ML20154D963: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:- - -        -      .    - - .
{{#Wiki_filter:.-h.
.-h . .-. -
L October 2, 1998 f
L                                                     October 2, 1998 f     MEMORANDUM TO: Thomis H. Essig, Acting Chi;f Generic issues and Environmental Projects Branch                             !
MEMORANDUM TO: Thomis H. Essig, Acting Chi;f Generic issues and Environmental Projects Branch Division of Reactor Program Management Office of Nuclear Reactor Regulation FROM:
Division of Reactor Program Management Office of Nuclear Reactor Regulation                                         l l
Peter C. Wen, Project Manager " Original Signed By" Generic lasues and Environmental Projects Branch Division of Reactor Program Management Office of Nuclear Reactor Regulation
FROM:                     Peter C. Wen, Project Manager " Original Signed By" Generic lasues and Environmental Projects Branch Division of Reactor Program Management Office of Nuclear Reactor Regulation


==SUBJECT:==
==SUBJECT:==
==SUMMARY==
==SUMMARY==
OF SEPTEMBER 22,1998, MEETING WITH WESTINGHOUSE OWNERS GROUP (WOG) REGARDING RISK-INFORMED METHODS TO PIPING INSERVICE INSPECTION (WCAP-14572, REV 1)
OF SEPTEMBER 22,1998, MEETING WITH WESTINGHOUSE OWNERS GROUP (WOG) REGARDING RISK-INFORMED METHODS TO PIPING INSERVICE INSPECTION (WCAP-14572, REV 1)
Line 31: Line 29:
The focus of the meeting was to review all outstanding issues, mainly in the area of potential failure of piping, consequences of failure, and risk impact of changes in the ISI program. In the meeting, Westinghouse provided draft responses to the staff open items for discussion. The status and schedule for the closure of the issues were also discussed. All staff issues were closed or technically resolved and there are no remaining open issues for which a technical resolution has not been achieved. The staff and WOG agreed on the changes to be made on the Westinghouse responses.
The focus of the meeting was to review all outstanding issues, mainly in the area of potential failure of piping, consequences of failure, and risk impact of changes in the ISI program. In the meeting, Westinghouse provided draft responses to the staff open items for discussion. The status and schedule for the closure of the issues were also discussed. All staff issues were closed or technically resolved and there are no remaining open issues for which a technical resolution has not been achieved. The staff and WOG agreed on the changes to be made on the Westinghouse responses.
At the conclusion of the meeting, WOG agreed to provide summary responses to the questions listed as discussed during the meeting. By {{letter dated|date=September 30, 1998|text=letter dated September 30,1998}}, the WOG submitted a redline and strikeout version of the revised responses to reflect the change to the draft responses (Attachment 2).
At the conclusion of the meeting, WOG agreed to provide summary responses to the questions listed as discussed during the meeting. By {{letter dated|date=September 30, 1998|text=letter dated September 30,1998}}, the WOG submitted a redline and strikeout version of the revised responses to reflect the change to the draft responses (Attachment 2).
Attachments: As stated                                                                               I cc w/atts: See next page DISTRIBUTION: See attached page Document Name: g:\pxw\msum0922.wog[ /L
Attachments: As stated cc w/atts: See next page DISTRIBUTION: See attached page
                                                                            /)                                l
/)
                                                                            //                            \<
Document Name: g:\\pxw\\msum0922.wog[ /L
OFFICE         PM:PGEB:DRPM           BC M [      ,    SC:PGE f 33 NAME           PWen:sw pcd tIBagchiM                   FAksth8 DATE           10/ l /98             10/ \ /98         10h9k OFFICIAL OFFICE COPY
//
                                                                                ~
\\<
h f
BC M[,
n+2 we r V'O N                                         gg               x e f o f u m W ss m rn 7 ;           ,J Ud d
f 33 OFFICE PM:PGEB:DRPM SC:PGE NAME PWen:sw pcd tIBagchiM FAksth8 DATE 10/ l /98 10/ \\ /98 10h9k
: e. w . -
~
9810080001 981002 PDR       TOPRP ENVWEST C                       PM           ,
hf OFFICIAL OFFICE COPY n+2 we r V'O N gg x e f o f u m W ss m rn 7 ;
,J Ud d
: e. w. -
9810080001 981002 PDR TOPRP ENVWEST C
PM


d.
d.
Distribution: Mtg. Summary w/ WOG Re: Risk-Informed Methods to Piping ISI Dtdl0/02/98 Hard Conv                                                                                     )
Distribution: Mtg. Summary w/ WOG Re: Risk-Informed Methods to Piping ISI Dtdl0/02/98 Hard Conv Docket File PUBLIC PGEB R/F OGC ACRS PWen i
Docket File PUBLIC PGEB R/F                                                                                     !
GBagchi SAll SDinsmore JGuttmann MMarkley EMail SCollins/FMiraglia BSheron RZimmerman BBoger JRoe DMatthews TEssig FAkstulewicz Glainas JStrosnider RBarrett AEl-Bassioni GTracey, EDO
OGC ACRS PWen                                                                                         i GBagchi SAll SDinsmore JGuttmann MMarkley EMail SCollins/FMiraglia BSheron RZimmerman BBoger JRoe DMatthews TEssig FAkstulewicz Glainas JStrosnider RBarrett AEl-Bassioni GTracey, EDO


