ML20155E959: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:,..                                           - _ _ _ _ _ _ _ _ _
{{#Wiki_filter:,..
                                                                                              _
- _ _ _ _ _ _ _ _ _
  ., .
_
            '*                 -
., .
      .
'*
                          ,
-
.
,
SEP 28 '988
^
^
                                                                              SEP 28 '988
Docket No. 50-425
                Docket No. 50-425
License No. CPPR-109
                License No. CPPR-109
Georgia Power Company
                Georgia Power Company
ATTN: Mr. W. G. Hairston, III
                ATTN: Mr. W. G. Hairston, III
Senior Vice President -
                        Senior Vice President -
Nuclear Operations
                          Nuclear Operations
P. O. Box 4545
                P. O. Box 4545
Atlanta, GA 30302
                Atlanta, GA 30302
Gentlemen:
                Gentlemen:
SUBJECT:
                SUBJECT:     NRC INSPECTION REPORT NO. 50-425/88-47
NRC INSPECTION REPORT NO. 50-425/88-47
                This refers to the Nuclear Regulatory Comission (NRC) inspection conducted
This refers to the Nuclear Regulatory Comission (NRC) inspection conducted
                by J. R. Harris on August 15-19, 1988. The inspection included a review of
by J. R. Harris on August 15-19, 1988.
                activities authorized for your Vogtle facility.                                   At the conclusion af the
The inspection included a review of
                inspection, the findings were discussed with those members of your staff
activities authorized for your Vogtle facility.
                identified in the enclosed inspection report.
At the conclusion af the
                Areas examined during the inspection are identified in the report.                                   Within
inspection, the findings were discussed with those members of your staff
                these areas, the inspection consisted of selective examinations of procedures
identified in the enclosed inspection report.
                and representative records, interviews with personnel, and observation of
Areas examined during the inspection are identified in the report.
                activities in progress.
Within
                Within the scope of the inspection, no violations or deviations were
these areas, the inspection consisted of selective examinations of procedures
                identified.
and representative records, interviews with personnel, and observation of
                In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
activities in progress.
                Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
Within the scope of the inspection, no violations or deviations were
                will be placed in the NRC Public Document Room.
identified.
                Should you have any questions concerning this letter, please contact us.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
                                                                                      Sincerely,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
                                                                                          C
will be placed in the NRC Public Document Room.
                                                                                        V
Should you have any questions concerning this letter, please contact us.
                                                                                      Alan R. I 2rdt, Chief
Sincerely,
                                                                                      Engineering Branch
C
                                                                                      Division of Reactor Safety
V
                Enclosure:
Alan R. I 2rdt, Chief
                NRC Inspection Report
Engineering Branch
                cc:   (See page 2)
Division of Reactor Safety
                0010130076 000920
Enclosure:
                PDR
NRC Inspection Report
                0      ADOCK 0D000425
cc:
                                    PNV
(See page 2)
        __                                 - _ _ _ _ _ -
0010130076 000920
                                                                                                                            x-
PDR
ADOCK 0D000425
0
PNV
x-
__
- _ _ _ _ _ -


