==SUMMARY==
==SUMMARY==
OF
OF j-6 110NTHLY OPERATING EXPERIENCE
              *~
*~
6                                      110NTHLY OPERATING EXPERIENCE UNIT I FEBRUARY, 1988 February 1     ~ The Unit remained -shutdown for refueling.
UNIT I FEBRUARY, 1988 February 1
through February 4 February 5       At 1255 hours, the Unit entered Mode 5.
~ The Unit remained -shutdown for refueling.
February 6       The Unit remained in Mode 5.
through February 4 February 5 At 1255 hours, the Unit entered Mode 5.
through February 22 February 23       At 0200 hours , the Unit entered Mode 4.
February 6 The Unit remained in Mode 5.
February 24       At 0736 hours, the Unit entered Mode 3.
through February 22 February 23 At 0200 hours, the Unit entered Mode 4.
,                  February 25       The Unit remained in Mode 3.
February 24 At 0736 hours, the Unit entered Mode 3.
through February 27 february 28     At 1332 hours, the Unit entered Mode 2.
February 25 The Unit remained in Mode 3.
February 29     The Unit remained in ibde 2.
through February 27 february 28 At 1332 hours, the Unit entered Mode 2.
February 29 The Unit remained in ibde 2.
I'
I'
(
(
I
I n
                                                      ~~
~~
p     n ry       j 68033OO32ces3fo34 ADOCK 050                                                 s
p ry j
{DR              DCD f
68033OO32ces3fo34
{DR ADOCK 050 s
DCD f


      ,                                                AVERAGE DAILi UNIT POWER LEVEL f
AVERAGE DAILi UNIT POWER LEVEL f
DOCKET NO.       30-33'~
DOCKET NO.
UNIT     3'.~' S t.*ni: Jl DATE March 10, 1988 COMPLETED SY       M.A. Winge n TELEPHONE       (412) 643-1825 MONTH       February, 1988 DAY       AVERAGE DAILY POWER LIVEL                       DAY       AVERAGE DALLY POWER LIVEL IM We, Net)                                               (MWe-Net:
30-33'~
I                       O g7                     0 2                      0                               ;g                       0 3                       0                                                         0 39 4                       0                                                          0
UNIT 3'.~' S t.*ni: Jl DATE March 10, 1988 COMPLETED SY M.A. Winge n TELEPHONE (412) 643-1825 MONTH February, 1988 DAY AVERAGE DAILY POWER LIVEL DAY AVERAGE DALLY POWER LIVEL IM We, Net)
:0 I                       O                                                         0 21                                          ,
(MWe-Net:
n 6
I O
n                       0 1                       0                                                        0 y
0 g7 2
8                       0                                                         o 24 9                       0                                                         o 10                         0                                                         0 26 O                                                         0 lI                                                        y 12                         0                                                         o 13                         0                                                         0 39 14                         0                                                       N/A 30 13                         0 3{                     N/A 16                         0 j
0 0
l l
;g 3
INSTRUCTIONS On this format. !at the average hiv anit power le.et :n MWe Net yr esch day .n the reentrine month. C.onnuie na the nearest unule mepwait.
0 39 0
4 0
:0 0
I O
21 0
6 n
n 0
0 1
0 y
8 0
o 24 9
0 o
10 0
0 26 lI O
y 0
12 0
o 13 0
39 0
14 0
30 N/A 13 0
3{
N/A 16 0
j l
INSTRUCTIONS On this format. !at the average hiv anit power le.et :n MWe Net yr esch day.n the reentrine month. C.onnuie na the nearest unule mepwait.
14I77) i
14I77) i


