ML20137Q127: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:- | {{#Wiki_filter:- | ||
.- . | |||
. | . | ||
. | |||
. | .. - | ||
- | |||
- - | |||
- _ _ | |||
- | |||
. | |||
. .. . | |||
. | |||
SEP 171985 | |||
. | |||
' | |||
t | t | ||
Docket No. 50-266 | |||
' | ' | ||
Docket No. 50-301 | |||
Wisconsin Electric Power Company | |||
ATTN: Mr. C. W. Fay | |||
, | , | ||
Vice President | |||
- | |||
Nuclear Power Department | |||
.' | |||
231 West Michigan, Room 308 | |||
Milwaukee, WI 53201 | |||
Gentlemen: | |||
I | I | ||
This refers to the routine safety inspection conducted by Mr. W. Milbrot of | |||
this office on August 26 and 27,1985, of activities at Point Beach Nuclear | |||
- | |||
Plant, Units 1 and 2, authorized by NRC Operating License No. DPR-24 and | |||
. | i | ||
No. DPR-27 and to the discussion of our findings with Mr. J. J. Zach and | |||
! | l | ||
others of your staff at the conclusion of the inspection. | |||
! | |||
3 | |||
. | |||
The enclosed copy of our inspection report identifies areas examined during | |||
! | |||
the inspection. Within these areas, the inspection consisted of a selective | |||
i | i | ||
i | examination of procedures and representative records, observations, and | ||
interviews with personnel. | |||
; | |||
; | j | ||
No items of noncompliance with NRC requirements were identified during the | |||
l | |||
course of this inspection. | |||
i | |||
i | |||
In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of | |||
; | |||
this letter and the enclosures will be placed in the NRC's Public Document | |||
, | |||
Room. | |||
l | |||
; | |||
; | |||
1 | 1 | ||
j | j | ||
; | We will gladly discuss any questions you have concerning this inspection. | ||
; | ; | ||
; | |||
i | |||
; | |||
Sincerely, | |||
; | |||
! | |||
1 | 1 | ||
GRIGINAL g g G SY L. A. REYES | |||
! | |||
Luis A. Reyes, Chief | |||
; | - | ||
; | |||
Operations Branch | |||
j | |||
; | |||
Enclosure: | |||
Inspection Report | |||
L | |||
No. 50-266/85016 DRS ; | |||
No. 50-301/85016 DRS | |||
, | |||
See Attached List For Distribution | |||
'' | |||
; | |||
; | |||
i | |||
266 | |||
PDR | |||
; | ; | ||
b | |||
if c / | |||
! | |||
- | |||
. . . | . | ||
. | |||
. | |||
Wisconsin Electric Power Company | |||
2 | |||
SEP 17 lygf | |||
cc w/ enclosure: | |||
J. J. Zach, Plant Manager | |||
DCS/RSB (RIDS) | |||
Licensing Fee Management Branch | |||
Resident Inspector, RIII | |||
John J. Duffy, Chief | |||
Boiler Section | |||
Ness Flores, Chairperson | |||
Wisconsin Public Service | |||
Commission | |||
RIII | |||
RII | |||
RIII | |||
RI | |||
M | |||
o kja | |||
ul imond | |||
Jack | |||
ey s | |||
09/13 5 | |||
g fg | |||
qli156 | |||
,f p | |||
- - | |||
. | |||
- | |||
- | |||
. . | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- - | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
}} | }} | ||
Latest revision as of 22:28, 11 December 2024
| ML20137Q127 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 09/17/1985 |
| From: | Reyes L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Fay C WISCONSIN ELECTRIC POWER CO. |
| Shared Package | |
| ML20137Q131 | List: |
| References | |
| NUDOCS 8509200022 | |
| Download: ML20137Q127 (2) | |
See also: IR 05000266/1985016
Text
-
.- .
.
.
.. -
-
- -
- _ _
-
.
. .. .
.
SEP 171985
.
'
t
Docket No. 50-266
'
Docket No. 50-301
Wisconsin Electric Power Company
ATTN: Mr. C. W. Fay
,
Vice President
-
Nuclear Power Department
.'
231 West Michigan, Room 308
Milwaukee, WI 53201
Gentlemen:
I
This refers to the routine safety inspection conducted by Mr. W. Milbrot of
this office on August 26 and 27,1985, of activities at Point Beach Nuclear
-
Plant, Units 1 and 2, authorized by NRC Operating License No. DPR-24 and
i
No. DPR-27 and to the discussion of our findings with Mr. J. J. Zach and
l
others of your staff at the conclusion of the inspection.
!
3
.
The enclosed copy of our inspection report identifies areas examined during
!
the inspection. Within these areas, the inspection consisted of a selective
i
examination of procedures and representative records, observations, and
interviews with personnel.
j
No items of noncompliance with NRC requirements were identified during the
l
course of this inspection.
i
i
In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of
this letter and the enclosures will be placed in the NRC's Public Document
,
Room.
l
1
j
We will gladly discuss any questions you have concerning this inspection.
i
Sincerely,
!
1
GRIGINAL g g G SY L. A. REYES
!
Luis A. Reyes, Chief
-
Operations Branch
j
Enclosure:
Inspection Report
L
No. 50-266/85016 DRS ;
No. 50-301/85016 DRS
,
See Attached List For Distribution
i
266
b
if c /
!
-
.
.
.
Wisconsin Electric Power Company
2
SEP 17 lygf
cc w/ enclosure:
J. J. Zach, Plant Manager
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
John J. Duffy, Chief
Boiler Section
Ness Flores, Chairperson
Wisconsin Public Service
Commission
RIII
RII
RIII
RI
M
o kja
ul imond
Jack
ey s
09/13 5
g fg
qli156
,f p
- -
.
-
-
. .
-
-
-
-
-
-
- -
-
-
-
-
-
-