ENS 50878: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 03/11/2015 06:21 EDT
| event date = 03/11/2015 06:21 EDT
| last update date = 03/11/2015
| last update date = 03/11/2015
| title = Automatic Reactor Trip Due To A Nuclear Instrumentation Signal
| title = Automatic Reactor Trip Due to a Nuclear Instrumentation Signal
| event text = At [0621 EDT] on 3/11/2015,  Sequoyah Unit 1 reactor/turbine automatically tripped.   
| event text = At [0621 EDT] on 3/11/2015,  Sequoyah Unit 1 reactor/turbine automatically tripped.   
Following the reactor trip, all safety-related equipment operated as designed.  Auxiliary Feedwater automatically initiated as expected from the Feedwater Isolation Signal.  
Following the reactor trip, all safety-related equipment operated as designed.  Auxiliary Feedwater automatically initiated as expected from the Feedwater Isolation Signal.  

Latest revision as of 21:48, 1 March 2018

ENS 50878 +/-
Where
Sequoyah Tennessee Valley Authority icon.png
Tennessee (NRC Region 2)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+-0.85 h-0.0354 days <br />-0.00506 weeks <br />-0.00116 months <br />)
Opened: Matt Jungels
09:30 Mar 11, 2015
NRC Officer: Vince Klco
Last Updated: Mar 11, 2015
50878 - NRC Website
Loading map...