_m. . .       _,
_m...
UNIT SilUIDOWNS AND POWER REDUCTIONS                                                                                                   IMKKE T NO. 314 UNIT NAME   8VPS U881L Il DATE - March 10 1988 REPOR T .'f0NIH February, 1988                                                                       COMrLETEla ny                               M.A. Winger TELLFIlONE     (412) 643-18_25 c^
UNIT SilUIDOWNS AND POWER REDUCTIONS IMKKE T NO. 314 UNIT NAME 8VPS U881L Il DATE - March 10 1988 REPOR T.'f0NIH February, 1988 COMrLETEla ny M.A. Winger TELLFIlONE (412) 643-18_25 "s.
                                                                                                                              "s.
c^
s'   ".O oa ci No.
s'
c 0St         1.icensee         ,,
".O oa ci 0St 1.icensee c
Date     "a                                       %o     3U2           Event         0e     o Cause & Corrective S
No.
H                                    Q
Date "a
                                                                                                                $5   "
%o 3U2 Event 0e Cause & Corrective o
I sS*         Report #        =g        0 Action to j"$                         m     o                                                           Prevent Recurrence o
S
ca 2         880201       S                                   696       C     4           N/A         ZZ     ZZZZZZ The Unit remained shutdown the entire month of the Unit's Sixth Refueling e
$5 I
Outage.
sS*
u i
Action to j"$
1                     2
=g 0
.                                            I I a.ed             Reas*"'                                                               3                                                                                   4 5 Si hcJu c l 8
Report #
A F.guipmens f~ailuse (I spliint Hethod:                                                                                                        1.shebes G - Insisus si.=is 1-Manual                                                                                                       l'" PacI'38 J8k"' "8 DJ8J B Maintenante e.e Test 2-Manual Scree                                                                                                 I naes Sliccas I.u I mesisec r RefuelinK                                                               3-Automatte scram
H Q
: 1) Regulataeg Hesiskti."'                                                                                                                                                                I sen Rq we e! I H s I sic t NtINI G I th.ceae u Tealning A lesense I sananatioet                             4-Continued Fros Previous Month                                                                              (1891) i AJuunasse.nesvc                                                         5-metuction
Prevent Recurrence m
: t. Ogicsate.nul I es.u ll mgilanel 9-Other                                                                      5                                                      .
o o
l'8/ U )                 II(hiecsiI spla .I                                                                                                                                                                     Isinhos1 Sann-N.ne.c a
ca 2
880201 S
696 C
4 N/A ZZ ZZZZZZ The Unit remained shutdown the entire month of the Unit's Sixth Refueling Outage.
eu i
1 2
I I a.ed Reas*"'
3 4
5 Si hcJu c l Hethod:
8 A F.guipmens f~ailuse (I spliint 1.shebes G - Insisu si.=is s
1-Manual B Maintenante e.e Test l'" PacI'38 J8k"' "8 DJ8J 2-Manual Scree I naes Sliccas I.u I mesisec r RefuelinK 3-Automatte scram I sen Rq we e! I H s I sic t NtINI G
: 1) Regulataeg Hesiskti."'
4-Continued Fros Previous Month (1891)
I th.ceae u Tealning A lesense I sananatioet i AJuunasse.nesvc 5-metuction 9-Other 5
: t. Ogicsate.nul I es.u ll mgilanel l'8/ U )
II(hiecsiI spla.I Isinhos1 Sann-N.ne.c a


                                                  =___.       .__          ,-      .          __ . __            . -
=___.
y.- .
y.-
OPERATING DATA REPORT DOCKET NO.:       50 334 REPORT DATE: 03/10/88 COMPLETED BY: M.A. WINGER TELEPHONE:         (412) 643 1825 OPERATING STATUS
OPERATING DATA REPORT DOCKET NO.:
: 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1             Notes
50 334 REPORT DATE: 03/10/88 COMPLETED BY: M.A. WINGER TELEPHONE:
(412) 643 1825 OPERATING STATUS
: 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
: 2. REPORTING PERIOD: FEBRUARY 1988
: 2. REPORTING PERIOD: FEBRUARY 1988
: 3. LICENSED THERMAL POWER (MWt):                 2660
: 3. LICENSED THERMAL POWER (MWt):
: 4. NAMEPLATE RATING (Grose MWe):                   923
2660
: 5. DESIGN ELECTRICAL RATING (Net MWe):             835
: 4. NAMEPLATE RATING (Grose MWe):
: 6. MAX. DEPENDABLE CAPACITY (Gross MWe):           860.
923
: 7. MAX. DEPENDABLE CAPACITY (Net MWe):             810
: 5. DESIGN ELECTRICAL RATING (Net MWe):
835
: 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
860.
: 7. MAX. DEPENDABLE CAPACITY (Net MWe):
810
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):                     None
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
: 10. REASONS FOR RESTRICTIONS, IF ANY:                                       N/A THIS MONTH         YEAR TO DATE               CUMULATIVE
None
: 11. HOURS IN REPORTING PERIOD:                       696.0                 1440.0             103728'.0
: 10. REASONS FOR RESTRICTIONS, IF ANY:
: 12. NO. OF HRS. REACTOR WAS CRITICAL:                   0.0                   0.0               59184.2
N/A THIS MONTH YEAR TO DATE CUMULATIVE
: 13. REACTOR RESERVE SHUTDOWN HOURS:                     0.0                   0.0               4482.8
: 11. HOURS IN REPORTING PERIOD:
: 14. HOURS GENERATOR WAS ON LINE:                         0.0                   0.0               57654.2
696.0 1440.0 103728'.0
: 15. UNIT RESERVE SHUTDOWN HOURS:                         0.0                   0.0                   0.0
: 12. NO. OF HRS. REACTOR WAS CRITICAL:
: 16. GROSS THERMAL ENERGY GEN. (MWH):                     0.0                   0.0           136917319.5
0.0 0.0 59184.2
: 17. GROSS ELECT. ENERGY GEN. (MWH):                     0.0                   0.0           43865720.0
: 13. REACTOR RESERVE SHUTDOWN HOURS:
: 18. NET ELECTRICAL ENERGY GEN. (MWH):             -7720.0               -10920.0             40914773.0
0.0 0.0 4482.8
: 19. UNIT SERVICE FACTOR: (PERCENT)                       0.0                   0.0                 57.9
: 14. HOURS GENERATOR WAS ON LINE:
: 20. UNIT AVAILABILITY FACTOR:(PERCENT)                   0.0                   0.0                 57.9
0.0 0.0 57654.2
: 21. UNIT CAPACITY FACTOR (MDC): PCT                       0.0                   0.0                 51.9
: 15. UNIT RESERVE SHUTDOWN HOURS:
: 22. UNIT CAPACITY FACTOR (DER): PCT                       0.0                   0.0                 50.4
0.0 0.0 0.0
: 23. UNIT FORCED OUTAGE RATE: (PERCENT)                   0.0                   0.0                 19.7 24   SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE, AND DURATION OF EACH):
: 16. GROSS THERMAL ENERGY GEN. (MWH):
0.0 0.0 136917319.5
: 17. GROSS ELECT. ENERGY GEN. (MWH):
0.0 0.0 43865720.0
: 18. NET ELECTRICAL ENERGY GEN. (MWH):
-7720.0
-10920.0 40914773.0
: 19. UNIT SERVICE FACTOR: (PERCENT) 0.0 0.0 57.9
: 20. UNIT AVAILABILITY FACTOR:(PERCENT) 0.0 0.0 57.9
: 21. UNIT CAPACITY FACTOR (MDC): PCT 0.0 0.0 51.9
: 22. UNIT CAPACITY FACTOR (DER): PCT 0.0 0.0 50.4
: 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 19.7 24 SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE, AND DURATION OF EACH):
N/A
N/A
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:                         MAR 2.1988
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
MAR 2.1988
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST         ACHIEVED                   :
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A i
INITIAL CRITICALITY                           N/A             N/A                   l INITIAL ELECTRICITY                           N/A             N/A                   i COMMERCIAL OPERATION                           N/A             N/A 1
COMMERCIAL OPERATION N/A N/A 1


