| event date = 03/07/2015 21:40 CST
| event date = 03/07/2015 21:40 CST
| last update date = 03/08/2015
| last update date = 03/08/2015
| title = Specified System Actuation Due To Loss Of One Reserve Station Service Offsite Power Source
| title = Specified System Actuation Due to Loss of One Reserve Station Service Offsite Power Source
| event text = On March 7, 2015, at 2140 CST, with the plant in Mode 5, Refueling, the RSS#2, one of two Reserve Station Service offsite power sources, de-energized.  This loss of RSS#2 caused the de-energization of the Division 2 Safety Bus, which caused a valid start signal to the logic of the Division 2 Emergency Diesel Generator.  No start occurred, however, due to the diesel being in the maintenance mode.  Division 2 Standby Service Water, which was being run for system fill and vent as well as surveillance testing, also lost power.
| event text = On March 7, 2015, at 2140 CST, with the plant in Mode 5, Refueling, the RSS#2, one of two Reserve Station Service offsite power sources, de-energized.  This loss of RSS#2 caused the de-energization of the Division 2 Safety Bus, which caused a valid start signal to the logic of the Division 2 Emergency Diesel Generator.  No start occurred, however, due to the diesel being in the maintenance mode.  Division 2 Standby Service Water, which was being run for system fill and vent as well as surveillance testing, also lost power.
At the time RSS#2 was lost, the Division 2 Diesel generator and Division 2 Standby Service Water were inoperable for the Refuel Outage 18 Division 2 maintenance window.
At the time RSS#2 was lost, the Division 2 Diesel generator and Division 2 Standby Service Water were inoperable for the Refuel Outage 18 Division 2 maintenance window.

Latest revision as of 21:48, 1 March 2018

ENS 50872 +/-
Where
River Bend Entergy icon.png
Louisiana (NRC Region 4)
Reporting
10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+1.68 h0.07 days <br />0.01 weeks <br />0.0023 months <br />)
Opened: Danny James
05:21 Mar 8, 2015
NRC Officer: Donald Norwood
Last Updated: Mar 8, 2015
50872 - NRC Website