ENS 51730: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 02/11/2016 23:05 EST
| event date = 02/11/2016 23:05 EST
| last update date = 02/12/2016
| last update date = 02/12/2016
| title = Emergency Diesel Generator Auto-Started Due To The Loss Of A Station Service Transformer  
| title = Emergency Diesel Generator Auto-Started Due to the Loss of a Station Service Transformer  
| event text = On 02/11/2016, at 2305 [EST], Ginna Station experienced a loss of Station Service Transformer 12A causing Emergency Diesel Generator 1A to automatically start due to under-voltage signals to safeguards buses 14 and 18. All plant systems responded as designed. Control room operators stabilized the plant per abnormal operating procedures. The plant is currently in a 100/0 electrical lineup [supplied by the 12B Service Station Transformer] on the off site circuit 767 with the 1A Emergency Diesel Generator secured. The loss of the station service transformer is currently under investigation.  
| event text = On 02/11/2016, at 2305 [EST], Ginna Station experienced a loss of Station Service Transformer 12A causing Emergency Diesel Generator 1A to automatically start due to under-voltage signals to safeguards buses 14 and 18. All plant systems responded as designed. Control room operators stabilized the plant per abnormal operating procedures. The plant is currently in a 100/0 electrical lineup [supplied by the 12B Service Station Transformer] on the off site circuit 767 with the 1A Emergency Diesel Generator secured. The loss of the station service transformer is currently under investigation.  
This is reportable as a valid system actuation that was not part of a pre-planned sequence during testing.
This is reportable as a valid system actuation that was not part of a pre-planned sequence during testing.

Latest revision as of 21:45, 1 March 2018

ENS 51730 +/-
Where
Ginna Constellation icon.png
New York (NRC Region 1)
Reporting
10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+-0.23 h-0.00958 days <br />-0.00137 weeks <br />-3.15054e-4 months <br />)
Opened: Kenneth Corl
03:51 Feb 12, 2016
NRC Officer: Howie Crouch
Last Updated: Feb 12, 2016
51730 - NRC Website
Loading map...