{{#Wiki_filter:c-;                                   ,
{{#Wiki_filter:c-;
June 1, 1988 Docket No. 50-213                             OISTRIBUTION                         .
June 1, 1988 Docket No. 50-213 OISTRIBUTION aD5HitiFUii%
aD5HitiFUii%           Edordan       l NRC T Efesl"PORs     JPartlow SVarga               T8arnhart(4)
Edordan NRC T Efesl"PORs JPartlow SVarga T8arnhart(4)
Mr. Edward J. Mroczka                         BBoger               Wanda Jones Senior Vice President                         SNorris               EButcher Connecticut Yankee Atomic Power Company       AWang                 ACRS(10)
Mr. Edward J. Mroczka BBoger Wanda Jones Senior Vice President SNorris EButcher Connecticut Yankee Atomic Power Company AWang ACRS(10)
P. O. Box 270                                 OGC-WF               GPA/PA Hartford, Connecticut 06141-0270               0Hagan               ARM /LFNB     ;
P. O. Box 270 OGC-WF GPA/PA Hartford, Connecticut 06141-0270 0Hagan ARM /LFNB Gray File i
Gray File                           i


==Dear Mr. Mroczka:==
==Dear Mr. Mroczka:==
==SUBJECT:==
==SUBJECT:==
ISSUANCE OF AMENDMENT (TAC N0. 67212)
ISSUANCE OF AMENDMENT (TAC N0. 67212)
The Cormission has issued the enclosed Amendment No.104 to facility Operating License No. OPR-61 for the Haddam Neck. Plant, in response to your application dated Febtvary 9,1988.
The Cormission has issued the enclosed Amendment No.104 to facility Operating License No. OPR-61 for the Haddam Neck. Plant, in response to your application dated Febtvary 9,1988.
The amendment increases the required number of Halon storage cylinders in the switchgear room in Technical Specification Section 3.22.C.1 from seven (7) to eight (8), increases the number _of smoke detectors in the switchgear room from 32 to 35 in Table 3.22-2 and changes the requirement in Table 3.22-2 to require eight (8) of nine (9) smoke detectors to be in service within the Screenwell Building. In addition, Table 3.22-2 is being revised to reflect new fire areas in the Primary Auxiliary Building and, Screenwell Building that agree with the current fire Hazard Analysis.
The amendment increases the required number of Halon storage cylinders in the switchgear room in Technical Specification Section 3.22.C.1 from seven (7) to eight (8), increases the number _of smoke detectors in the switchgear room from 32 to 35 in Table 3.22-2 and changes the requirement in Table 3.22-2 to require eight (8) of nine (9) smoke detectors to be in service within the Screenwell Building.
A copy of the related Safety Evaluation is also enclosed. The notice of issuance will be included in the Comission's bi-weekly Federal Register notice.
In addition, Table 3.22-2 is being revised to reflect new fire areas in the Primary Auxiliary Building and, Screenwell Building that agree with the current fire Hazard Analysis.
A copy of the related Safety Evaluation is also enclosed.
The notice of issuance will be included in the Comission's bi-weekly Federal Register notice.
Sincerely, original signed by Alan B. Wang, Project Manager Project Directorate I-4 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation
Sincerely, original signed by Alan B. Wang, Project Manager Project Directorate I-4 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation


==Enclosures:==
==Enclosures:==
: 1. Amendment No.104 to DPR-61
1.
: 2. Safety Evaluation cc w/ enclosures:
Amendment No.104 to DPR-61 2.
See next page LA:RO Q-4       PM:P i 4           Q   1-4             OGC   t SNoTr~1s 0 //o/88 AWa   d           J al                       N o
Safety Evaluation cc w/ enclosures:
Og/i/88           Og//                 0     88 8806170123 880601 PDR   ADOCK 05000213 P                   PDR
See next page LA:RO Q-4 PM:P i 4 Q
1-4 OGC t
SNoTr~1s AWa d
J al N
Og/i/88 Og//
0 //o/88 o
0 88 8806170123 880601 PDR ADOCK 05000213 P
PDR