F=-
F=-
1                                                       NARRATIVE  
1 NARRATIVE  


==SUMMARY==
==SUMMARY==
OF b
OF b
MONTHLY OPERATING EXPERIENCE UNIT II FEBRUARY, 1988 February 1     'The Unit remained shutdown for maintenance.
MONTHLY OPERATING EXPERIENCE UNIT II FEBRUARY, 1988 February 1
through February 9 February 10       The reactor was taken critical at 1123 hours.. At 1300 hours, the reactor was shutdown to repair Pressurizer PORY Isolation Valve (RCS-MOV537).
'The Unit remained shutdown for maintenance.
February 11       The Unit remained shutdown.
through February 9 February 10 The reactor was taken critical at 1123 hours.. At 1300 hours, the reactor was shutdown to repair Pressurizer PORY Isolation Valve (RCS-MOV537).
February 12       The reactor was taken critical at 1903 hours.
February 11 The Unit remained shutdown.
February 13       The Unit was synchronized at 0614 hours and power was escala ted to a nominal value of 45% to . permit s team gene ra tor level trip setpoint adjustments. At                 1300 hours, a power escalation toward 95% was initiated.
February 12 The reactor was taken critical at 1903 hours.
February 14       The Unit operated at a nominal value of 100% output.
February 13 The Unit was synchronized at 0614 hours and power was escala ted to a nominal value of 45% to. permit s team gene ra tor level trip setpoint adjustments. At 1300 hours, a power escalation toward 95% was initiated.
through February 16 February 17       At 2104 hours, the Unit's output was reduced to 75% to permit leak testing of the 'D' waterbox of the Unit's main condenser.
February 14 The Unit operated at a nominal value of 100% output.
February 18       At 0910 hours,               the Uni t's output was       increased-to approximately 87%.
through February 16 February 17 At 2104 hours, the Unit's output was reduced to 75% to permit leak testing of the 'D' waterbox of the Unit's main condenser.
February 19       At 0310 hours, leak testing of the Unit's main condenser was complete and a power escalation toward 100% output was       i ni tia ted . At 0950 hours, the Unit's output was reduced           to 85% to       pe rmi t leak testing of the 'O' waterbox of the Uni t's main condenser. At 1205 hours, power was reduced to 60% tc remove the 'B' Main Feed Pump from service for maintenance.
February 18 At 0910 hours, the Uni t's output was increased-to approximately 87%.
February 20       The Unit operated at a naninal value of 60%' output.
February 19 At 0310 hours, leak testing of the Unit's main condenser was complete and a power escalation toward 100% output was i ni tia ted.
through February 21 February 22       At 0520 hours, the Startup ' Feed Pump was placed in service and power was escalated                   to a nominal value of 80%.         At 1145 hours , the 'B' Main feed Pump was returned to service and power was increased to a nominal value of 100% output.
At 0950 hours, the Unit's output was reduced to 85% to pe rmi t leak testing of the
Februa ry 23     The Unit operated at a nominal value nf 100% output, through February 29
'O' waterbox of the Uni t's main condenser.
At 1205 hours, power was reduced to 60% tc remove the 'B' Main Feed Pump from service for maintenance.
February 20 The Unit operated at a naninal value of 60%' output.
through February 21 February 22 At 0520 hours, the Startup ' Feed Pump was placed in service and power was escalated to a nominal value of 80%.
At 1145 hours, the 'B' Main feed Pump was returned to service and power was increased to a nominal value of 100% output.
Februa ry 23 The Unit operated at a nominal value nf 100% output, through February 29 -


