loading map...