| issue date = 06/16/1988
| title = Insp Repts 50-327/88-30 & 50-328/88-30 on 880523-24.No Violations or Deviations Noted.Major Areas Inspected:Plant Chemistry
| author name = Kahle J
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| addressee name =
| addressee affiliation =
| docket = 05000327, 05000328
| license number =
| contact person =
| document report number = 50-327-88-30, 50-328-88-30, NUDOCS 8807120593
| package number = ML20153A845
| document type = INSPECTION REPORT, NRC-GENERATED, INSPECTION REPORT, UTILITY, TEXT-INSPECTION & AUDIT & I&E CIRCULARS
| page count = 4
}}
See also: [[see also::IR 05000327/1988030]]
 
=Text=
{{#Wiki_filter:,
.
.
_.
. . .
. . . ~
..._.m
..
gs3 8t80ugD
UNITED STATE 3
'
o
NUCLEAR REGULATORY COMMISslON
*,
'
~'
REGION li
y
n
j
Ij
101 MARIETTA STREET,N.W.
*
C
ATLANTA. GEO:4GI A 30323
\\; . . . . . /
JUN 2 3 NI8
;
,
Report Nos.: 50-327/88-30 and 50-328/88-30
4
Licensee: Tennessee Valley Authority
6N38 A Lookout Place
1101 Market Street-
Chattanooga, TN 37402-2801-
Docket Nos.: 50-327 and 50-328
License Not.: DPR-77 and DPR-79
-
4
Facility Name: Sequoyah 1 and 2
Inspection Conducted: May 23-24, 1988
.
#//ja
d
6/cfcf
Inspector:
/
L
,_ _
'
C. A. Frug le9
'/
D/te- M gned
'l
Accompanying Pe
nnel:
J. B. Kahle
Approved by:
[a[b
d!/6 !M
,
J
B. K3hle, Section Chief
D(te Signed
0 vi ion of Radiation Safety and Safeguards
i
SUMMARY
L
,
'
l
Scope: This special, announced inspection was in the area of plant chemistry.
Results:
In the areas inspected, violations or deviations were not identified.
4
.
Y
k
4
;
'
,
i
,
,
j
'
;
]
i
1
I
I
,
,
1
1
!
,
!
!
!
8807120593 880623
i
j
PDR
ADOCK 05000327
i
O
PDC
'
'
- . - -
- _ , _ _ . - . - _ , -
 
.
.
.-
.
.
.
>
,
.
..
.
i
REPORT DETAILS
l
i
1.
Persons Contacted
Licensee Employees
,
f
*R. Burch, Radiation Chemistry Section Supervisor
;
G. Fiser, Chemistry Manager
D. Goetcheus, Chemistry Supervisor
{
*L. Jackson, Assistant _to the Plant Manager
D. Nix, Chemical Engineer
V. Shanks, Manager, Water and Waste Processing Group
,
*S. Smith, Plant Manager
'
,
*S. Spencer, Compliance Coordinator
j
i
Other licensee employees contacted during this inspection -included
.
engineers, security force members, technicians, and administrative
'
,
personnel.
l
NRC Resident inspector
*
*F.
McCoy
* Attended exit interview
,
2.
Background Information
The abbreviated inspection was conducted to review Unit 2 restart
-
'
chemistry control data since May 1988, and prior to the plant exceeding'75
l
percent power.
!
Unit 2 was shutdown in August 1985, and had been in lay-up conditions from
then up to the restart.
Details of the lay-up program were described in Inspection Report Nos.
50-327/88-08 and 50-328/88-08 dated March 22, 1988.
The lay-up program
.
was based on guidelines recommended by the Steam Generator Owners' Group
2
,
(SG0G) and the Electric Power Research Institute (EPRI).
,
'
3.
Review of Unit 2 Chemistry Controls
i
1
'
a.
Reactor Coolant System (RCS)
j
Data reviewed by the inspector indicated that radiological and
non-radiological chemistry parameters in the RCS had been maintained
,
within Technical Specifications and Plant Administrative limits' for
'
;
the period May 11-23, 1988.
;
The chemical and volume control system mixed bed deminerali:ers had
been effect.ive in keeping the RCS chloride and fluoride
4
concentrations below 10 parts per billion (ppb).
Dose equivalent
4
1
l
-
 
