ML20148F694: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot change |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:- . . | {{#Wiki_filter:-.. | ||
b | b An EDISON INTERNATIOVAL Company i | ||
An EDISON INTERNATIOVAL Company | May 27,1997 | ||
) | |||
Mr. A. T. Howell | Mr. A. T. Howell Director, Division of Reactor Safety j | ||
611 Ryan Plaza Drive, Suite 400 | U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 | ||
==Subject:== | ==Subject:== | ||
Docket Nos. 50-361 and 50-362 Request for Additional Information San Onofre Nuclear Generating Station, Units 2 and 3 | Docket Nos. 50-361 and 50-362 Request for Additional Information San Onofre Nuclear Generating Station, Units 2 and 3 | ||
) | |||
==Reference:== | ==Reference:== | ||
Letter, Mr. A. T. Howell lli (USNRC) to Mr. Harold B. Ray (Edison), | Letter, Mr. A. T. Howell lli (USNRC) to Mr. Harold B. Ray (Edison), | ||
dated May 9,1997 i | dated May 9,1997 i | ||
Your referenced letter transmitted the results of NRC Inspection Report No. | Your referenced letter transmitted the results of NRC Inspection Report No. | ||
50-361/97-07 and 50-362/97-07, conducted April 7-11,1997, at the San Onofre Nuclear Generating Station, Units 2 and 3. The letter, also, requested Edison's confirmation of a regulatory commitment. | |||
During the exit meeting on April 11,1997, Edison management confirmed that a security officer would be posted, at the North Security Processing Facility entrance tumstiles, during peak traffic flow periods. Further, the requirement to post the security officer would be made a part of the appropriate Security procedure. | During the exit meeting on April 11,1997, Edison management confirmed that a security officer would be posted, at the North Security Processing Facility entrance tumstiles, during peak traffic flow periods. Further, the requirement to post the security officer would be made a part of the appropriate Security procedure. | ||
On April 24,1997, the encicsed Security Procedure SO123-IV-5.1, " Protected and Vital Area Access," was modified (Temporary Change Notice 5-5), as stated above. | On April 24,1997, the encicsed Security Procedure SO123-IV-5.1, " Protected and Vital Area Access," was modified (Temporary Change Notice 5-5), as stated above. | ||
If you have any questions, please contact me. | If you have any questions, please contact me. | ||
Sincerely, G. T. Gibson 9706040329 970527 | Sincerely, G. T. Gibson 9706040329 970527 Manager, Compliance PDR ADOCK 0500o361 G | ||
PDR | |||
==Enclosure:== | ==Enclosure:== | ||
As stated | As stated | ||
\\$$$fl$NINll}}}N!!!!i!!!! i f,, | |||
g | '''''~ | ||
cc: w/o enclosure g | |||
/ | |||
C | |||
.} [U Document Control Desk K. E. Perkins, Director, Walnut Creek Field Office, NRC Region IV J. A. Sloan, NRC Senior Resident inspector, San Onofre Units 2 and 3 M. B. Fields, NRC Project Manager, San Onofre Units 2 and 3 P. O. Box 128 San Clemente. CA 92674 0128}} | |||
Latest revision as of 11:45, 11 December 2024
| ML20148F694 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 05/27/1997 |
| From: | Gibson G SOUTHERN CALIFORNIA EDISON CO. |
| To: | Howell A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 50-361-97-07, 50-361-97-7, 50-362-97-07, 50-362-97-7, NUDOCS 9706040329 | |
| Download: ML20148F694 (1) | |
Text
-..
b An EDISON INTERNATIOVAL Company i
May 27,1997
)
Mr. A. T. Howell Director, Division of Reactor Safety j
U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064
Subject:
Docket Nos. 50-361 and 50-362 Request for Additional Information San Onofre Nuclear Generating Station, Units 2 and 3
)
Reference:
Letter, Mr. A. T. Howell lli (USNRC) to Mr. Harold B. Ray (Edison),
dated May 9,1997 i
Your referenced letter transmitted the results of NRC Inspection Report No.
50-361/97-07 and 50-362/97-07, conducted April 7-11,1997, at the San Onofre Nuclear Generating Station, Units 2 and 3. The letter, also, requested Edison's confirmation of a regulatory commitment.
During the exit meeting on April 11,1997, Edison management confirmed that a security officer would be posted, at the North Security Processing Facility entrance tumstiles, during peak traffic flow periods. Further, the requirement to post the security officer would be made a part of the appropriate Security procedure.
On April 24,1997, the encicsed Security Procedure SO123-IV-5.1, " Protected and Vital Area Access," was modified (Temporary Change Notice 5-5), as stated above.
If you have any questions, please contact me.
Sincerely, G. T. Gibson 9706040329 970527 Manager, Compliance PDR ADOCK 0500o361 G
Enclosure:
As stated
\\$$$fl$NINll}N!!!!i!!!! i f,, ~ cc: w/o enclosure g / C .} [U Document Control Desk K. E. Perkins, Director, Walnut Creek Field Office, NRC Region IV J. A. Sloan, NRC Senior Resident inspector, San Onofre Units 2 and 3 M. B. Fields, NRC Project Manager, San Onofre Units 2 and 3 P. O. Box 128 San Clemente. CA 92674 0128}}