ENS 51285: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 06/05/2015 EDT | | event date = 06/05/2015 EDT | ||
| last update date = 08/04/2015 | | last update date = 08/04/2015 | ||
| title = Part 21 Report - Ferraz Shawmut/Mersen Fuses P/N: Ajt25 | | title = Part 21 Report - Ferraz Shawmut/Mersen Fuses P/N: Ajt25 and Ajt60 | ||
| event text = The following information was excerpted from the email provided by the reporting organization: | | event text = The following information was excerpted from the email provided by the reporting organization: | ||
On April 2015, United Controls International (UCI) performed dedication testing on time delay fuses AJT25 and AJT60 for First Energy - Perry Nuclear Power Plant under purchase orders 45469886 and 45469450, respectively. The subject fuses were being tested per United Controls Standard dedication testing which excludes seismic and environmental testing requirements. Both fuses, AJT25 and AJT60 opened during their current clearing tests at times that are within their respective clearing time tolerance ranges but their Smartspot labels did not change color, as required, to indicate the fuses cleared. | On April 2015, United Controls International (UCI) performed dedication testing on time delay fuses AJT25 and AJT60 for First Energy - Perry Nuclear Power Plant under purchase orders 45469886 and 45469450, respectively. The subject fuses were being tested per United Controls Standard dedication testing which excludes seismic and environmental testing requirements. Both fuses, AJT25 and AJT60 opened during their current clearing tests at times that are within their respective clearing time tolerance ranges but their Smartspot labels did not change color, as required, to indicate the fuses cleared. |
Latest revision as of 20:47, 1 March 2018
Where | |
---|---|
Ferraz Shawmut/Mersen Norcross, Georgia (NRC Region 1) | |
Organization: | United Controls International |
Reporting | |
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
Time - Person (Reporting Time:+1446.48 h60.27 days <br />8.61 weeks <br />1.981 months <br />) | |
Opened: | Korina Looft 10:29 Aug 4, 2015 |
NRC Officer: | Steve Sandin |
Last Updated: | Aug 4, 2015 |
51285 - NRC Website | |