- . . . - .. .-_ - -                        . . - . _ - -  . . .  -.... - .- .. - - .. -.- ...- . - ..~.-
. -..~.-
S     ,-      ..
S Westinghouse Owners Group cc:
Westinghouse Owners Group cc:
Mr. Nicholas Liparulo, Manager Equipment Design and Regulatory Engineering Westinghouse Electric Corporation Mail Stop ECE 4-15 P.O. Box 355 Pittsburgh, PA 15230-0355 Mr. Andrew Drake, Project Manager Westinghouse Owners Group Westinghouse Electric Corporation Mail Stop ECE 5-16 P.O. Box 355 Pittsburgh, PA 15230-0355 Mr. Jack Bastin, Director Regulatory Affairs Westinghouse Electric Corporation 11921 Rockville Pike Suite 107 Rockville, MD 20852 Mr. Hank Sepp, Manager
Mr. Nicholas Liparulo, Manager Equipment Design and Regulatory Engineering Westinghouse Electric Corporation Mail Stop ECE 4-15 P.O. Box 355 Pittsburgh, PA 15230-0355 Mr. Andrew Drake, Project Manager Westinghouse Owners Group Westinghouse Electric Corporation Mail Stop ECE 5-16 P.O. Box 355 Pittsburgh, PA 15230-0355 Mr. Jack Bastin, Director Regulatory Affairs Westinghouse Electric Corporation 11921 Rockville Pike Suite 107 Rockville, MD 20852 Mr. Hank Sepp, Manager
                                                                                                          ]
]
Regulatory and Licensing Engineering                                               '
Regulatory and Licensing Engineering Westinghouse Electric Corporation PO Box 355 Pittsburgh, PA 15230-0355
Westinghouse Electric Corporation PO Box 355 Pittsburgh, PA 15230-0355


    . ._ . . . _        _ _    . . . .      _ _.  ._        .._ ._._._      _  ._ ~ _ _. _ _ _
._ ~ _ _. _ _
NRC/WOG MEETING ON RISK INFORMED METHODS TO PIPING ISI LIST OF ATTENDEES September 22,1998 NAME                                       ORGANIZATION Goutam Bagchi                               NRR/ECGB Syed Ali                                   NRR/ECGB Stephen Dinsmore                           NRR/SPSB Mike Cheok                                 NRR/SPSB Jack Guttmann                               RES/PRAB                             i Debbie Jackson                             RES/PRAB                             l Peter Wen                                   NRR/PGEB Allen Porter                               INEEL/LMITCO                         I Gregory Miller                             INEEL/LMITCO Fred Simonen (Via Phone)                   PNNL Biff Brudley                               NEl Dennis Weakland                             WOG/Doquesne Light Raymond West                               WOG/ Northeast Utilities Alex McNeill                               Virginia Power Pat O'Regan                                 DE&S Bruce Bishop                               Westinghouse                         ,
NRC/WOG MEETING ON RISK INFORMED METHODS TO PIPING ISI LIST OF ATTENDEES September 22,1998 NAME ORGANIZATION Goutam Bagchi NRR/ECGB Syed Ali NRR/ECGB Stephen Dinsmore NRR/SPSB Mike Cheok NRR/SPSB Jack Guttmann RES/PRAB i
Kenneth Barkey                             Westinghouse                         l Nancy Closky                               Westinghouse                         I j                Jason Brown                                 Westinghouse                         4 i
Debbie Jackson RES/PRAB Peter Wen NRR/PGEB Allen Porter INEEL/LMITCO Gregory Miller INEEL/LMITCO Fred Simonen (Via Phone)
i l
PNNL Biff Brudley NEl Dennis Weakland WOG/Doquesne Light Raymond West WOG/ Northeast Utilities Alex McNeill Virginia Power Pat O'Regan DE&S Bruce Bishop Westinghouse Kenneth Barkey Westinghouse Nancy Closky Westinghouse Jason Brown Westinghouse j
a Attachment 1}}
4 i
i a
,}}

Latest revision as of 01:11, 11 December 2024

Summary of 980922 Meeting with WOG in Rockville MD Re risk-informed Methods to Piping Inservice Insp.List of Attendees Encl
ML20154D963
Person / Time
Issue date: 10/02/1998
From: Wen P
NRC (Affiliation Not Assigned)
To: Essig T
NRC (Affiliation Not Assigned)
Shared Package
ML20154D968 List:
References
NUDOCS 9810080001
Download: ML20154D963 (4)


Text

.-h.

