ENS 50713: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 01/02/2015 03:14 CST
| event date = 01/02/2015 03:14 CST
| last update date = 01/02/2015
| last update date = 01/02/2015
| title = Loss Of Meteorological Emergency Assessment Capability
| title = Loss of Meteorological Emergency Assessment Capability
| event text = At 0314 [CST] on 01/02/2015, a partial loss of the 25KV Power Distribution Systems caused a loss of both the Primary and Backup Meteorological Towers at the Comanche Peak Nuclear Power Plant. This resulted in a major loss of emergency assessment capabilities in regard to meteorological conditions.
| event text = At 0314 [CST] on 01/02/2015, a partial loss of the 25KV Power Distribution Systems caused a loss of both the Primary and Backup Meteorological Towers at the Comanche Peak Nuclear Power Plant. This resulted in a major loss of emergency assessment capabilities in regard to meteorological conditions.
The 25 KV Plant Support Power Loop feeds certain non-safety-related equipment and does not affect plant operation.
The 25 KV Plant Support Power Loop feeds certain non-safety-related equipment and does not affect plant operation.

Latest revision as of 20:48, 1 March 2018

ENS 50713 +/-
Where
Comanche Peak Luminant icon.png
Texas (NRC Region 4)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+2.48 h0.103 days <br />0.0148 weeks <br />0.0034 months <br />)
Opened: Danny Bradford
11:43 Jan 2, 2015
NRC Officer: Vince Klco
Last Updated: Jan 2, 2015