Ri -                                                 AVERAGE DAILY UNIT POWER LEVE1.
Ri -
DOCKET NO. 50-412
AVERAGE DAILY UNIT POWER LEVE1.
                                            .                                                                                    (JNgr BVPS Unit 2 DATE March 10, 1988 COMPLETED SY   M.A. Winner TELEPHONE   (412) 643 1825 MONTil       February, 1988 DAY         AVERACE DAILY POWER LEVEL                       DAY         AVERAGE DAILY POWER LEVEL I M W'-N 'il                                                                       iMWe-Net 1                     0                                                                                 802 17 2                     0                                                                                 668 13 3                     0                                                                               623 19 4                     0                                                                               447
DOCKET NO.
                                                            .                30 5
50-412 (JNgr BVPS Unit 2 DATE March 10, 1988 COMPLETED SY M.A. Winner TELEPHONE (412) 643 1825 MONTil February, 1988 DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL I M W'-N 'il iMWe-Net 1
0                                                                               453 6                     0                                                                               655
0 17 802 2
                                                                            .,                                                                      i 7                   _0                                   :3                                           823 3                       0
0 13 668 3
:4                                           818 9                       0                                                                               818 is 10                       0                                                                               814 26 ll                       0 27                                           814 0
0 19 623 4
12                                                                                                        818 13                       290                                                                               814 39 14                       802 ja                                             N/A is                       818                                                                               N/A 3                                                                ,
0 447 30 5
16                       822 INSTRUCTIONS On this format.!tst the actne d::ily unit :n ser :r.e!:n Mwe Nei tar esch day in the recurring monen.C..mnute                       u e the nearest whvie mepwatt.
0 453 6
(4177)
0 655 i
7
_0 823
:3 3
0
:4 818 9
0 is 818 10 0
26 814 ll 0
27 814 12 0
818 13 290 814 39 14 802 ja N/A is 818 3
N/A 16 822 INSTRUCTIONS On this format.!tst the actne d::ily unit :n ser :r.e!:n Mwe Nei tar esch day in the recurring monen.C..mnute e u
the nearest whvie mepwatt.
(4177) ____


g"-~     q UNII SIIU1 DOWNS AND POWER REIMETIONS                         DOCKE T NO. 50-412 UNIT NAME BVPS IInit 2 f)A TE March 10, 19ss i                                                                                                                                 REPOR T MONIH February, 1988                     COMPLE TEg) gy       M.A. Winger IEl EPflONE (412) 643-1825 m
g"-~
'                                                                                                                          be
q UNII SIIU1 DOWNS AND POWER REIMETIONS DOCKE T NO. 50-412 UNIT NAME BVPS IInit 2 f)A TE March 10, 19ss i
:: n                   % ee o oa         **
REPOR T MONIH February, 1988 COMPLE TEg) gy M.A. Winger IEl EPflONE (412) 643-1825 m
c            0$%             Licensee             a                       Cause & Corrective No.         Date                                                   ".      %$            2       3UE                   Event             8
be
                                                                                                                                                          . E R
:: n
H      A
% ee o oa 0$%
                                                                                        $3           "
Licensee c
I      sS*                 Report #           %      kS a
a Cause & Corrective No.
Action to
Date 2
'                                                                                                            j"S                                   m       o                   Prevent Recurrence o
3UE Event 8
kS E
Action to R
$3 I
sS*
Report #
a H
A j"S Prevent Recurrence m
o o
ca i
ca i
3       880201                                                     S       229         B                   4             N/A           CA     VESSEL     Perform maintenance on a leaking pressurizer manway.
3 880201 S
la     4       880210                                                     F       65.2         A                   1           N/A           CA     VALVEX The reactor was shutdown to repair pressurizer PORV Isolation Valve
229 B
4 N/A CA VESSEL Perform maintenance on a leaking pressurizer manway.
la 4
880210 F
65.2 A
1 N/A CA VALVEX The reactor was shutdown to repair pressurizer PORV Isolation Valve
[RCS-MOV537).
[RCS-MOV537).
5       880217                                                     F         0           B                   5           N/A             HC     ZZZZZZ     Reduced output to 75% to permit leak testing the 'D'     waterbox of the Unit's main condenser.
5 880217 F
!        6       880219                                                     F         0           B                   5           N/A             IIC 4
0 B
ZZZZZZ     Reduced output to 85% to permit leak testing of the     'D'   waterbox of the Unit's main condenser.
5 N/A HC ZZZZZZ Reduced output to 75% to permit leak testing the
7       880219                                                     F         0           B                   5           N/A           Cll     PUMPXX     Power was reduced from 85% to 60% to permit the   'B' main feed pump's removal from service for maintenance.
'D' waterbox of the Unit's main condenser.
I I                                                                   2 I I n.cd                                                         Reasnes 3                                        4 5 Ss heJu't.I                                                                                                                     n,ehad:
6 880219 F
A Fquipmens failure (i = plaint                                                                           1.sluks G Insiiniti.=es
0 B
: a. Menu 11                                 f.n Pserd8d'8 a' "8 lla'a R Maint anse e r Test C Refiseling 2-Manua1 Scree                             I ness Shcess 8.n I hcasce 3_a,eo., tic Ser==                         IscueR.p. ealiMiIsictNIINIG D NcF''l8'''') Rc5'' k'i.*                                     4-Continued From Previous Month           014 13 I th.csaine Isainnig A I escuse I saminae"*
5 N/A IIC ZZZZZZ Reduced output to 85% to permit leak 4
i Adeissnesse.neeve 5-lietuc t t on 9-Other                               5
testing of the
: t. Ogweais. nut I is..a il aplane t                                                                                       .
'D' waterbox of the Unit's main condenser.
l'8/77)                                                               11 Oslice i1.pl. san t                                                                                     I shibst I 5enw %ense e
7 880219 F
i
0 B
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _                                _ _ _ _ _ _      _ _m                                  .
5 N/A Cll PUMPXX Power was reduced from 85% to 60% to permit the
'B' main feed pump's removal from service for maintenance.
I I
2 3
4 I I n.cd Reasnes n,ehad:
1.sluks G Insiiniti.=es 5 Ss heJu't.I A Fquipmens failure (i = plaint
: a. Menu 11 R Maint anse e r Test f.n Pserd8d'8 a' "8 lla'a 2-Manua1 Scree I ness Shcess 8.n I hcasce C Refiseling 3_a,eo., tic Ser==
IscueR.p. ealiMiIsictNIINIG D NcF''l8'''') Rc5'' k'i.*
4-Continued From Previous Month 014 13 I th.csaine Isainnig A I escuse I saminae"*
5-lietuc t t on i Adeissnesse.neeve 9-Other 5
: t. Ogweais. nut I is..a il aplane t I shibst I 5enw %ense l'8/77) 11 Oslice i1.pl. san t e
i m


