ML20148D817: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:-   _ _ . - -        .            . . . . . .    . . . - -  - -- .                  ,.
{{#Wiki_filter:-
  . 4 pn ma%g                                       UNITED STATES u
4 pn ma%g UNITED STATES p
p          t o
t NUCLEAR REGULATORY COMMISSION u
NUCLEAR REGULATORY COMMISSION
o
{0          $                                    REGloN IV 611 RYAN PLAZA DRIVE, SUITE 400 4'+9 * * * * * ,o['                     AR LINGToN, TEXAS 760118064 REVISED         REVISED             REVISED                 REVISED                 REVISED       REVISED REVISION TO MEETING LOCATION ISSUED ON MAY 1,1997 May 28,1997 i
{
NOTICE OF LICENSEE MEETING I
REGloN IV 0
Name of Licensee:           Entergy Operations, Inc Name of Facility:           Waterford 3 4
4'+9 * * * * *,o['
Docket:                     50-382                                                                             1 Date and Time               May 29,1997 of Meeting:                 10 a.m. to noon d
611 RYAN PLAZA DRIVE, SUITE 400 AR LINGToN, TEXAS 760118064 REVISED REVISED REVISED REVISED REVISED REVISED REVISION TO MEETING LOCATION ISSUED ON MAY 1,1997 May 28,1997 i
Location of Meeting:         Waterford 3 James M. Cain Entergy Education Center Auditorium Taft, Louisiana l
NOTICE OF LICENSEE MEETING Name of Licensee:
Purpose of Meeting:         Discuss licensee progresa in implementing their FOCUS Plan NRC Attendees:               E. Mershoff, Regional Administrator K. Perkins,~ Director, Walnut Creek Field Office F. Miralgia, Deputy Director, Office of Nuclear Reactor Regulation (NRR)                                                               ,
Entergy Operations, Inc Name of Facility:
Waterford 3 Docket:
50-382 4
1 Date and Time May 29,1997 of Meeting:
10 a.m. to noon d
Location of Meeting:
Waterford 3 James M. Cain Entergy Education Center Auditorium Taft, Louisiana l
Purpose of Meeting:
Discuss licensee progresa in implementing their FOCUS Plan NRC Attendees:
E. Mershoff, Regional Administrator K. Perkins,~ Director, Walnut Creek Field Office F. Miralgia, Deputy Director, Office of Nuclear Reactor Regulation (NRR)
P. Harrell, Chief, Project Branch D, Division of Reactor Projects (DRP)
P. Harrell, Chief, Project Branch D, Division of Reactor Projects (DRP)
C. Patel, Project Manager, Project Directorate IV-1, NRR
C. Patel, Project Manager, Project Directorate IV-1, NRR L. Keller, Senior Resident inspector, Project Branch D, DRP Licensee Attendees:
;                                        L. Keller, Senior Resident inspector, Project Branch D, DRP Licensee Attendees:         C. Dugger, Vice President Operations T. Leonard, General Manager Plant Operations A. Wrape, Director, Design Engineering i
C. Dugger, Vice President Operations T. Leonard, General Manager Plant Operations A. Wrape, Director, Design Engineering i
F. Drummond, Director, Site Support E. Ewing, Director, Nuclear Safety D. Matheny, Operations Manager R. Azzarello, Maintenance Manager                                             / ~7 D. Vinci, Systems Engineering Manager T. Gaudet, Licensing Manager NOTE:
F. Drummond, Director, Site Support E. Ewing, Director, Nuclear Safety D. Matheny, Operations Manager R. Azzarello, Maintenance Manager
This meeting is open to attendance by members of the general public, y                             J Approved By:                   (ru y ,\ n Thomas P. Gwynn,/Dir ctor Division of Reactor           jects 9706020114 970528 PDR   ADOCK0500g2 P
/
l       Nlillplpl?l
D. Vinci, Systems Engineering Manager
~7 T. Gaudet, Licensing Manager NOTE:
This meeting is open to attendance by members of the general public, y
J y,\\ n Approved By:
(ru Thomas P. Gwynn,/Dir ctor Division of Reactor jects 9706020114 970528 ADOCK0500g2 PDR P
l Nlillplpl?l