.-
.
..
.
.
lodine-131 activity and lodine-131/133 ratio indicated minor fuel
leakage,
b.
Hotwell
Dissolved oxygen and sodium averaged less than five ppb during power
operations
over
the
period,
indicating
very
little
below-the-waterline air and circulating water leakage into the
condenser.
Grab samples indicated cation conductivity slightly
greater than the 0.15 umho/cm administrative limit.
c.
Condensate Polishers
Effluent samples from the condensate polishers during the period
indicated that sodium, sulfate and silica concentrations averaged
less than five ppb, one ppb and ten ppb, respectively.
Effluent
cation conductivity from each of six vessels was maintained at about
0.6 umho/cm.
These numbers indicated that the polishers had been
effective in maintaining feedwater and steam generator chemistry.
The licensee indicated that all resins in the polisher vessels had
been replaced prior to the restart.
The inspector considered that
this replacement was a major contributor to good water quality during
the restart,
d.
Feedwater
Feedwater cation conductivity indicated a definite decreasing trend
during the period.
At the beginning of the period cation
conductivity averaged about 0.3 umho/cm and had decreased to about
0.1 umho/cm by May 22, 1988, sodium had decreased to less than 1 ppb
and pH was maintained consistently between 8.8 and 9.2.
e.
Steam Generators
Steam generator blowdown sulfate, sodium, cation conductivity and
chloride concentrations generally were maintained within SGGG/EPRI
guidelines.
Excursions that did occur during plant transients were
quickly reduced back to normal levels.
Oscillations of pH outside administrative limits did occur during the
period, and were attributed to feedwater flow changes during
start-ups, power changes and transients.
During steady-state
operations, pH was within administrative limits.
4.
Staffing / Facilities
The inspector noted recent managerial staffing changes in the areas of
plant chemistry and water treatment.
These represented a gain in
operational experience from other nuclear units that should be an asset to
the Sequoyah chemistry program.
-- -
-
-
-
-
--
--
---- -
--- --
-- -
-
-. - Y
 
.
.
.
.
.
-
..
,_
. .
.
,,-
,
,
,
3
*
,
The inspector toured-the chemistry laboratories and held brief discussions
with several' laboratory personnel.
Facilities.; equipment and personnel
appeared to.be adequate.
.
5.
Sumary
,
The inspector. concluded that the licensee had effectively maintained
primary chemistry within . Technical Specifications and secondary chemistry
generally within the limits recomended by the SG0G and EPRI, except for
'
occasional excursions'during plant transients. - The continued maintenance
,
and improvement of plant chemistry a'nong-with department staffing _and
training will be addressed during subsequent inspections.
'
I
6.
Exit Interview
The inspection scope and results were sumarized on May 24, 1988, with
,
those persons indicated in paragraph 1.
The inspectors described the
:
areas inspected and discussed the inspection results.
Proprietary
information is not contained in this report. . Dissenting coments were
not received from the licensee.
'
i
j
i
i
I
I
:
4
-
:
'
l
,
l
i
9
1
1
.
m
-
- .
.
- .
.
}}

Latest revision as of 03:22, 11 December 2024

Insp Repts 50-327/88-30 & 50-328/88-30 on 880523-24.No Violations or Deviations Noted.Major Areas Inspected:Plant Chemistry
ML20153A842
Person / Time
Site: Sequoyah  
Issue date: 06/16/1988
From: Kahle J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20153A845 List:
References
50-327-88-30, 50-328-88-30, NUDOCS 8807120593
Download: ML20153A842 (4)


See also: IR 05000327/1988030

Text

,

.

.

_.

. . .

. . . ~

..._.m

..

gs3 8t80ugD

UNITED STATE 3

'

o

NUCLEAR REGULATORY COMMISslON

  • ,

'

~'

REGION li

y

n

j

Ij

101 MARIETTA STREET,N.W.

C

ATLANTA. GEO:4GI A 30323

\\; . . . . . /

JUN 2 3 NI8

,

Report Nos.: 50-327/88-30 and 50-328/88-30

4

Licensee: Tennessee Valley Authority

6N38 A Lookout Place

1101 Market Street-

Chattanooga, TN 37402-2801-

Docket Nos.: 50-327 and 50-328

License Not.: DPR-77 and DPR-79

-

4

Facility Name: Sequoyah 1 and 2

Inspection Conducted: May 23-24, 1988

.

  1. //ja

d

6/cfcf

Inspector:

/

L

,_ _

'

C. A. Frug le9

'/

D/te- M gned

'l

Accompanying Pe

nnel:

J. B. Kahle

Approved by:

[a[b

d!/6 !M

,

J

B. K3hle, Section Chief

D(te Signed

0 vi ion of Radiation Safety and Safeguards

i

SUMMARY

L

,

'

l

Scope: This special, announced inspection was in the area of plant chemistry.

Results:

In the areas inspected, violations or deviations were not identified.

4

.

Y

k

4

'

,

i

,

,

j

'

]

i

1

I

I

,

,

1

1

!

,

!

!

!

8807120593 880623

i

j

PDR

ADOCK 05000327

i

O

PDC

'

'

- . - -

- _ , _ _ . - . - _ , -

.

.

.-

.

.

.

