NARRATIVE | |||
==SUMMARY== | ==SUMMARY== | ||
OF | OF j-6 110NTHLY OPERATING EXPERIENCE | ||
*~ | |||
UNIT I FEBRUARY, 1988 February 1 | |||
through February 4 February 5 | ~ The Unit remained -shutdown for refueling. | ||
February 6 | through February 4 February 5 At 1255 hours, the Unit entered Mode 5. | ||
through February 22 February 23 | February 6 The Unit remained in Mode 5. | ||
February 24 | through February 22 February 23 At 0200 hours, the Unit entered Mode 4. | ||
February 24 At 0736 hours, the Unit entered Mode 3. | |||
through February 27 february 28 | February 25 The Unit remained in Mode 3. | ||
February 29 | through February 27 february 28 At 1332 hours, the Unit entered Mode 2. | ||
February 29 The Unit remained in ibde 2. | |||
I' | I' | ||
( | ( | ||
I | I n | ||
~~ | |||
p | p ry j | ||
68033OO32ces3fo34 | |||
{DR ADOCK 050 s | |||
DCD f | |||
AVERAGE DAILi UNIT POWER LEVEL f | |||
DOCKET NO. | DOCKET NO. | ||
UNIT | 30-33'~ | ||
I | UNIT 3'.~' S t.*ni: Jl DATE March 10, 1988 COMPLETED SY M.A. Winge n TELEPHONE (412) 643-1825 MONTH February, 1988 DAY AVERAGE DAILY POWER LIVEL DAY AVERAGE DALLY POWER LIVEL IM We, Net) | ||
:0 I | (MWe-Net: | ||
n | I O | ||
n | 0 g7 2 | ||
8 | 0 0 | ||
;g 3 | |||
INSTRUCTIONS On this format. !at the average hiv anit power le.et :n MWe Net yr esch day .n the reentrine month. C.onnuie na the nearest unule mepwait. | 0 39 0 | ||
4 0 | |||
:0 0 | |||
I O | |||
21 0 | |||
6 n | |||
n 0 | |||
0 1 | |||
0 y | |||
8 0 | |||
o 24 9 | |||
0 o | |||
10 0 | |||
0 26 lI O | |||
y 0 | |||
12 0 | |||
o 13 0 | |||
39 0 | |||
14 0 | |||
30 N/A 13 0 | |||
3{ | |||
N/A 16 0 | |||
j l | |||
INSTRUCTIONS On this format. !at the average hiv anit power le.et :n MWe Net yr esch day.n the reentrine month. C.onnuie na the nearest unule mepwait. | |||
14I77) i | 14I77) i | ||
_m. . . | _m... | ||
UNIT SilUIDOWNS AND POWER REDUCTIONS | UNIT SilUIDOWNS AND POWER REDUCTIONS IMKKE T NO. 314 UNIT NAME 8VPS U881L Il DATE - March 10 1988 REPOR T.'f0NIH February, 1988 COMrLETEla ny M.A. Winger TELLFIlONE (412) 643-18_25 "s. | ||
c^ | |||
s' | s' | ||
".O oa ci 0St 1.icensee c | |||
Date | No. | ||
Date "a | |||
%o 3U2 Event 0e Cause & Corrective o | |||
S | |||
ca 2 | $5 I | ||
Outage. | sS* | ||
Action to j"$ | |||
1 | =g 0 | ||
Report # | |||
A F.guipmens f~ailuse (I spliint | H Q | ||
Prevent Recurrence m | |||
: t. Ogicsate.nul I es.u ll mgilanel | o o | ||
l'8/ U ) | ca 2 | ||
880201 S | |||
696 C | |||
4 N/A ZZ ZZZZZZ The Unit remained shutdown the entire month of the Unit's Sixth Refueling Outage. | |||
eu i | |||
1 2 | |||
I I a.ed Reas*"' | |||
3 4 | |||
5 Si hcJu c l Hethod: | |||
8 A F.guipmens f~ailuse (I spliint 1.shebes G - Insisu si.=is s | |||
1-Manual B Maintenante e.e Test l'" PacI'38 J8k"' "8 DJ8J 2-Manual Scree I naes Sliccas I.u I mesisec r RefuelinK 3-Automatte scram I sen Rq we e! I H s I sic t NtINI G | |||