Entergy Operations, Inc.                                           E-Mail To:                 FOR
Entergy Operations, Inc. E-Mail To:
(   )                     NRC Attendees PMNS                       Mtg Announcement Coordinator JKR                       E. L. Jordan, DEDO PAB                       H. L. Thompson, DEDR ACT                       A. C. Thadani, ADT/NRR RPZ                       R. P. Zimmerman, ADP/NRR OEMAll                     J. Lieberman, D/OE LJC                       L. J. Chandler, OGC CAH                       C. A. Hackney, RSLO DMK1                       D. M. Kunihiro, WCFO GFS                       G. F. Sanborn, EO BWH                       B. Henderson, PAO MFH2                       M. Hammond, PAO JAC1, CMS, CJG             RA Secretaries LAT, DLF, CAM 3           DRP Division cc:
FOR
(
)
NRC Attendees PMNS Mtg Announcement Coordinator JKR E. L. Jordan, DEDO PAB H. L. Thompson, DEDR ACT A. C. Thadani, ADT/NRR RPZ R. P. Zimmerman, ADP/NRR OEMAll J. Lieberman, D/OE LJC L. J. Chandler, OGC CAH C. A. Hackney, RSLO DMK1 D. M. Kunihiro, WCFO GFS G. F. Sanborn, EO BWH B. Henderson, PAO MFH2 M. Hammond, PAO JAC1, CMS, CJG RA Secretaries LAT, DLF, CAM 3 DRP Division cc:
[ DMB (IE 45)1)
[ DMB (IE 45)1)
OEDO RIV Coordinator (17G21)
OEDO RIV Coordinator (17G21)
ORA File RIV File DRP File To receive copy of document. Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:PE:DRP/D               C:DRP/D l               RSLO         l       PAO         l       D:DRP         l GEWerner;dif               PHHarrell               CAHackney             BWHenderson           TPGwynn 5/28/97                       (NA)                   (NA)                 (NA)                 5/28/97 OFFICIAL RECORD COPY
ORA File RIV File DRP File To receive copy of document. Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:PE:DRP/D C:DRP/D l RSLO l
                                                                                                                              ;}}
PAO l
D:DRP l
GEWerner;dif PHHarrell CAHackney BWHenderson TPGwynn 5/28/97 (NA)
(NA)
(NA) 5/28/97 OFFICIAL RECORD COPY
;}}

Latest revision as of 11:59, 11 December 2024

Revised Notification of Licensee Meeting W/Util on 970529 to Discuss Licensee Progress in Implementing Focus Plan
ML20148D817
Person / Time
Site: Waterford 
Issue date: 05/28/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 9706020114
Download: ML20148D817 (2)


Text

-

4 pn ma%g UNITED STATES p

t NUCLEAR REGULATORY COMMISSION u

o

{

REGloN IV 0

4'+9 * * * * *,o['

611 RYAN PLAZA DRIVE, SUITE 400 AR LINGToN, TEXAS 760118064 REVISED REVISED REVISED REVISED REVISED REVISED REVISION TO MEETING LOCATION ISSUED ON MAY 1,1997 May 28,1997 i

NOTICE OF LICENSEE MEETING Name of Licensee:

Entergy Operations, Inc Name of Facility:

Waterford 3 Docket:

50-382 4

1 Date and Time May 29,1997 of Meeting:

10 a.m. to noon d

Location of Meeting:

Waterford 3 James M. Cain Entergy Education Center Auditorium Taft, Louisiana l

Purpose of Meeting:

Discuss licensee progresa in implementing their FOCUS Plan NRC Attendees:

E. Mershoff, Regional Administrator K. Perkins,~ Director, Walnut Creek Field Office F. Miralgia, Deputy Director, Office of Nuclear Reactor Regulation (NRR)

P. Harrell, Chief, Project Branch D, Division of Reactor Projects (DRP)

C. Patel, Project Manager, Project Directorate IV-1, NRR L. Keller, Senior Resident inspector, Project Branch D, DRP Licensee Attendees:

C. Dugger, Vice President Operations T. Leonard, General Manager Plant Operations A. Wrape, Director, Design Engineering i

F. Drummond, Director, Site Support E. Ewing, Director, Nuclear Safety D. Matheny, Operations Manager R. Azzarello, Maintenance Manager

/

D. Vinci, Systems Engineering Manager

~7 T. Gaudet, Licensing Manager NOTE:

This meeting is open to attendance by members of the general public, y

J y,\\ n Approved By:

(ru Thomas P. Gwynn,/Dir ctor Division of Reactor jects 9706020114 970528 ADOCK0500g2 PDR P

l Nlillplpl?l

Entergy Operations, Inc. E-Mail To:

FOR

(

)

NRC Attendees PMNS Mtg Announcement Coordinator JKR E. L. Jordan, DEDO PAB H. L. Thompson, DEDR ACT A. C. Thadani, ADT/NRR RPZ R. P. Zimmerman, ADP/NRR OEMAll J. Lieberman, D/OE LJC L. J. Chandler, OGC CAH C. A. Hackney, RSLO DMK1 D. M. Kunihiro, WCFO GFS G. F. Sanborn, EO BWH B. Henderson, PAO MFH2 M. Hammond, PAO JAC1, CMS, CJG RA Secretaries LAT, DLF, CAM 3 DRP Division cc:

[ DMB (IE 45)1)

OEDO RIV Coordinator (17G21)

ORA File RIV File DRP File To receive copy of document. Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:PE:DRP/D C:DRP/D l RSLO l

PAO l

D:DRP l

GEWerner;dif PHHarrell CAHackney BWHenderson TPGwynn 5/28/97 (NA)

(NA)

(NA) 5/28/97 OFFICIAL RECORD COPY