ML20155E959: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot change |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:,.. | {{#Wiki_filter:,.. | ||
- _ _ _ _ _ _ _ _ _ | |||
_ | |||
., . | |||
'* | |||
- | |||
. | |||
, | |||
SEP 28 '988 | |||
^ | ^ | ||
Docket No. 50-425 | |||
License No. CPPR-109 | |||
Georgia Power Company | |||
ATTN: Mr. W. G. Hairston, III | |||
Senior Vice President - | |||
Nuclear Operations | |||
P. O. Box 4545 | |||
Atlanta, GA 30302 | |||
Gentlemen: | |||
SUBJECT: | |||
NRC INSPECTION REPORT NO. 50-425/88-47 | |||
This refers to the Nuclear Regulatory Comission (NRC) inspection conducted | |||
by J. R. Harris on August 15-19, 1988. | |||
The inspection included a review of | |||
activities authorized for your Vogtle facility. | |||
At the conclusion af the | |||
inspection, the findings were discussed with those members of your staff | |||
identified in the enclosed inspection report. | |||
Areas examined during the inspection are identified in the report. | |||
Within | |||
these areas, the inspection consisted of selective examinations of procedures | |||
and representative records, interviews with personnel, and observation of | |||
activities in progress. | |||
Within the scope of the inspection, no violations or deviations were | |||
identified. | |||
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2, | |||
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure | |||
will be placed in the NRC Public Document Room. | |||
Should you have any questions concerning this letter, please contact us. | |||
Sincerely, | |||
C | |||
V | |||
Alan R. I 2rdt, Chief | |||
Engineering Branch | |||
Division of Reactor Safety | |||
Enclosure: | |||
NRC Inspection Report | |||
cc: | |||
(See page 2) | |||
0010130076 000920 | |||
PDR | |||
ADOCK 0D000425 | |||
0 | |||
PNV | |||
x- | |||
__ | |||
- _ _ _ _ _ - | |||
.u | |||
- - - | |||
- - - - - - - | |||
. | |||
SEP 281988 | |||
' | |||
- | |||
- | |||
. | . | ||
, | |||
, | |||
Georgia Power Cornpany | |||
2 | |||
cc w/ encl: | |||
R. P. Mcdonald, Executive Vice | |||
President, Nuclear Operations | |||
P. D. Rice, Vice President, Project | |||
Director | |||
C. W. Hayes, Vogtle Quality | |||
Assurance Manager | |||
G. Bockhold, Jr., General Manager, | |||
Nuclear Operations | |||
J. P. Kane, Manager Licensing | |||
and Engineering | |||
J. A. Bailey, Project Licensing | |||
Manager | |||
B. W. Churchill, Esq., Shaw, | |||
Pittman, Potts and Trowbridge | |||
D. Kirkland, III, Counsel, | |||
Office of the Consumer's Utility | |||
Council | |||
D. Feig, Georgians Against | |||
Nuclear Energy | |||
State of Georgia | |||
bec w/ encl: | |||
E. Reis, OGC | |||
J. Hopkins, NRR | |||
M. Sinkule, RII | |||
DRS, Technical Assistant | |||
NRC Resident Inspector | |||
Document Control Desk | |||
l | |||
l | |||
/ | |||
R!%};[ | |||
RIL K | |||
RII gp | |||
JRHarris:es | |||
TEConlon | |||
fiSinkule | |||
9/)l/08 | |||
9/Bl/88 | |||
9/ 4/88 | |||
7 | |||
}} | }} | ||
Latest revision as of 21:34, 10 December 2024
| ML20155E959 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 09/28/1988 |
| From: | Herdt A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hairston W GEORGIA POWER CO. |
| Shared Package | |
| ML20155E964 | List: |
| References | |
| RTR-NUREG-1055 NUDOCS 8810130076 | |
| Download: ML20155E959 (2) | |
See also: IR 05000425/1988047
Text
,..
- _ _ _ _ _ _ _ _ _
_
., .
'*
-
.
,
SEP 28 '988
^
Docket No. 50-425
License No. CPPR-109
Georgia Power Company
ATTN: Mr. W. G. Hairston, III
Senior Vice President -
Nuclear Operations
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NO. 50-425/88-47
This refers to the Nuclear Regulatory Comission (NRC) inspection conducted
by J. R. Harris on August 15-19, 1988.
The inspection included a review of
activities authorized for your Vogtle facility.
At the conclusion af the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
Within the scope of the inspection, no violations or deviations were
identified.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
C
V
Alan R. I 2rdt, Chief
Engineering Branch
Division of Reactor Safety
Enclosure:
NRC Inspection Report
cc:
(See page 2)
0010130076 000920
ADOCK 0D000425
0
PNV
x-
__
- _ _ _ _ _ -
.u
- - -
- - - - - - -
.
SEP 281988
'
-
-
.
,
,
Georgia Power Cornpany
2
cc w/ encl:
R. P. Mcdonald, Executive Vice
President, Nuclear Operations
P. D. Rice, Vice President, Project
Director
C. W. Hayes, Vogtle Quality
Assurance Manager
G. Bockhold, Jr., General Manager,
Nuclear Operations
J. P. Kane, Manager Licensing
and Engineering
J. A. Bailey, Project Licensing
Manager
B. W. Churchill, Esq., Shaw,
Pittman, Potts and Trowbridge
D. Kirkland, III, Counsel,
Office of the Consumer's Utility
Council
D. Feig, Georgians Against
Nuclear Energy
State of Georgia
bec w/ encl:
E. Reis, OGC
J. Hopkins, NRR
M. Sinkule, RII
DRS, Technical Assistant
NRC Resident Inspector
Document Control Desk
l
l
/
R!%};[
RIL K
RII gp
JRHarris:es
TEConlon
fiSinkule
9/)l/08
9/Bl/88
9/ 4/88
7