{{#Wiki_filter:- . .     ___      .              _      _      _                  ,
{{#Wiki_filter:-..
b                 ,
b An EDISON INTERNATIOVAL Company i
An EDISON INTERNATIOVAL Company                                                                               ;
May 27,1997
i May 27,1997                                           )
)
Mr. A. T. Howell                                                                                     l Director, Division of Reactor Safety                                                                 j U. S. Nuclear Regulatory Commission                                                                 !
Mr. A. T. Howell Director, Division of Reactor Safety j
611 Ryan Plaza Drive, Suite 400                                                                     l Arlington, TX 76011-8064
U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064


==Subject:==
==Subject:==
Docket Nos. 50-361 and 50-362 Request for Additional Information San Onofre Nuclear Generating Station, Units 2 and 3                         )
Docket Nos. 50-361 and 50-362 Request for Additional Information San Onofre Nuclear Generating Station, Units 2 and 3
)


==Reference:==
==Reference:==
Letter, Mr. A. T. Howell lli (USNRC) to Mr. Harold B. Ray (Edison),
Letter, Mr. A. T. Howell lli (USNRC) to Mr. Harold B. Ray (Edison),
dated May 9,1997 i
dated May 9,1997 i
Your referenced letter transmitted the results of NRC Inspection Report No.                         l 50-361/97-07 and 50-362/97-07, conducted April 7-11,1997, at the San Onofre                         !
Your referenced letter transmitted the results of NRC Inspection Report No.
I Nuclear Generating Station, Units 2 and 3. The letter, also, requested Edison's confirmation of a regulatory commitment.
50-361/97-07 and 50-362/97-07, conducted April 7-11,1997, at the San Onofre Nuclear Generating Station, Units 2 and 3. The letter, also, requested Edison's confirmation of a regulatory commitment.
During the exit meeting on April 11,1997, Edison management confirmed that a security officer would be posted, at the North Security Processing Facility entrance tumstiles, during peak traffic flow periods. Further, the requirement to post the security officer would be made a part of the appropriate Security procedure.
During the exit meeting on April 11,1997, Edison management confirmed that a security officer would be posted, at the North Security Processing Facility entrance tumstiles, during peak traffic flow periods. Further, the requirement to post the security officer would be made a part of the appropriate Security procedure.
On April 24,1997, the encicsed Security Procedure SO123-IV-5.1, " Protected and Vital Area Access," was modified (Temporary Change Notice 5-5), as stated above.
On April 24,1997, the encicsed Security Procedure SO123-IV-5.1, " Protected and Vital Area Access," was modified (Temporary Change Notice 5-5), as stated above.
If you have any questions, please contact me.                                                     )
If you have any questions, please contact me.
Sincerely, G. T. Gibson 9706040329 970527
Sincerely, G. T. Gibson 9706040329 970527 Manager, Compliance PDR ADOCK 0500o361 G
                                        '                      Manager, Compliance PDR       ADOCK 0500o361 G                             PDR
PDR


==Enclosure:==
==Enclosure:==
As stated cc: w/o enclosure                                                  \$$$fl$NINll}}}N!!!!i!!!!
As stated
                                                                                  '''''~
\\$$$fl$NINll}}}N!!!!i!!!! i f,,
g i f, ,
'''''~
                                                                                                /       C Document Control Desk K. E. Perkins, Director, Walnut Creek Field Office, NRC Region IV             .} [U J. A. Sloan, NRC Senior Resident inspector, San Onofre Units 2 and 3 M. B. Fields, NRC Project Manager, San Onofre Units 2 and 3 P. O. Box 128 San Clemente. CA 92674 0128}}
cc: w/o enclosure g
/
C
.} [U Document Control Desk K. E. Perkins, Director, Walnut Creek Field Office, NRC Region IV J. A. Sloan, NRC Senior Resident inspector, San Onofre Units 2 and 3 M. B. Fields, NRC Project Manager, San Onofre Units 2 and 3 P. O. Box 128 San Clemente. CA 92674 0128}}

Latest revision as of 11:45, 11 December 2024

Discusses Which Transmitted Results of Insp Repts 50-361/97-07 & 50-362/97-07 on 970407-11.Security Officer Would Be Posted at North Security Processing Facility Entrance Turnstiles,During Peak Traffic Flow Periods
ML20148F694
Person / Time
Site: San Onofre  
Issue date: 05/27/1997
From: Gibson G
SOUTHERN CALIFORNIA EDISON CO.
To: Howell A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
50-361-97-07, 50-361-97-7, 50-362-97-07, 50-362-97-7, NUDOCS 9706040329
Download: ML20148F694 (1)


Text

-..

b An EDISON INTERNATIOVAL Company i

May 27,1997

)

Mr. A. T. Howell Director, Division of Reactor Safety j

U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064

Subject:

Docket Nos. 50-361 and 50-362 Request for Additional Information San Onofre Nuclear Generating Station, Units 2 and 3

)

Reference:

Letter, Mr. A. T. Howell lli (USNRC) to Mr. Harold B. Ray (Edison),

dated May 9,1997 i

Your referenced letter transmitted the results of NRC Inspection Report No.

50-361/97-07 and 50-362/97-07, conducted April 7-11,1997, at the San Onofre Nuclear Generating Station, Units 2 and 3. The letter, also, requested Edison's confirmation of a regulatory commitment.

During the exit meeting on April 11,1997, Edison management confirmed that a security officer would be posted, at the North Security Processing Facility entrance tumstiles, during peak traffic flow periods. Further, the requirement to post the security officer would be made a part of the appropriate Security procedure.

On April 24,1997, the encicsed Security Procedure SO123-IV-5.1, " Protected and Vital Area Access," was modified (Temporary Change Notice 5-5), as stated above.

If you have any questions, please contact me.

Sincerely, G. T. Gibson 9706040329 970527 Manager, Compliance PDR ADOCK 0500o361 G

PDR

Enclosure:

As stated

\\$$$fl$NINll}N!!!!i!!!! i f,, ~ cc: w/o enclosure g / C .} [U Document Control Desk K. E. Perkins, Director, Walnut Creek Field Office, NRC Region IV J. A. Sloan, NRC Senior Resident inspector, San Onofre Units 2 and 3 M. B. Fields, NRC Project Manager, San Onofre Units 2 and 3 P. O. Box 128 San Clemente. CA 92674 0128}}