L October 2, 1998 f

MEMORANDUM TO: Thomis H. Essig, Acting Chi;f Generic issues and Environmental Projects Branch Division of Reactor Program Management Office of Nuclear Reactor Regulation FROM:

Peter C. Wen, Project Manager " Original Signed By" Generic lasues and Environmental Projects Branch Division of Reactor Program Management Office of Nuclear Reactor Regulation

SUBJECT:

SUMMARY

OF SEPTEMBER 22,1998, MEETING WITH WESTINGHOUSE OWNERS GROUP (WOG) REGARDING RISK-INFORMED METHODS TO PIPING INSERVICE INSPECTION (WCAP-14572, REV 1)

On September 22,1998, a public meeting was held at the U.S. Nuclear Regulatory Commission's (NRC's) offices in Rockville, Maryland, between members of the WOG, Westinghouse, and NRC staff. Attachment i lists attendees at the meeting.

The purpose of the meeting was to discuss the open items related to risk-informed methods to piping inservice inspections. The list of open items was sent to WOG before the meeting via a letter from Peter Wen (NRC) to Andrew Drake (WOG), dated September 2,1908 and is available in the public document room (Accession Number 9809080033.)

The focus of the meeting was to review all outstanding issues, mainly in the area of potential failure of piping, consequences of failure, and risk impact of changes in the ISI program. In the meeting, Westinghouse provided draft responses to the staff open items for discussion. The status and schedule for the closure of the issues were also discussed. All staff issues were closed or technically resolved and there are no remaining open issues for which a technical resolution has not been achieved. The staff and WOG agreed on the changes to be made on the Westinghouse responses.

At the conclusion of the meeting, WOG agreed to provide summary responses to the questions listed as discussed during the meeting. By letter dated September 30,1998, the WOG submitted a redline and strikeout version of the revised responses to reflect the change to the draft responses (Attachment 2).

Attachments: As stated cc w/atts: See next page DISTRIBUTION: See attached page

/)

Document Name: g:\\pxw\\msum0922.wog[ /L

//

\\<

BC M[,

f 33 OFFICE PM:PGEB:DRPM SC:PGE NAME PWen:sw pcd tIBagchiM FAksth8 DATE 10/ l /98 10/ \\ /98 10h9k

~

hf OFFICIAL OFFICE COPY n+2 we r V'O N gg x e f o f u m W ss m rn 7 ;

,J Ud d

e. w. -

9810080001 981002 PDR TOPRP ENVWEST C

PM

d.

Distribution: Mtg. Summary w/ WOG Re: Risk-Informed Methods to Piping ISI Dtdl0/02/98 Hard Conv Docket File PUBLIC PGEB R/F OGC ACRS PWen i

GBagchi SAll SDinsmore JGuttmann MMarkley EMail SCollins/FMiraglia BSheron RZimmerman BBoger JRoe DMatthews TEssig FAkstulewicz Glainas JStrosnider RBarrett AEl-Bassioni GTracey, EDO

. -..~.-

S Westinghouse Owners Group cc:

Mr. Nicholas Liparulo, Manager Equipment Design and Regulatory Engineering Westinghouse Electric Corporation Mail Stop ECE 4-15 P.O. Box 355 Pittsburgh, PA 15230-0355 Mr. Andrew Drake, Project Manager Westinghouse Owners Group Westinghouse Electric Corporation Mail Stop ECE 5-16 P.O. Box 355 Pittsburgh, PA 15230-0355 Mr. Jack Bastin, Director Regulatory Affairs Westinghouse Electric Corporation 11921 Rockville Pike Suite 107 Rockville, MD 20852 Mr. Hank Sepp, Manager

]

Regulatory and Licensing Engineering Westinghouse Electric Corporation PO Box 355 Pittsburgh, PA 15230-0355

._ ~ _ _. _ _

NRC/WOG MEETING ON RISK INFORMED METHODS TO PIPING ISI LIST OF ATTENDEES September 22,1998 NAME ORGANIZATION Goutam Bagchi NRR/ECGB Syed Ali NRR/ECGB Stephen Dinsmore NRR/SPSB Mike Cheok NRR/SPSB Jack Guttmann RES/PRAB i

Debbie Jackson RES/PRAB Peter Wen NRR/PGEB Allen Porter INEEL/LMITCO Gregory Miller INEEL/LMITCO Fred Simonen (Via Phone)

PNNL Biff Brudley NEl Dennis Weakland WOG/Doquesne Light Raymond West WOG/ Northeast Utilities Alex McNeill Virginia Power Pat O'Regan DE&S Bruce Bishop Westinghouse Kenneth Barkey Westinghouse Nancy Closky Westinghouse Jason Brown Westinghouse j

4 i

i a

,