| event date = 09/06/2016 08:27 EDT
| event date = 09/06/2016 08:27 EDT
| last update date = 09/06/2016
| last update date = 09/06/2016
| title = Manual Reactor Scram Due To High Reactor Water Level
| title = Manual Reactor Scram Due to High Reactor Water Level
| event text = On Tuesday, September 6, 2016 at 0827 [EDT], with the reactor at 91% core thermal power (CTP), Pilgrim Nuclear Power Station (PNPS) operators initiated a manual reactor scram due to high reactor water level resulting from feedwater level control oscillation.  Other than the feedwater level control oscillations, all other plant systems responded as designed.  Plant cooldown is in progress using the High Pressure Coolant Injection System in the pressure control mode.   
| event text = On Tuesday, September 6, 2016 at 0827 [EDT], with the reactor at 91% core thermal power (CTP), Pilgrim Nuclear Power Station (PNPS) operators initiated a manual reactor scram due to high reactor water level resulting from feedwater level control oscillation.  Other than the feedwater level control oscillations, all other plant systems responded as designed.  Plant cooldown is in progress using the High Pressure Coolant Injection System in the pressure control mode.   
The plant is in hot shutdown.  The cause of the feed water level control oscillations is under investigation.  This event has no impact on the health and safety of the public.   
The plant is in hot shutdown.  The cause of the feed water level control oscillations is under investigation.  This event has no impact on the health and safety of the public.   

Latest revision as of 21:44, 1 March 2018

ENS 52223 +/-
Where
Pilgrim
Massachusetts (NRC Region 1)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+-1.05 h-0.0438 days <br />-0.00625 weeks <br />-0.00144 months <br />)
Opened: Robert O'Neill
11:24 Sep 6, 2016
NRC Officer: Bethany Cecere
Last Updated: Sep 6, 2016