: 1) Regulataeg Hesiskti."' | |||
4-Continued Fros Previous Month (1891) | |||
I th.ceae u Tealning A lesense I sananatioet i AJuunasse.nesvc 5-metuction 9-Other 5 | |||
: t. Ogicsate.nul I es.u ll mgilanel l'8/ U ) | |||
II(hiecsiI spla.I Isinhos1 Sann-N.ne.c a | |||
=___. | |||
y.- | y.- | ||
OPERATING DATA REPORT DOCKET NO.: | OPERATING DATA REPORT DOCKET NO.: | ||
: 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 | 50 334 REPORT DATE: 03/10/88 COMPLETED BY: M.A. WINGER TELEPHONE: | ||
(412) 643 1825 OPERATING STATUS | |||
: 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes | |||
: 2. REPORTING PERIOD: FEBRUARY 1988 | : 2. REPORTING PERIOD: FEBRUARY 1988 | ||
: 3. LICENSED THERMAL POWER (MWt): | : 3. LICENSED THERMAL POWER (MWt): | ||
: 4. NAMEPLATE RATING (Grose MWe): | 2660 | ||
: 5. DESIGN ELECTRICAL RATING (Net MWe): | : 4. NAMEPLATE RATING (Grose MWe): | ||
: 6. MAX. DEPENDABLE CAPACITY (Gross MWe): | 923 | ||
: 7. MAX. DEPENDABLE CAPACITY (Net MWe): | : 5. DESIGN ELECTRICAL RATING (Net MWe): | ||
835 | |||
: 6. MAX. DEPENDABLE CAPACITY (Gross MWe): | |||
860. | |||
: 7. MAX. DEPENDABLE CAPACITY (Net MWe): | |||
810 | |||
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS: | : 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS: | ||
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): | : 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): | ||
: 10. REASONS FOR RESTRICTIONS, IF ANY: | None | ||
: 11. HOURS IN REPORTING PERIOD: | : 10. REASONS FOR RESTRICTIONS, IF ANY: | ||
: 12. NO. OF HRS. REACTOR WAS CRITICAL: | N/A THIS MONTH YEAR TO DATE CUMULATIVE | ||
: 13. REACTOR RESERVE SHUTDOWN HOURS: | : 11. HOURS IN REPORTING PERIOD: | ||
: 14. HOURS GENERATOR WAS ON LINE: | 696.0 1440.0 103728'.0 | ||
: 15. UNIT RESERVE SHUTDOWN HOURS: | : 12. NO. OF HRS. REACTOR WAS CRITICAL: | ||
: 16. GROSS THERMAL ENERGY GEN. (MWH): | 0.0 0.0 59184.2 | ||
: 17. GROSS ELECT. ENERGY GEN. (MWH): | : 13. REACTOR RESERVE SHUTDOWN HOURS: | ||
: 18. NET ELECTRICAL ENERGY GEN. (MWH): | 0.0 0.0 4482.8 | ||
: 19. UNIT SERVICE FACTOR: (PERCENT) | : 14. HOURS GENERATOR WAS ON LINE: | ||
: 20. UNIT AVAILABILITY FACTOR:(PERCENT) | 0.0 0.0 57654.2 | ||
: 21. UNIT CAPACITY FACTOR (MDC): PCT | : 15. UNIT RESERVE SHUTDOWN HOURS: | ||
: 22. UNIT CAPACITY FACTOR (DER): PCT | 0.0 0.0 0.0 | ||
: 23. UNIT FORCED OUTAGE RATE: (PERCENT) | : 16. GROSS THERMAL ENERGY GEN. (MWH): | ||
0.0 0.0 136917319.5 | |||
: 17. GROSS ELECT. ENERGY GEN. (MWH): | |||
0.0 0.0 43865720.0 | |||
: 18. NET ELECTRICAL ENERGY GEN. (MWH): | |||
-7720.0 | |||
-10920.0 40914773.0 | |||
: 19. UNIT SERVICE FACTOR: (PERCENT) 0.0 0.0 57.9 | |||
: 20. UNIT AVAILABILITY FACTOR:(PERCENT) 0.0 0.0 57.9 | |||
: 21. UNIT CAPACITY FACTOR (MDC): PCT 0.0 0.0 51.9 | |||
: 22. UNIT CAPACITY FACTOR (DER): PCT 0.0 0.0 50.4 | |||
: 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 19.7 24 SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE, AND DURATION OF EACH): | |||