i
i
'I '
'I t
                                                                                                    )
Mr. Edward J. Mroczka Connecticut Yankee Atomic Power Company Haddam Neck Plant cc:
t Mr. Edward J. Mroczka Connecticut Yankee Atomic Power Company           Haddam Neck Plant l
Gerald Garfield, Esquire R. M. Kacich, Manager Day, Berry and Howard Generation Facilities Licensing Counselors at Law Northeast Utilities Service Company City Place Post Office Box 270 Hartford, Connecticut 06103-3499 Hartford, Connecticut 06141-0270 W. D. Romberg, Vice President D. O. Nordquist Nuclear Operations Manager of Quality Assurance Northeast Utilities Service Company Northeast Nuclear Energy Company Post Office Box 270 Post Office Box 270 Hartford, Connecticut 06141-0270 Hartford, Connecticut 06141-0270 Kevin McCarthy, Director Regional Administrator Radiation Control Unit Region i Department of Environmental Protection U. S. Nuclear Regulatary Commission State Office Building 475'Allendale Road Hartford, Connecticut 06106 King of Prussia, Pennsylvania 11406 Bradford S. Chase, Under Secretary Board of Selectmen Energy Division Town Hall Office of Policy and Management Haddam, Connecticut 06103 80 Washington Street Hartford, Connecticut 06106 J. T. Shediosky, Resident inspector Haddam Neck Plant D. B. Miller, Station Superintendent c/o V. S. Nuclear Regulatory Commission Haddam Neck Plant Post Office Box 116 Connecticut Yankee Atomic Power Company East Haddam Post Office RF0 1, Post Office Box 127E East Haddam, Connecticut 06423 East Hampton, Connecticut 06424 G. H. Bouchard, Unit Superintendent Haddam Neck Plant RF0 il Post Office Box 127E East Hanpton, Connecticut 06424
cc:                                                                                           l Gerald Garfield, Esquire                           R. M. Kacich, Manager Day, Berry and Howard                             Generation Facilities Licensing Counselors at Law Northeast Utilities Service Company         l City Place                                         Post Office Box 270                         l Hartford, Connecticut 06103-3499                   Hartford, Connecticut 06141-0270 W. D. Romberg, Vice President                     D. O. Nordquist Nuclear Operations                               Manager of Quality Assurance Northeast Utilities Service Company               Northeast Nuclear Energy Company Post Office Box 270                               Post Office Box 270 Hartford, Connecticut 06141-0270                   Hartford, Connecticut 06141-0270 Kevin McCarthy, Director                           Regional Administrator Radiation Control Unit                           Region i Department of Environmental Protection           U. S. Nuclear Regulatary Commission State Office Building                             475'Allendale Road                           I Hartford, Connecticut 06106                       King of Prussia, Pennsylvania 11406         ;
-- -}}
Bradford S. Chase, Under Secretary                 Board of Selectmen Energy Division                                   Town Hall                                   l Office of Policy and Management                   Haddam, Connecticut 06103                   1 80 Washington Street Hartford, Connecticut 06106                       J. T. Shediosky, Resident inspector I
l Haddam Neck Plant D. B. Miller, Station Superintendent             c/o V. S. Nuclear Regulatory Commission Haddam Neck Plant                                 Post Office Box 116 Connecticut Yankee Atomic Power Company           East Haddam Post Office RF0 1, Post Office Box 127E                       East Haddam, Connecticut 06423 East Hampton, Connecticut 06424 G. H. Bouchard, Unit Superintendent Haddam Neck Plant RF0 il Post Office Box 127E East Hanpton, Connecticut 06424
                                          - _ - - - - - -          -    -    - - -      .}}

