ML20154G163: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot change |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:_- | {{#Wiki_filter:_ - | ||
'o$ | |||
I..'NITED STATES NUCLEAR REGULATORY COMMISSION h | |||
WASHING TON, D. C. 20555 May 20, 1988 | |||
FROM: | ,o NOTE T0: | ||
Jim McKnight, DCD FROM: | |||
Melinda Malloy, Project Manager Comanche Peak Project Division Office of Special Projects | |||
==SUBJECT:== | ==SUBJECT:== | ||
COMANCHE PEAK DOCUMENT WITH MISSING ENCLOSURE (ACN 8709290419) | COMANCHE PEAK DOCUMENT WITH MISSING ENCLOSURE (ACN 8709290419) | ||
It has recently ::ome to my attention that TV Electric letter TXX-6783 dated 9/23/87 (ACN 8709290419) was received for DCD processing wi .iout the referenced enclosure. A copy of the enclosure, designated by me as the original, is at-tached. I would like you to arrange for reprocessing and redistribution of the document to marry its enclosure with it. Of greatest importance is to assure that the PDR-H St., the LPDR, and central files receive copies of the complete document as soon as possible. | It has recently ::ome to my attention that TV Electric letter TXX-6783 dated 9/23/87 (ACN 8709290419) was received for DCD processing wi.iout the referenced enclosure. A copy of the enclosure, designated by me as the original, is at-tached. | ||
Please call me if there are any questions. | I would like you to arrange for reprocessing and redistribution of the document to marry its enclosure with it. Of greatest importance is to assure that the PDR-H St., the LPDR, and central files receive copies of the complete document as soon as possible. | ||
Please call me if there are any questions. ).h-Melinda Malloy | |||
==Attachment:== | ==Attachment:== | ||
TXX-6783 dtd 9/23/87 (1 page) and PCHVP Commodity / Attribute Matrix (187 pages) gynna sinne A | TXX-6783 dtd 9/23/87 (1 page) and PCHVP Commodity / Attribute Matrix (187 pages) gynna sinne A | ||
i}} | |||
Latest revision as of 00:52, 11 December 2024
| ML20154G163 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 05/20/1988 |
| From: | Malloy M NRC OFFICE OF SPECIAL PROJECTS |
| To: | Mcknight J NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| NUDOCS 8805240269 | |
| Download: ML20154G163 (1) | |
Text
_ -
'o$
I..'NITED STATES NUCLEAR REGULATORY COMMISSION h
WASHING TON, D. C. 20555 May 20, 1988
,o NOTE T0:
Jim McKnight, DCD FROM:
Melinda Malloy, Project Manager Comanche Peak Project Division Office of Special Projects
SUBJECT:
COMANCHE PEAK DOCUMENT WITH MISSING ENCLOSURE (ACN 8709290419)
It has recently ::ome to my attention that TV Electric letter TXX-6783 dated 9/23/87 (ACN 8709290419) was received for DCD processing wi.iout the referenced enclosure. A copy of the enclosure, designated by me as the original, is at-tached.
I would like you to arrange for reprocessing and redistribution of the document to marry its enclosure with it. Of greatest importance is to assure that the PDR-H St., the LPDR, and central files receive copies of the complete document as soon as possible.
Please call me if there are any questions. ).h-Melinda Malloy
Attachment:
TXX-6783 dtd 9/23/87 (1 page) and PCHVP Commodity / Attribute Matrix (187 pages) gynna sinne A
i