>

,

.

..

.

i

REPORT DETAILS

l

i

1.

Persons Contacted

Licensee Employees

,

f

  • R. Burch, Radiation Chemistry Section Supervisor

G. Fiser, Chemistry Manager

D. Goetcheus, Chemistry Supervisor

{

  • L. Jackson, Assistant _to the Plant Manager

D. Nix, Chemical Engineer

V. Shanks, Manager, Water and Waste Processing Group

,

  • S. Smith, Plant Manager

'

,

  • S. Spencer, Compliance Coordinator

j

i

Other licensee employees contacted during this inspection -included

.

engineers, security force members, technicians, and administrative

'

,

personnel.

l

NRC Resident inspector

  • F.

McCoy

  • Attended exit interview

,

2.

Background Information

The abbreviated inspection was conducted to review Unit 2 restart

-

'

chemistry control data since May 1988, and prior to the plant exceeding'75

l

percent power.

!

Unit 2 was shutdown in August 1985, and had been in lay-up conditions from

then up to the restart.

Details of the lay-up program were described in Inspection Report Nos.

50-327/88-08 and 50-328/88-08 dated March 22, 1988.

The lay-up program

.

was based on guidelines recommended by the Steam Generator Owners' Group

2

,

(SG0G) and the Electric Power Research Institute (EPRI).

,

'

3.

Review of Unit 2 Chemistry Controls

i

1

'

a.

Reactor Coolant System (RCS)

j

Data reviewed by the inspector indicated that radiological and

non-radiological chemistry parameters in the RCS had been maintained

,

within Technical Specifications and Plant Administrative limits' for

'

the period May 11-23, 1988.

The chemical and volume control system mixed bed deminerali:ers had

been effect.ive in keeping the RCS chloride and fluoride

4

concentrations below 10 parts per billion (ppb).

Dose equivalent

4

1

l

-

.-

.

..

.

.

lodine-131 activity and lodine-131/133 ratio indicated minor fuel

leakage,

b.

Hotwell

Dissolved oxygen and sodium averaged less than five ppb during power

operations

over

the

period,

indicating

very

little

below-the-waterline air and circulating water leakage into the

condenser.

Grab samples indicated cation conductivity slightly

greater than the 0.15 umho/cm administrative limit.

c.

Condensate Polishers

Effluent samples from the condensate polishers during the period

indicated that sodium, sulfate and silica concentrations averaged

less than five ppb, one ppb and ten ppb, respectively.

Effluent

cation conductivity from each of six vessels was maintained at about

0.6 umho/cm.

These numbers indicated that the polishers had been

effective in maintaining feedwater and steam generator chemistry.

The licensee indicated that all resins in the polisher vessels had

been replaced prior to the restart.

The inspector considered that

this replacement was a major contributor to good water quality during

the restart,

d.

Feedwater

Feedwater cation conductivity indicated a definite decreasing trend

during the period.

At the beginning of the period cation

conductivity averaged about 0.3 umho/cm and had decreased to about

0.1 umho/cm by May 22, 1988, sodium had decreased to less than 1 ppb

and pH was maintained consistently between 8.8 and 9.2.

e.

Steam Generators

Steam generator blowdown sulfate, sodium, cation conductivity and

chloride concentrations generally were maintained within SGGG/EPRI

guidelines.

Excursions that did occur during plant transients were

quickly reduced back to normal levels.

Oscillations of pH outside administrative limits did occur during the

period, and were attributed to feedwater flow changes during

start-ups, power changes and transients.

During steady-state

operations, pH was within administrative limits.

4.

Staffing / Facilities

The inspector noted recent managerial staffing changes in the areas of

plant chemistry and water treatment.

These represented a gain in

operational experience from other nuclear units that should be an asset to

the Sequoyah chemistry program.

-- -

-

-

-

-

--

--


-

--- --

-- -

-

-. - Y

.

.

.

.

.

-

..

,_

. .

.

,,-

,

,

,

3

,

The inspector toured-the chemistry laboratories and held brief discussions

with several' laboratory personnel.

Facilities.; equipment and personnel

appeared to.be adequate.

.

5.

Sumary

,

The inspector. concluded that the licensee had effectively maintained

primary chemistry within . Technical Specifications and secondary chemistry

generally within the limits recomended by the SG0G and EPRI, except for

'

occasional excursions'during plant transients. - The continued maintenance

,

and improvement of plant chemistry a'nong-with department staffing _and

training will be addressed during subsequent inspections.

'

I

6.

Exit Interview

The inspection scope and results were sumarized on May 24, 1988, with

,

those persons indicated in paragraph 1.

The inspectors described the

areas inspected and discussed the inspection results.

Proprietary

information is not contained in this report. . Dissenting coments were

not received from the licensee.

'