N/A | N/A | ||
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | : 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | ||
MAR 2.1988 | |||
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): | : 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): | ||
FORECAST | FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A i | ||
INITIAL CRITICALITY | COMMERCIAL OPERATION N/A N/A 1 | ||
F=- | F=- | ||
1 | 1 NARRATIVE | ||
==SUMMARY== | ==SUMMARY== | ||
OF b | OF b | ||
MONTHLY OPERATING EXPERIENCE UNIT II FEBRUARY, 1988 February 1 | MONTHLY OPERATING EXPERIENCE UNIT II FEBRUARY, 1988 February 1 | ||
through February 9 February 10 | 'The Unit remained shutdown for maintenance. | ||
February 11 | through February 9 February 10 The reactor was taken critical at 1123 hours.. At 1300 hours, the reactor was shutdown to repair Pressurizer PORY Isolation Valve (RCS-MOV537). | ||
February 12 | February 11 The Unit remained shutdown. | ||
February 13 | February 12 The reactor was taken critical at 1903 hours. | ||
February 14 | February 13 The Unit was synchronized at 0614 hours and power was escala ted to a nominal value of 45% to. permit s team gene ra tor level trip setpoint adjustments. At 1300 hours, a power escalation toward 95% was initiated. | ||
through February 16 February 17 | February 14 The Unit operated at a nominal value of 100% output. | ||
February 18 | through February 16 February 17 At 2104 hours, the Unit's output was reduced to 75% to permit leak testing of the 'D' waterbox of the Unit's main condenser. | ||
February 19 | February 18 At 0910 hours, the Uni t's output was increased-to approximately 87%. | ||
February 20 | February 19 At 0310 hours, leak testing of the Unit's main condenser was complete and a power escalation toward 100% output was i ni tia ted. | ||
through February 21 February 22 | At 0950 hours, the Unit's output was reduced to 85% to pe rmi t leak testing of the | ||
Februa ry 23 | 'O' waterbox of the Uni t's main condenser. | ||
At 1205 hours, power was reduced to 60% tc remove the 'B' Main Feed Pump from service for maintenance. | |||
February 20 The Unit operated at a naninal value of 60%' output. | |||
through February 21 February 22 At 0520 hours, the Startup ' Feed Pump was placed in service and power was escalated to a nominal value of 80%. | |||
At 1145 hours, the 'B' Main feed Pump was returned to service and power was increased to a nominal value of 100% output. | |||
Februa ry 23 The Unit operated at a nominal value nf 100% output, through February 29 - | |||
Ri - | Ri - | ||
DOCKET NO. 50-412 | AVERAGE DAILY UNIT POWER LEVE1. | ||
DOCKET NO. | |||
50-412 (JNgr BVPS Unit 2 DATE March 10, 1988 COMPLETED SY M.A. Winner TELEPHONE (412) 643 1825 MONTil February, 1988 DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL I M W'-N 'il iMWe-Net 1 | |||