  ',      . f-4
f-4 o.
: o.         \
\\
OPERATING DATA REPORT DOCKET NO.:                   50 412 REPORT DATE: 03/10/88 COMPLETED BY: M.A.WINGER TELEPHONE:                     (412) 643-1825 OPERATING STATUS
OPERATING DATA REPORT DOCKET NO.:
: 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2         Notes
50 412 REPORT DATE: 03/10/88 COMPLETED BY: M.A.WINGER TELEPHONE:
(412) 643-1825 OPERATING STATUS
: 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
: 2. REPORTING PERIOD: FEBRUARY 1988
: 2. REPORTING PERIOD: FEBRUARY 1988
: 3. LICENSED THERMAL POWER (MWt):               2660
: 3. LICENSED THERMAL POWER (MWt):
: 4. NAMEPLATE RATING (Gross MWe):                 923
2660
: 5. DESIGN ELECTRICAL RATING (Net MWe):           836
: 4. NAMEPLATE RATING (Gross MWe):
: 6. MAX. DEPENDABLE CAPACITY (Gross MWe):         885
923
: 7. MAX. DEPENDABLE CAPACITY (Net MWe):           833
: 5. DESIGN ELECTRICAL RATING (Net MWe):
836
: 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
885
: 7. MAX. DEPENDABLE CAPACITY (Net MWe):
833
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE 1AST REPORT, GIVE REASONS:
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE 1AST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):                           None
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
: 10. REASONS FOR RESTRICTIONS, IF ANY:                                             N/A THIS MONTH       YEAR TO DATE                     CUMULATIVE
None
: 11. HOURS IN REPORTING PERICD:                   696.0                           1440.0           2511.0                 i
: 10. REASONS FOR RESTRICTIONS, IF ANY:
: 12. NO. OF RRS. REACTOR WAS CRITICAL:             414.6                           1040.5           2006.0
N/A THIS MONTH YEAR TO DATE CUMULATIVE
: 13. REACTOR RESERVE SHUTDOWN HOURS:                   0.0                             0.0                     0.0
: 11. HOURS IN REPORTING PERICD:
: 14. hdURS GENERATOR WAS ON LINE:                   401.8                           1027.7           1977.5
696.0 1440.0 2511.0
: 15. UNIT RESERVE SHUTDOWN HOURS:                     0.0                             0.0                     0.0
: 12. NO. OF RRS. REACTOR WAS CRITICAL:
: 16. GROSS THERMAL ENERGY GEN. (MWH):           948305.0           2595823.0                     4981460.4
414.6 1040.5 2006.0 i
: 17. GROSS ELECT. ENERGY GEN. (MWH):           307600.0               843400.0                 1625600.0
: 13. REACTOR RESERVE SHUTDOWN HOURS:
: 18. NET ELECTRICAL ENERGY GEN. (MWH):         285646.0               792196.0                 1530300.0
0.0 0.0 0.0
: 19. UNIT SERVICE FACTOR: (PERCENT)                 57.7                             71.4                 73.8
: 14. hdURS GENERATOR WAS ON LINE:
: 20. UNIT AVAILABILITY FACTOR:(PERCENT)             57.7                             71.4                 78.8
401.8 1027.7 1977.5
: 21. UNIT CAPACITY FACTOR (MDC): PCT                 49.3                             66.0                 73.2             )
: 15. UNIT RESERVE SHUTDOWN HOURS:
: 22. UNIT CAPACITY FACTOR (DER):PCf                   49.1                             65.8               172.9             I
0.0 0.0 0.0
: 23. UNIT FORCED OUTAGE RATE: (PERCENT)               14.0                             6.0                   9.0 24 SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE AND DURATION OF EACH):
: 16. GROSS THERMAL ENERGY GEN. (MWH):
948305.0 2595823.0 4981460.4
: 17. GROSS ELECT. ENERGY GEN. (MWH):
307600.0 843400.0 1625600.0
: 18. NET ELECTRICAL ENERGY GEN. (MWH):
285646.0 792196.0 1530300.0
: 19. UNIT SERVICE FACTOR: (PERCENT) 57.7 71.4 73.8
: 20. UNIT AVAILABILITY FACTOR:(PERCENT) 57.7 71.4 78.8
: 21. UNIT CAPACITY FACTOR (MDC): PCT 49.3 66.0 73.2
: 22. UNIT CAPACITY FACTOR (DER):PCf 49.1 65.8 172.9 I
)
: 23. UNIT FORCED OUTAGE RATE: (PERCENT) 14.0 6.0 9.0 24 SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE AND DURATION OF EACH):
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST                     ACHIEVED INITIAL CRITICALITY                     N/A                         N/A INITIAL ELECTRICITY                     N/A                         N/A COMMERCIAL OPERATION                     N/A                         N/A j}}
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A..... _
j}}

