Line 16: Line 16:
| event date = 05/06/2016 PDT
| event date = 05/06/2016 PDT
| last update date = 09/12/2016
| last update date = 09/12/2016
| title = Part 21 Final Report- Deviations On Structural Module Vogtle Unit 3 Ap1000 Project  
| title = Part 21 Final Report- Deviations on Structural Module Vogtle Unit 3 Ap1000 Project  
| event text = The following was received via fax and is summarized below:
| event text = The following was received via fax and is summarized below:
The attachment to this letter provides a report in accordance with 10 CFR 21.21 pertaining to deviations and potential defects in structural module CA33 for the Vogtle Unit 3 AP 1000r project. This issue was previously described in interim reports submitted by Greenberry in letters dated June 24, 2016 (NRC Log No. 2016-36-00, Accession No. ML16188A160) and July 26, 2016 (NRC Log No. 2016-36-01, Accession No. ML16229A180).
The attachment to this letter provides a report in accordance with 10 CFR 21.21 pertaining to deviations and potential defects in structural module CA33 for the Vogtle Unit 3 AP 1000r project. This issue was previously described in interim reports submitted by Greenberry in letters dated June 24, 2016 (NRC Log No. 2016-36-00, Accession No. ML16188A160) and July 26, 2016 (NRC Log No. 2016-36-01, Accession No. ML16229A180).

Latest revision as of 21:44, 1 March 2018

ENS 52236 +/-
Where
Greenberry Industrial
Vancouver, Washington (NRC Region 4)
Organization: Greenberry Industrial
Reporting
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect
Time - Person (Reporting Time:+3107.05 h129.46 days <br />18.494 weeks <br />4.256 months <br />)
Opened: Jason Pond
18:03 Sep 12, 2016
NRC Officer: Steven Vitto
Last Updated: Sep 12, 2016