0 | 0 17 802 2 | ||
0 13 668 3 | |||
:4 | 0 19 623 4 | ||
0 447 30 5 | |||
16 | 0 453 6 | ||
(4177) | 0 655 i | ||
7 | |||
_0 823 | |||
:3 3 | |||
0 | |||
:4 818 9 | |||
0 is 818 10 0 | |||
26 814 ll 0 | |||
27 814 12 0 | |||
818 13 290 814 39 14 802 ja N/A is 818 3 | |||
N/A 16 822 INSTRUCTIONS On this format.!tst the actne d::ily unit :n ser :r.e!:n Mwe Nei tar esch day in the recurring monen.C..mnute e u | |||
the nearest whvie mepwatt. | |||
(4177) ____ | |||
g"-~ | g"-~ | ||
q UNII SIIU1 DOWNS AND POWER REIMETIONS DOCKE T NO. 50-412 UNIT NAME BVPS IInit 2 f)A TE March 10, 19ss i | |||
:: n | REPOR T MONIH February, 1988 COMPLE TEg) gy M.A. Winger IEl EPflONE (412) 643-1825 m | ||
be | |||
:: n | |||
% ee o oa 0$% | |||
Licensee c | |||
a Cause & Corrective No. | |||
Date 2 | |||
3UE Event 8 | |||
kS E | |||
Action to R | |||
$3 I | |||
sS* | |||
Report # | |||
a H | |||
A j"S Prevent Recurrence m | |||
o o | |||
ca i | ca i | ||
3 | 3 880201 S | ||
la | 229 B | ||
4 N/A CA VESSEL Perform maintenance on a leaking pressurizer manway. | |||
la 4 | |||
880210 F | |||
65.2 A | |||
1 N/A CA VALVEX The reactor was shutdown to repair pressurizer PORV Isolation Valve | |||
[RCS-MOV537). | [RCS-MOV537). | ||
5 | 5 880217 F | ||
0 B | |||
ZZZZZZ | 5 N/A HC ZZZZZZ Reduced output to 75% to permit leak testing the | ||
7 | 'D' waterbox of the Unit's main condenser. | ||
I I | 6 880219 F | ||
A Fquipmens failure (i = plaint | 0 B | ||
: a. Menu 11 | 5 N/A IIC ZZZZZZ Reduced output to 85% to permit leak 4 | ||
testing of the | |||
: t. Ogweais. nut I is..a il aplane t | 'D' waterbox of the Unit's main condenser. | ||
l'8/77) | 7 880219 F | ||
i | 0 B | ||
5 N/A Cll PUMPXX Power was reduced from 85% to 60% to permit the | |||
'B' main feed pump's removal from service for maintenance. | |||
I I | |||
2 3 | |||
4 I I n.cd Reasnes n,ehad: | |||
1.sluks G Insiiniti.=es 5 Ss heJu't.I A Fquipmens failure (i = plaint | |||
: a. Menu 11 R Maint anse e r Test f.n Pserd8d'8 a' "8 lla'a 2-Manua1 Scree I ness Shcess 8.n I hcasce C Refiseling 3_a,eo., tic Ser== | |||
IscueR.p. ealiMiIsictNIINIG D NcF''l8'''') Rc5'' k'i.* | |||
4-Continued From Previous Month 014 13 I th.csaine Isainnig A I escuse I saminae"* | |||
5-lietuc t t on i Adeissnesse.neeve 9-Other 5 | |||
: t. Ogweais. nut I is..a il aplane t I shibst I 5enw %ense l'8/77) 11 Oslice i1.pl. san t e | |||
i m | |||
f-4 o. | |||
\\ | |||
OPERATING DATA REPORT DOCKET NO.: | OPERATING DATA REPORT DOCKET NO.: | ||
: 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 | 50 412 REPORT DATE: 03/10/88 COMPLETED BY: M.A.WINGER TELEPHONE: | ||
(412) 643-1825 OPERATING STATUS | |||
: 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes | |||
: 2. REPORTING PERIOD: FEBRUARY 1988 | : 2. REPORTING PERIOD: FEBRUARY 1988 | ||
: 3. LICENSED THERMAL POWER (MWt): | : 3. LICENSED THERMAL POWER (MWt): | ||