Latest revision as of 11:21, 11 December 2024

Monthly Operating Repts for Feb 1988
ML20148J589
Person / Time
Site: Beaver Valley
Issue date: 02/29/1988
From: Winger M
DUQUESNE LIGHT CO.
To:
Shared Package
ML20148J593 List:
References
NUDOCS 8803300320
Download: ML20148J589 (8)


Text

_ _.

=.

. - ~ _.

/,

NARRATIVE

SUMMARY

OF j-6 110NTHLY OPERATING EXPERIENCE

  • ~

UNIT I FEBRUARY, 1988 February 1

~ The Unit remained -shutdown for refueling.

through February 4 February 5 At 1255 hours0.0145 days <br />0.349 hours <br />0.00208 weeks <br />4.775275e-4 months <br />, the Unit entered Mode 5.

February 6 The Unit remained in Mode 5.

through February 22 February 23 At 0200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br />, the Unit entered Mode 4.

February 24 At 0736 hours0.00852 days <br />0.204 hours <br />0.00122 weeks <br />2.80048e-4 months <br />, the Unit entered Mode 3.

February 25 The Unit remained in Mode 3.

through February 27 february 28 At 1332 hours0.0154 days <br />0.37 hours <br />0.0022 weeks <br />5.06826e-4 months <br />, the Unit entered Mode 2.

February 29 The Unit remained in ibde 2.

I'

(

I n

~~

p ry j

68033OO32ces3fo34

{DR ADOCK 050 s

DCD f

AVERAGE DAILi UNIT POWER LEVEL f

DOCKET NO.

30-33'~

UNIT 3'.~' S t.*ni: Jl DATE March 10, 1988 COMPLETED SY M.A. Winge n TELEPHONE (412) 643-1825 MONTH February, 1988 DAY AVERAGE DAILY POWER LIVEL DAY AVERAGE DALLY POWER LIVEL IM We, Net)

(MWe-Net:

I O

0 g7 2

0 0

g 3

0 39 0

4 0

0 0

I O

21 0

6 n

n 0

0 1

0 y

8 0

o 24 9

0 o

10 0

0 26 lI O

y 0

12 0

o 13 0

39 0

14 0

30 N/A 13 0

3{

N/A 16 0

j l

INSTRUCTIONS On this format. !at the average hiv anit power le.et :n MWe Net yr esch day.n the reentrine month. C.onnuie na the nearest unule mepwait.

14I77) i

_m...

UNIT SilUIDOWNS AND POWER REDUCTIONS IMKKE T NO. 314 UNIT NAME 8VPS U881L Il DATE - March 10 1988 REPOR T.'f0NIH February, 1988 COMrLETEla ny M.A. Winger TELLFIlONE (412) 643-18_25 "s.

c^

s'

".O oa ci 0St 1.icensee c

No.

Date "a

%o 3U2 Event 0e Cause & Corrective o

S

$5 I

sS*

Action to j"$

=g 0

Report #

H Q

Prevent Recurrence m

o o

ca 2

880201 S

696 C

4 N/A ZZ ZZZZZZ The Unit remained shutdown the entire month of the Unit's Sixth Refueling Outage.

eu i

1 2

I I a.ed Reas*"'

3 4

5 Si hcJu c l Hethod:

8 A F.guipmens f~ailuse (I spliint 1.shebes G - Insisu si.=is s

1-Manual B Maintenante e.e Test l'" PacI'38 J8k"' "8 DJ8J 2-Manual Scree I naes Sliccas I.u I mesisec r RefuelinK 3-Automatte scram I sen Rq we e! I H s I sic t NtINI G

1) Regulataeg Hesiskti."'

