ENS 52236: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 05/06/2016 PDT | | event date = 05/06/2016 PDT | ||
| last update date = 09/12/2016 | | last update date = 09/12/2016 | ||
| title = Part 21 Final Report- Deviations | | title = Part 21 Final Report- Deviations on Structural Module Vogtle Unit 3 Ap1000 Project | ||
| event text = The following was received via fax and is summarized below: | | event text = The following was received via fax and is summarized below: | ||
The attachment to this letter provides a report in accordance with 10 CFR 21.21 pertaining to deviations and potential defects in structural module CA33 for the Vogtle Unit 3 AP 1000r project. This issue was previously described in interim reports submitted by Greenberry in letters dated June 24, 2016 (NRC Log No. 2016-36-00, Accession No. ML16188A160) and July 26, 2016 (NRC Log No. 2016-36-01, Accession No. ML16229A180). | The attachment to this letter provides a report in accordance with 10 CFR 21.21 pertaining to deviations and potential defects in structural module CA33 for the Vogtle Unit 3 AP 1000r project. This issue was previously described in interim reports submitted by Greenberry in letters dated June 24, 2016 (NRC Log No. 2016-36-00, Accession No. ML16188A160) and July 26, 2016 (NRC Log No. 2016-36-01, Accession No. ML16229A180). |
Latest revision as of 21:44, 1 March 2018
Where | |
---|---|
Greenberry Industrial Vancouver, Washington (NRC Region 4) | |
Organization: | Greenberry Industrial |
Reporting | |
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
Time - Person (Reporting Time:+3107.05 h129.46 days <br />18.494 weeks <br />4.256 months <br />) | |
Opened: | Jason Pond 18:03 Sep 12, 2016 |
NRC Officer: | Steven Vitto |
Last Updated: | Sep 12, 2016 |
52236 - NRC Website | |