: 4. NAMEPLATE RATING (Gross MWe): | 2660 | ||
: 5. DESIGN ELECTRICAL RATING (Net MWe): | : 4. NAMEPLATE RATING (Gross MWe): | ||
: 6. MAX. DEPENDABLE CAPACITY (Gross MWe): | 923 | ||
: 7. MAX. DEPENDABLE CAPACITY (Net MWe): | : 5. DESIGN ELECTRICAL RATING (Net MWe): | ||
836 | |||
: 6. MAX. DEPENDABLE CAPACITY (Gross MWe): | |||
885 | |||
: 7. MAX. DEPENDABLE CAPACITY (Net MWe): | |||
833 | |||
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE 1AST REPORT, GIVE REASONS: | : 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE 1AST REPORT, GIVE REASONS: | ||
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): | : 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): | ||
: 10. REASONS FOR RESTRICTIONS, IF ANY: | None | ||
: 11. HOURS IN REPORTING PERICD: | : 10. REASONS FOR RESTRICTIONS, IF ANY: | ||
: 12. NO. OF RRS. REACTOR WAS CRITICAL: | N/A THIS MONTH YEAR TO DATE CUMULATIVE | ||
: 13. REACTOR RESERVE SHUTDOWN HOURS: | : 11. HOURS IN REPORTING PERICD: | ||
: 14. hdURS GENERATOR WAS ON LINE: | 696.0 1440.0 2511.0 | ||
: 15. UNIT RESERVE SHUTDOWN HOURS: | : 12. NO. OF RRS. REACTOR WAS CRITICAL: | ||
: 16. GROSS THERMAL ENERGY GEN. (MWH): | 414.6 1040.5 2006.0 i | ||
: 17. GROSS ELECT. ENERGY GEN. (MWH): | : 13. REACTOR RESERVE SHUTDOWN HOURS: | ||
: 18. NET ELECTRICAL ENERGY GEN. (MWH): | 0.0 0.0 0.0 | ||
: 19. UNIT SERVICE FACTOR: (PERCENT) | : 14. hdURS GENERATOR WAS ON LINE: | ||
: 20. UNIT AVAILABILITY FACTOR:(PERCENT) | 401.8 1027.7 1977.5 | ||
: 21. UNIT CAPACITY FACTOR (MDC): PCT | : 15. UNIT RESERVE SHUTDOWN HOURS: | ||
: 22. UNIT CAPACITY FACTOR (DER):PCf | 0.0 0.0 0.0 | ||
: 23. UNIT FORCED OUTAGE RATE: (PERCENT) | : 16. GROSS THERMAL ENERGY GEN. (MWH): | ||
948305.0 2595823.0 4981460.4 | |||
: 17. GROSS ELECT. ENERGY GEN. (MWH): | |||
307600.0 843400.0 1625600.0 | |||
: 18. NET ELECTRICAL ENERGY GEN. (MWH): | |||
285646.0 792196.0 1530300.0 | |||
: 19. UNIT SERVICE FACTOR: (PERCENT) 57.7 71.4 73.8 | |||
: 20. UNIT AVAILABILITY FACTOR:(PERCENT) 57.7 71.4 78.8 | |||
: 21. UNIT CAPACITY FACTOR (MDC): PCT 49.3 66.0 73.2 | |||
: 22. UNIT CAPACITY FACTOR (DER):PCf 49.1 65.8 172.9 I | |||
) | |||
: 23. UNIT FORCED OUTAGE RATE: (PERCENT) 14.0 6.0 9.0 24 SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE AND DURATION OF EACH): | |||
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | : 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | ||
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): | : 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): | ||
FORECAST | FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A..... _ | ||
j}} | |||
Latest revision as of 11:21, 11 December 2024
| ML20148J589 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 02/29/1988 |
| From: | Winger M DUQUESNE LIGHT CO. |
| To: | |
| Shared Package | |
| ML20148J593 | List: |
| References | |
| NUDOCS 8803300320 | |
| Download: ML20148J589 (8) | |
Text
_ _.