                                                                      - - - - - - - - - -
.u
    .u
- - -
- - - - - - -
.
SEP 281988
'
-
-
.
.
            '
,
    -
,
  ,
Georgia Power Cornpany
      -
2
                    ,
cc w/ encl:
                          .
R. P. Mcdonald, Executive Vice
                                                              SEP 281988
President, Nuclear Operations
        Georgia Power Cornpany                   2
P. D. Rice, Vice President, Project
        cc w/ encl:
Director
        R. P. Mcdonald, Executive Vice
C. W. Hayes, Vogtle Quality
          President, Nuclear Operations
Assurance Manager
        P. D. Rice, Vice President, Project
G. Bockhold, Jr., General Manager,
            Director
Nuclear Operations
        C. W. Hayes, Vogtle Quality
J. P. Kane, Manager Licensing
          Assurance Manager
and Engineering
        G. Bockhold, Jr., General Manager,
J. A. Bailey, Project Licensing
            Nuclear Operations
Manager
        J. P. Kane, Manager Licensing
B. W. Churchill, Esq., Shaw,
            and Engineering
Pittman, Potts and Trowbridge
        J. A. Bailey, Project Licensing
D. Kirkland, III, Counsel,
            Manager
Office of the Consumer's Utility
        B. W. Churchill, Esq., Shaw,
Council
            Pittman, Potts and Trowbridge
D. Feig, Georgians Against
        D. Kirkland, III, Counsel,
Nuclear Energy
            Office of the Consumer's Utility
State of Georgia
            Council
bec w/ encl:
        D. Feig, Georgians Against
E. Reis, OGC
            Nuclear Energy
J. Hopkins, NRR
        State of Georgia
M. Sinkule, RII
        bec w/ encl:
DRS, Technical Assistant
        E. Reis, OGC
NRC Resident Inspector
        J. Hopkins, NRR
Document Control Desk
        M. Sinkule, RII
l
        DRS, Technical Assistant
l
        NRC Resident Inspector
/
          Document Control Desk
R!%};[
                                                                                          l
RIL K
                                                                                          l
RII gp
                                                                                          I
JRHarris:es
          R!%};[                         RIL K /    RII gp
TEConlon
          JRHarris:es                     TEConlon   fiSinkule                             l
fiSinkule
          9/)l/08                         9/Bl/88   9/74/88
9/)l/08
9/Bl/88
9/ 4/88
7
}}
}}

Latest revision as of 21:34, 10 December 2024

Forwards Insp Rept 50-425/88-47 on 880815-19.No Violations or Deviations Noted
ML20155E959
Person / Time
Site: Vogtle 
Issue date: 09/28/1988
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20155E964 List:
References
RTR-NUREG-1055 NUDOCS 8810130076
Download: ML20155E959 (2)


See also: IR 05000425/1988047

Text

,..

- _ _ _ _ _ _ _ _ _

_

., .

'*

-

.

,

SEP 28 '988

^

Docket No. 50-425

License No. CPPR-109

Georgia Power Company

ATTN: Mr. W. G. Hairston, III

Senior Vice President -

Nuclear Operations

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NO. 50-425/88-47

This refers to the Nuclear Regulatory Comission (NRC) inspection conducted

by J. R. Harris on August 15-19, 1988.

The inspection included a review of

activities authorized for your Vogtle facility.

At the conclusion af the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Within the scope of the inspection, no violations or deviations were

identified.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

C

V

Alan R. I 2rdt, Chief

Engineering Branch

Division of Reactor Safety

Enclosure:

NRC Inspection Report

cc:

(See page 2)

0010130076 000920

PDR

ADOCK 0D000425

0

PNV

x-

__

- _ _ _ _ _ -

.u

- - -

- - - - - - -

.

SEP 281988

'

-

-

.

,

,

Georgia Power Cornpany

2

cc w/ encl:

R. P. Mcdonald, Executive Vice

President, Nuclear Operations

P. D. Rice, Vice President, Project

Director

C. W. Hayes, Vogtle Quality

Assurance Manager

G. Bockhold, Jr., General Manager,

Nuclear Operations

J. P. Kane, Manager Licensing

and Engineering

J. A. Bailey, Project Licensing

Manager

B. W. Churchill, Esq., Shaw,

Pittman, Potts and Trowbridge

D. Kirkland, III, Counsel,

Office of the Consumer's Utility

Council

D. Feig, Georgians Against

Nuclear Energy

State of Georgia

bec w/ encl:

E. Reis, OGC

J. Hopkins, NRR

M. Sinkule, RII

DRS, Technical Assistant

NRC Resident Inspector

Document Control Desk

l

l

/

R!%};[

RIL K

RII gp

JRHarris:es

TEConlon

fiSinkule

9/)l/08

9/Bl/88

9/ 4/88

7