ENS 51776: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 03/07/2016 16:15 MST | | event date = 03/07/2016 16:15 MST | ||
| last update date = 04/13/2016 | | last update date = 04/13/2016 | ||
| title = Administrative Items Relied | | title = Administrative Items Relied on for Safety (Irofs) Not Performed | ||
| event text = During the afternoon of March 7, 2016, UUSA [Urenco USA] operators moved drums containing uranic material into an IROFS [Items Relied On For Safety] controlled array. This IROFS requires initial and independent operator verification to ensure a subcritical geometry exists prior to adding any new material to the array. The operators moving the drums did not perform the administrative IROFS; that is, neither an initial nor an independent | | event text = During the afternoon of March 7, 2016, UUSA [Urenco USA] operators moved drums containing uranic material into an IROFS [Items Relied On For Safety] controlled array. This IROFS requires initial and independent operator verification to ensure a subcritical geometry exists prior to adding any new material to the array. The operators moving the drums did not perform the administrative IROFS; that is, neither an initial nor an independent | ||
verification were completed prior to adding five additional drums to the array. | verification were completed prior to adding five additional drums to the array. |
Revision as of 20:45, 1 March 2018
Where | |
---|---|
Louisiana Energy Services Eunice, New Mexico (NRC Region 2) | |
License number: | Snm-2010 |
Reporting | |
Part 70 App A (A)(4) | |
Time - Person (Reporting Time:+-3.97 h-0.165 days <br />-0.0236 weeks <br />-0.00544 months <br />) | |
Opened: | Charles Slama 19:17 Mar 7, 2016 |
NRC Officer: | Howie Crouch |
Last Updated: | Apr 13, 2016 |
51776 - NRC Website | |