=.
. - ~ _.
/,
NARRATIVE
SUMMARY
OF j-6 110NTHLY OPERATING EXPERIENCE
- ~
UNIT I FEBRUARY, 1988 February 1
~ The Unit remained -shutdown for refueling.
through February 4 February 5 At 1255 hours0.0145 days <br />0.349 hours <br />0.00208 weeks <br />4.775275e-4 months <br />, the Unit entered Mode 5.
February 6 The Unit remained in Mode 5.
through February 22 February 23 At 0200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br />, the Unit entered Mode 4.
February 24 At 0736 hours0.00852 days <br />0.204 hours <br />0.00122 weeks <br />2.80048e-4 months <br />, the Unit entered Mode 3.
February 25 The Unit remained in Mode 3.
through February 27 february 28 At 1332 hours0.0154 days <br />0.37 hours <br />0.0022 weeks <br />5.06826e-4 months <br />, the Unit entered Mode 2.
February 29 The Unit remained in ibde 2.
I'
(
I n
~~
p ry j
68033OO32ces3fo34
{DR ADOCK 050 s
DCD f
AVERAGE DAILi UNIT POWER LEVEL f
DOCKET NO.
30-33'~
UNIT 3'.~' S t.*ni: Jl DATE March 10, 1988 COMPLETED SY M.A. Winge n TELEPHONE (412) 643-1825 MONTH February, 1988 DAY AVERAGE DAILY POWER LIVEL DAY AVERAGE DALLY POWER LIVEL IM We, Net)
(MWe-Net:
I O
0 g7 2
0 0
- g 3
0 39 0
4 0
- 0 0
I O
21 0
6 n
n 0
0 1
0 y
8 0
o 24 9
0 o
10 0
0 26 lI O
y 0
12 0
o 13 0
39 0
14 0
30 N/A 13 0
3{
N/A 16 0
j l
INSTRUCTIONS On this format. !at the average hiv anit power le.et :n MWe Net yr esch day.n the reentrine month. C.onnuie na the nearest unule mepwait.
14I77) i
_m...
UNIT SilUIDOWNS AND POWER REDUCTIONS IMKKE T NO. 314 UNIT NAME 8VPS U881L Il DATE - March 10 1988 REPOR T.'f0NIH February, 1988 COMrLETEla ny M.A. Winger TELLFIlONE (412) 643-18_25 "s.
c^
s'
".O oa ci 0St 1.icensee c
No.
Date "a
%o 3U2 Event 0e Cause & Corrective o
S
$5 I
sS*
Action to j"$
=g 0
Report #
H Q
Prevent Recurrence m
o o
ca 2
880201 S
696 C
4 N/A ZZ ZZZZZZ The Unit remained shutdown the entire month of the Unit's Sixth Refueling Outage.
eu i
1 2
I I a.ed Reas*"'
3 4
5 Si hcJu c l Hethod:
8 A F.guipmens f~ailuse (I spliint 1.shebes G - Insisu si.=is s
1-Manual B Maintenante e.e Test l'" PacI'38 J8k"' "8 DJ8J 2-Manual Scree I naes Sliccas I.u I mesisec r RefuelinK 3-Automatte scram I sen Rq we e! I H s I sic t NtINI G
- 1) Regulataeg Hesiskti."'
4-Continued Fros Previous Month (1891)
I th.ceae u Tealning A lesense I sananatioet i AJuunasse.nesvc 5-metuction 9-Other 5
- t. Ogicsate.nul I es.u ll mgilanel l'8/ U )
II(hiecsiI spla.I Isinhos1 Sann-N.ne.c a
=___.
y.-
OPERATING DATA REPORT DOCKET NO.:
50 334 REPORT DATE: 03/10/88 COMPLETED BY: M.A. WINGER TELEPHONE:
(412) 643 1825 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: FEBRUARY 1988
- 3. LICENSED THERMAL POWER (MWt):
2660
- 4. NAMEPLATE RATING (Grose MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
835
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
860.
