ENS 51386: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 04/16/2015 EDT | | event date = 04/16/2015 EDT | ||
| last update date = 09/10/2015 | | last update date = 09/10/2015 | ||
| title = Part 21 Report - Potential Failure | | title = Part 21 Report - Potential Failure of Electromatic Relief Valve Cutout Switches | ||
| event text = The following information was excerpted from an Interim Part 21 Report, received from GE-Hitachi (GEH) via email: | | event text = The following information was excerpted from an Interim Part 21 Report, received from GE-Hitachi (GEH) via email: | ||
[This GEH Report #MFN-15-042 R2, is a closure of a Part 21 60-Day Interim Report Notification, containing] information concerning an evaluation of the failure during bench testing of Electromatic Relief Valve Actuators (ERV - GEH Part number 352B2632G001) caused by the failure of a cutout switch to determine applicability to components previously supplied to and accepted by licensees. GEH has performed component testing but has been unable to complete the evaluation to determine if a Reportable Condition, in accordance with 10 CFR 21.21 exists. | [This GEH Report #MFN-15-042 R2, is a closure of a Part 21 60-Day Interim Report Notification, containing] information concerning an evaluation of the failure during bench testing of Electromatic Relief Valve Actuators (ERV - GEH Part number 352B2632G001) caused by the failure of a cutout switch to determine applicability to components previously supplied to and accepted by licensees. GEH has performed component testing but has been unable to complete the evaluation to determine if a Reportable Condition, in accordance with 10 CFR 21.21 exists. |
Latest revision as of 20:46, 1 March 2018
Where | |
---|---|
Ge-Hitachi Nuclear Energy Wilmington, North Carolina (NRC Region 1) | |
Organization: | Ge-Hitachi Nuclear Energy |
Reporting | |
10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component | |
Time - Person (Reporting Time:+3539.83 h147.493 days <br />21.07 weeks <br />4.849 months <br />) | |
Opened: | Dale E Porter 15:50 Sep 10, 2015 |
NRC Officer: | John Shoemaker |
Last Updated: | Sep 10, 2015 |
51386 - NRC Website | |