Latest revision as of 21:22, 10 December 2024

Forwards Amend 104 to License DPR-61 & Safety Evaluation. Amend Increases Required Number of Halon Storage Cylinders in Switchgear Room (SR) in Tech Spec 3.22.C.1 from 7 to 8 & of Smoke Detectors in SR from 32 to 35 in Table 3.22-2
ML20155F957
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 06/01/1988
From: Wang A
Office of Nuclear Reactor Regulation
To: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20155F958 List:
References
TAC-67212, NUDOCS 8806170123
Download: ML20155F957 (2)


Text

c-;

June 1, 1988 Docket No. 50-213 OISTRIBUTION aD5HitiFUii%

Edordan NRC T Efesl"PORs JPartlow SVarga T8arnhart(4)

Mr. Edward J. Mroczka BBoger Wanda Jones Senior Vice President SNorris EButcher Connecticut Yankee Atomic Power Company AWang ACRS(10)

P. O. Box 270 OGC-WF GPA/PA Hartford, Connecticut 06141-0270 0Hagan ARM /LFNB Gray File i

Dear Mr. Mroczka:

SUBJECT:

ISSUANCE OF AMENDMENT (TAC N0. 67212)

The Cormission has issued the enclosed Amendment No.104 to facility Operating License No. OPR-61 for the Haddam Neck. Plant, in response to your application dated Febtvary 9,1988.

The amendment increases the required number of Halon storage cylinders in the switchgear room in Technical Specification Section 3.22.C.1 from seven (7) to eight (8), increases the number _of smoke detectors in the switchgear room from 32 to 35 in Table 3.22-2 and changes the requirement in Table 3.22-2 to require eight (8) of nine (9) smoke detectors to be in service within the Screenwell Building.

In addition, Table 3.22-2 is being revised to reflect new fire areas in the Primary Auxiliary Building and, Screenwell Building that agree with the current fire Hazard Analysis.

A copy of the related Safety Evaluation is also enclosed.

The notice of issuance will be included in the Comission's bi-weekly Federal Register notice.

Sincerely, original signed by Alan B. Wang, Project Manager Project Directorate I-4 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation

Enclosures:

1.

Amendment No.104 to DPR-61 2.

Safety Evaluation cc w/ enclosures:

See next page LA:RO Q-4 PM:P i 4 Q

1-4 OGC t

SNoTr~1s AWa d

J al N

Og/i/88 Og//

0 //o/88 o

0 88 8806170123 880601 PDR ADOCK 05000213 P

PDR

i

'I t

Mr. Edward J. Mroczka Connecticut Yankee Atomic Power Company Haddam Neck Plant cc:

Gerald Garfield, Esquire R. M. Kacich, Manager Day, Berry and Howard Generation Facilities Licensing Counselors at Law Northeast Utilities Service Company City Place Post Office Box 270 Hartford, Connecticut 06103-3499 Hartford, Connecticut 06141-0270 W. D. Romberg, Vice President D. O. Nordquist Nuclear Operations Manager of Quality Assurance Northeast Utilities Service Company Northeast Nuclear Energy Company Post Office Box 270 Post Office Box 270 Hartford, Connecticut 06141-0270 Hartford, Connecticut 06141-0270 Kevin McCarthy, Director Regional Administrator Radiation Control Unit Region i Department of Environmental Protection U. S. Nuclear Regulatary Commission State Office Building 475'Allendale Road Hartford, Connecticut 06106 King of Prussia, Pennsylvania 11406 Bradford S. Chase, Under Secretary Board of Selectmen Energy Division Town Hall Office of Policy and Management Haddam, Connecticut 06103 80 Washington Street Hartford, Connecticut 06106 J. T. Shediosky, Resident inspector Haddam Neck Plant D. B. Miller, Station Superintendent c/o V. S. Nuclear Regulatory Commission Haddam Neck Plant Post Office Box 116 Connecticut Yankee Atomic Power Company East Haddam Post Office RF0 1, Post Office Box 127E East Haddam, Connecticut 06423 East Hampton, Connecticut 06424 G. H. Bouchard, Unit Superintendent Haddam Neck Plant RF0 il Post Office Box 127E East Hanpton, Connecticut 06424

-- -