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
810
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
696.0 1440.0 103728'.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
0.0 0.0 59184.2
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 4482.8
- 14. HOURS GENERATOR WAS ON LINE:
0.0 0.0 57654.2
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH):
0.0 0.0 136917319.5
- 17. GROSS ELECT. ENERGY GEN. (MWH):
0.0 0.0 43865720.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
-7720.0
-10920.0 40914773.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 0.0 0.0 57.9
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 0.0 0.0 57.9
- 22. UNIT CAPACITY FACTOR (DER): PCT 0.0 0.0 50.4
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 19.7 24 SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE, AND DURATION OF EACH):
N/A
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
MAR 2.1988
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A i
COMMERCIAL OPERATION N/A N/A 1
F=-
1 NARRATIVE
SUMMARY
OF b
MONTHLY OPERATING EXPERIENCE UNIT II FEBRUARY, 1988 February 1
'The Unit remained shutdown for maintenance.
through February 9 February 10 The reactor was taken critical at 1123 hours0.013 days <br />0.312 hours <br />0.00186 weeks <br />4.273015e-4 months <br />.. At 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br />, the reactor was shutdown to repair Pressurizer PORY Isolation Valve (RCS-MOV537).
February 11 The Unit remained shutdown.
February 12 The reactor was taken critical at 1903 hours0.022 days <br />0.529 hours <br />0.00315 weeks <br />7.240915e-4 months <br />.
February 13 The Unit was synchronized at 0614 hours0.00711 days <br />0.171 hours <br />0.00102 weeks <br />2.33627e-4 months <br /> and power was escala ted to a nominal value of 45% to. permit s team gene ra tor level trip setpoint adjustments. At 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br />, a power escalation toward 95% was initiated.
February 14 The Unit operated at a nominal value of 100% output.
through February 16 February 17 At 2104 hours0.0244 days <br />0.584 hours <br />0.00348 weeks <br />8.00572e-4 months <br />, the Unit's output was reduced to 75% to permit leak testing of the 'D' waterbox of the Unit's main condenser.
February 18 At 0910 hours0.0105 days <br />0.253 hours <br />0.0015 weeks <br />3.46255e-4 months <br />, the Uni t's output was increased-to approximately 87%.
February 19 At 0310 hours0.00359 days <br />0.0861 hours <br />5.125661e-4 weeks <br />1.17955e-4 months <br />, leak testing of the Unit's main condenser was complete and a power escalation toward 100% output was i ni tia ted.
At 0950 hours0.011 days <br />0.264 hours <br />0.00157 weeks <br />3.61475e-4 months <br />, the Unit's output was reduced to 85% to pe rmi t leak testing of the
'O' waterbox of the Uni t's main condenser.
At 1205 hours0.0139 days <br />0.335 hours <br />0.00199 weeks <br />4.585025e-4 months <br />, power was reduced to 60% tc remove the 'B' Main Feed Pump from service for maintenance.
February 20 The Unit operated at a naninal value of 60%' output.
through February 21 February 22 At 0520 hours0.00602 days <br />0.144 hours <br />8.597884e-4 weeks <br />1.9786e-4 months <br />, the Startup ' Feed Pump was placed in service and power was escalated to a nominal value of 80%.
At 1145 hours0.0133 days <br />0.318 hours <br />0.00189 weeks <br />4.356725e-4 months <br />, the 'B' Main feed Pump was returned to service and power was increased to a nominal value of 100% output.
Februa ry 23 The Unit operated at a nominal value nf 100% output, through February 29 -
Ri -
AVERAGE DAILY UNIT POWER LEVE1.
DOCKET NO.