4-Continued Fros Previous Month (1891)

I th.ceae u Tealning A lesense I sananatioet i AJuunasse.nesvc 5-metuction 9-Other 5

t. Ogicsate.nul I es.u ll mgilanel l'8/ U )

II(hiecsiI spla.I Isinhos1 Sann-N.ne.c a

=___.

y.-

OPERATING DATA REPORT DOCKET NO.:

50 334 REPORT DATE: 03/10/88 COMPLETED BY: M.A. WINGER TELEPHONE:

(412) 643 1825 OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
2. REPORTING PERIOD: FEBRUARY 1988
3. LICENSED THERMAL POWER (MWt):

2660

4. NAMEPLATE RATING (Grose MWe):

923

5. DESIGN ELECTRICAL RATING (Net MWe):

835

6. MAX. DEPENDABLE CAPACITY (Gross MWe):

860.

7. MAX. DEPENDABLE CAPACITY (Net MWe):

810

8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):

None

10. REASONS FOR RESTRICTIONS, IF ANY:

N/A THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD:

696.0 1440.0 103728'.0

12. NO. OF HRS. REACTOR WAS CRITICAL:

0.0 0.0 59184.2

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 4482.8

14. HOURS GENERATOR WAS ON LINE:

0.0 0.0 57654.2

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. GROSS THERMAL ENERGY GEN. (MWH):

0.0 0.0 136917319.5

17. GROSS ELECT. ENERGY GEN. (MWH):

0.0 0.0 43865720.0

18. NET ELECTRICAL ENERGY GEN. (MWH):

-7720.0

-10920.0 40914773.0

19. UNIT SERVICE FACTOR: (PERCENT) 0.0 0.0 57.9
20. UNIT AVAILABILITY FACTOR:(PERCENT) 0.0 0.0 57.9
21. UNIT CAPACITY FACTOR (MDC): PCT 0.0 0.0 51.9
22. UNIT CAPACITY FACTOR (DER): PCT 0.0 0.0 50.4
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 19.7 24 SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE, AND DURATION OF EACH):

N/A

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

MAR 2.1988

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A i

COMMERCIAL OPERATION N/A N/A 1

F=-

1 NARRATIVE

SUMMARY

OF b

MONTHLY OPERATING EXPERIENCE UNIT II FEBRUARY, 1988 February 1

'The Unit remained shutdown for maintenance.

through February 9 February 10 The reactor was taken critical at 1123 hours0.013 days <br />0.312 hours <br />0.00186 weeks <br />4.273015e-4 months <br />.. At 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br />, the reactor was shutdown to repair Pressurizer PORY Isolation Valve (RCS-MOV537).

February 11 The Unit remained shutdown.

February 12 The reactor was taken critical at 1903 hours0.022 days <br />0.529 hours <br />0.00315 weeks <br />7.240915e-4 months <br />.

February 13 The Unit was synchronized at 0614 hours0.00711 days <br />0.171 hours <br />0.00102 weeks <br />2.33627e-4 months <br /> and power was escala ted to a nominal value of 45% to. permit s team gene ra tor level trip setpoint adjustments. At 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br />, a power escalation toward 95% was initiated.

February 14 The Unit operated at a nominal value of 100% output.

through February 16 February 17 At 2104 hours0.0244 days <br />0.584 hours <br />0.00348 weeks <br />8.00572e-4 months <br />, the Unit's output was reduced to 75% to permit leak testing of the 'D' waterbox of the Unit's main condenser.

February 18 At 0910 hours0.0105 days <br />0.253 hours <br />0.0015 weeks <br />3.46255e-4 months <br />, the Uni t's output was increased-to approximately 87%.

February 19 At 0310 hours0.00359 days <br />0.0861 hours <br />5.125661e-4 weeks <br />1.17955e-4 months <br />, leak testing of the Unit's main condenser was complete and a power escalation toward 100% output was i ni tia ted.

At 0950 hours0.011 days <br />0.264 hours <br />0.00157 weeks <br />3.61475e-4 months <br />, the Unit's output was reduced to 85% to pe rmi t leak testing of the

'O' waterbox of the Uni t's main condenser.

At 1205 hours0.0139 days <br />0.335 hours <br />0.00199 weeks <br />4.585025e-4 months <br />, power was reduced to 60% tc remove the 'B' Main Feed Pump from service for maintenance.

February 20 The Unit operated at a naninal value of 60%' output.

through February 21 February 22 At 0520 hours0.00602 days <br />0.144 hours <br />8.597884e-4 weeks <br />1.9786e-4 months <br />, the Startup ' Feed Pump was placed in service and power was escalated to a nominal value of 80%.

