ENS 50560: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 17: Line 17:
| event date = 10/23/2014 01:07 CDT
| event date = 10/23/2014 01:07 CDT
| last update date = 12/17/2014
| last update date = 12/17/2014
| title = Secondary Containment Inoperable Due To Both Airlock Doors Open Simultaneously
| title = Secondary Containment Inoperable Due to Both Airlock Doors Open Simultaneously
| event text = At 0107 CDT on October 23rd, 2014, both doors in one of the Secondary Containment airlocks were momentarily open concurrently. This occurred during vessel drain down following refueling activities, an Operation with the Potential to Drain the Reactor Vessel (OPDRV), which required Secondary Containment to be operable. The doors being open at the same time resulted in the momentary inoperability of Secondary Containment. One of the doors was immediately closed, and Secondary Containment was restored to an operable status.
| event text = At 0107 CDT on October 23rd, 2014, both doors in one of the Secondary Containment airlocks were momentarily open concurrently. This occurred during vessel drain down following refueling activities, an Operation with the Potential to Drain the Reactor Vessel (OPDRV), which required Secondary Containment to be operable. The doors being open at the same time resulted in the momentary inoperability of Secondary Containment. One of the doors was immediately closed, and Secondary Containment was restored to an operable status.
The station [Duane Arnold] has now completed the OPDRV associated with vessel drain down, and Secondary Containment is no longer required to be operable.
The station [Duane Arnold] has now completed the OPDRV associated with vessel drain down, and Secondary Containment is no longer required to be operable.

Latest revision as of 21:48, 1 March 2018

ENS 50560 +/- *RETRACTED*
Where
Duane Arnold NextEra Energy icon.png
Iowa (NRC Region 3)
Reporting
10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material
Time - Person (Reporting Time:+3.68 h0.153 days <br />0.0219 weeks <br />0.00504 months <br />)
Opened: Stephen Speirs
09:48 Oct 23, 2014
NRC Officer: Daniel Mills
Last Updated: Dec 17, 2014
50560 - NRC Website
Loading map...