50-412 (JNgr BVPS Unit 2 DATE March 10, 1988 COMPLETED SY M.A. Winner TELEPHONE (412) 643 1825 MONTil February, 1988 DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL I M W'-N 'il iMWe-Net 1
0 17 802 2
0 13 668 3
0 19 623 4
0 447 30 5
0 453 6
0 655 i
7
_0 823
- 3 3
0
- 4 818 9
0 is 818 10 0
26 814 ll 0
27 814 12 0
818 13 290 814 39 14 802 ja N/A is 818 3
N/A 16 822 INSTRUCTIONS On this format.!tst the actne d::ily unit :n ser :r.e!:n Mwe Nei tar esch day in the recurring monen.C..mnute e u
the nearest whvie mepwatt.
(4177) ____
g"-~
q UNII SIIU1 DOWNS AND POWER REIMETIONS DOCKE T NO. 50-412 UNIT NAME BVPS IInit 2 f)A TE March 10, 19ss i
REPOR T MONIH February, 1988 COMPLE TEg) gy M.A. Winger IEl EPflONE (412) 643-1825 m
be
- n
% ee o oa 0$%
Licensee c
a Cause & Corrective No.
Date 2
3UE Event 8
kS E
Action to R
$3 I
sS*
Report #
a H
A j"S Prevent Recurrence m
o o
ca i
3 880201 S
229 B
4 N/A CA VESSEL Perform maintenance on a leaking pressurizer manway.
la 4
880210 F
65.2 A
1 N/A CA VALVEX The reactor was shutdown to repair pressurizer PORV Isolation Valve
[RCS-MOV537).
5 880217 F
0 B
5 N/A HC ZZZZZZ Reduced output to 75% to permit leak testing the
'D' waterbox of the Unit's main condenser.
6 880219 F
0 B
5 N/A IIC ZZZZZZ Reduced output to 85% to permit leak 4
testing of the
'D' waterbox of the Unit's main condenser.
7 880219 F
0 B
5 N/A Cll PUMPXX Power was reduced from 85% to 60% to permit the
'B' main feed pump's removal from service for maintenance.
I I
2 3
4 I I n.cd Reasnes n,ehad:
1.sluks G Insiiniti.=es 5 Ss heJu't.I A Fquipmens failure (i = plaint
- a. Menu 11 R Maint anse e r Test f.n Pserd8d'8 a' "8 lla'a 2-Manua1 Scree I ness Shcess 8.n I hcasce C Refiseling 3_a,eo., tic Ser==
IscueR.p. ealiMiIsictNIINIG D NcFl8') Rc5 k'i.*
4-Continued From Previous Month 014 13 I th.csaine Isainnig A I escuse I saminae"*
5-lietuc t t on i Adeissnesse.neeve 9-Other 5
- t. Ogweais. nut I is..a il aplane t I shibst I 5enw %ense l'8/77) 11 Oslice i1.pl. san t e
i m
f-4 o.
\\
OPERATING DATA REPORT DOCKET NO.:
50 412 REPORT DATE: 03/10/88 COMPLETED BY: M.A.WINGER TELEPHONE:
(412) 643-1825 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
- 2. REPORTING PERIOD: FEBRUARY 1988
- 3. LICENSED THERMAL POWER (MWt):
2660
- 4. NAMEPLATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
836
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
885
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
833
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE 1AST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERICD:
696.0 1440.0 2511.0
- 12. NO. OF RRS. REACTOR WAS CRITICAL:
414.6 1040.5 2006.0 i
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 14. hdURS GENERATOR WAS ON LINE:
401.8 1027.7 1977.5
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH):
948305.0 2595823.0 4981460.4
- 17. GROSS ELECT. ENERGY GEN. (MWH):
307600.0 843400.0 1625600.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
285646.0 792196.0 1530300.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 57.7 71.4 73.8
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 57.7 71.4 78.8
- 22. UNIT CAPACITY FACTOR (DER):PCf 49.1 65.8 172.9 I
)
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 14.0 6.0 9.0 24 SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE AND DURATION OF EACH):
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A..... _
j