At 1145 hours0.0133 days <br />0.318 hours <br />0.00189 weeks <br />4.356725e-4 months <br />, the 'B' Main feed Pump was returned to service and power was increased to a nominal value of 100% output.

Februa ry 23 The Unit operated at a nominal value nf 100% output, through February 29 -

Ri -

AVERAGE DAILY UNIT POWER LEVE1.

DOCKET NO.

50-412 (JNgr BVPS Unit 2 DATE March 10, 1988 COMPLETED SY M.A. Winner TELEPHONE (412) 643 1825 MONTil February, 1988 DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL I M W'-N 'il iMWe-Net 1

0 17 802 2

0 13 668 3

0 19 623 4

0 447 30 5

0 453 6

0 655 i

7

_0 823

3 3

0

4 818 9

0 is 818 10 0

26 814 ll 0

27 814 12 0

818 13 290 814 39 14 802 ja N/A is 818 3

N/A 16 822 INSTRUCTIONS On this format.!tst the actne d::ily unit :n ser :r.e!:n Mwe Nei tar esch day in the recurring monen.C..mnute e u

the nearest whvie mepwatt.

(4177) ____

g"-~

q UNII SIIU1 DOWNS AND POWER REIMETIONS DOCKE T NO. 50-412 UNIT NAME BVPS IInit 2 f)A TE March 10, 19ss i

REPOR T MONIH February, 1988 COMPLE TEg) gy M.A. Winger IEl EPflONE (412) 643-1825 m

be

n

% ee o oa 0$%

Licensee c

a Cause & Corrective No.

Date 2

3UE Event 8

kS E

Action to R

$3 I

sS*

Report #

a H

A j"S Prevent Recurrence m

o o

ca i

3 880201 S

229 B

4 N/A CA VESSEL Perform maintenance on a leaking pressurizer manway.

la 4

880210 F

65.2 A

1 N/A CA VALVEX The reactor was shutdown to repair pressurizer PORV Isolation Valve

[RCS-MOV537).

5 880217 F

0 B

5 N/A HC ZZZZZZ Reduced output to 75% to permit leak testing the

'D' waterbox of the Unit's main condenser.

6 880219 F

0 B

5 N/A IIC ZZZZZZ Reduced output to 85% to permit leak 4

testing of the

'D' waterbox of the Unit's main condenser.

7 880219 F

0 B

5 N/A Cll PUMPXX Power was reduced from 85% to 60% to permit the

'B' main feed pump's removal from service for maintenance.

I I

2 3

4 I I n.cd Reasnes n,ehad:

1.sluks G Insiiniti.=es 5 Ss heJu't.I A Fquipmens failure (i = plaint

a. Menu 11 R Maint anse e r Test f.n Pserd8d'8 a' "8 lla'a 2-Manua1 Scree I ness Shcess 8.n I hcasce C Refiseling 3_a,eo., tic Ser==

IscueR.p. ealiMiIsictNIINIG D NcFl8') Rc5 k'i.*

4-Continued From Previous Month 014 13 I th.csaine Isainnig A I escuse I saminae"*

5-lietuc t t on i Adeissnesse.neeve 9-Other 5

t. Ogweais. nut I is..a il aplane t I shibst I 5enw %ense l'8/77) 11 Oslice i1.pl. san t e

i m

f-4 o.

\\

OPERATING DATA REPORT DOCKET NO.:

50 412 REPORT DATE: 03/10/88 COMPLETED BY: M.A.WINGER TELEPHONE:

(412) 643-1825 OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
2. REPORTING PERIOD: FEBRUARY 1988
3. LICENSED THERMAL POWER (MWt):

2660

4. NAMEPLATE RATING (Gross MWe):

923

5. DESIGN ELECTRICAL RATING (Net MWe):

836

6. MAX. DEPENDABLE CAPACITY (Gross MWe):

885

7. MAX. DEPENDABLE CAPACITY (Net MWe):

833

8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE 1AST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):

None

10. REASONS FOR RESTRICTIONS, IF ANY:

N/A THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERICD:

696.0 1440.0 2511.0

12. NO. OF RRS. REACTOR WAS CRITICAL:

414.6 1040.5 2006.0 i

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

14. hdURS GENERATOR WAS ON LINE:

401.8 1027.7 1977.5

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. GROSS THERMAL ENERGY GEN. (MWH):

948305.0 2595823.0 4981460.4

17. GROSS ELECT. ENERGY GEN. (MWH):

307600.0 843400.0 1625600.0

18. NET ELECTRICAL ENERGY GEN. (MWH):

285646.0 792196.0 1530300.0

19. UNIT SERVICE FACTOR: (PERCENT) 57.7 71.4 73.8
20. UNIT AVAILABILITY FACTOR:(PERCENT) 57.7 71.4 78.8
21. UNIT CAPACITY FACTOR (MDC): PCT 49.3 66.0 73.2
22. UNIT CAPACITY FACTOR (DER):PCf 49.1 65.8 172.9 I

)

23. UNIT FORCED OUTAGE RATE: (PERCENT) 14.0 6.0 9.0 24 SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE AND DURATION OF EACH):
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A..... _