ML20196E878: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:.
                                                                                                        !
.
  .
December 1, 1998
                                              December 1, 1998
j
                                                                                                        j
Mr. M. Wadley
    Mr. M. Wadley
President, Nuclear Generation
    President, Nuclear Generation                                                                       i
i
    Northern States Power Company                                                                       I
Northern States Power Company
    414 Nicollet Mall                                                                                   l
414 Nicollet Mall
    Minneapolis, MN 55401
Minneapolis, MN 55401
    SUBJECT:       NRC RADIATION P.''tOTECTION INSPECTION REPORTS 50-282/98022(DRS);
SUBJECT:
                    50-306/98022(DRS)                                                                   !
NRC RADIATION P.''tOTECTION INSPECTION REPORTS 50-282/98022(DRS);
                                                                                                        !
50-306/98022(DRS)
    Dear Mr. Wadley:
Dear Mr. Wadley:
    On November 20,1998, the NRC completed an inspection at your Prairie Island Nuclear
On November 20,1998, the NRC completed an inspection at your Prairie Island Nuclear
    Generating Plant. The enclosed report presents the results of that inspection. The inspection
Generating Plant. The enclosed report presents the results of that inspection. The inspection
    examined activities conducted under your license related to radiation safety and to compliance
examined activities conducted under your license related to radiation safety and to compliance
    with the Commission's rules and regulations and with the conditions of your license.
with the Commission's rules and regulations and with the conditions of your license.
    Areas examined during the inspection included surveys for the free release of turbine
Areas examined during the inspection included surveys for the free release of turbine
    components, walkdowns within the containment, auxiliary and radwaste buildings, observation
components, walkdowns within the containment, auxiliary and radwaste buildings, observation
    of various work activities in progress, shutdown chemistry, and planning to ensure that jobs
of various work activities in progress, shutdown chemistry, and planning to ensure that jobs
    were conducted to maintain the radiation dose As-Low-As-is-Reasonably-Achievable (ALARA).
were conducted to maintain the radiation dose As-Low-As-is-Reasonably-Achievable (ALARA).
    Within these areas, the inspection consisted of a selective examination of procedures and
Within these areas, the inspection consisted of a selective examination of procedures and
    representative records, observations, and interviews with personnel. No violations of NRC
representative records, observations, and interviews with personnel. No violations of NRC
    requirements or open items were identified.
requirements or open items were identified.
    Overall, the radiological controls were effective in maintaining a reasonable collective dose for
Overall, the radiological controls were effective in maintaining a reasonable collective dose for
    the work being conducted during the Unit 2 refueling outage. The surveys and controls for the
the work being conducted during the Unit 2 refueling outage. The surveys and controls for the
    free release of turbine components were thorough, and ALARA planning and shutdown
free release of turbine components were thorough, and ALARA planning and shutdown
    chemistry were wellimplemented. The radiation protection staff and radworker performance
chemistry were wellimplemented. The radiation protection staff and radworker performance
    was effective, and the minor discrepancies that were identified were addressed promptly by
was effective, and the minor discrepancies that were identified were addressed promptly by
    your staff.
your staff.
    In accordance with 10 CFR 2.790 of the NRC's " Rules and Practice," a copy of this letter and its
In accordance with 10 CFR 2.790 of the NRC's " Rules and Practice," a copy of this letter and its
    enclosures will be placed in the NRC Public Document Room.
enclosures will be placed in the NRC Public Document Room.
                                                                                                      it
it
                                                                                                g do
do
    9812040151 981201                                                                       /
g
    gDR     ADOCK 05000282
9812040151 981201
                            PDR
/
gDR
ADOCK 05000282
PDR
l
l


  ;
;
  :
:
  e
e
      M. Wadley                                                                 -2-
M. Wadley
    We will gladly discuss any questions you have concerning this inspection.
-2-
                                                                    Sincerely,
We will gladly discuss any questions you have concerning this inspection.
                                                        Original Signed by Gary L. Shear
Sincerely,
                                                                    Gary L. Shear, Chief
Original Signed by Gary L. Shear
                                                                    Plant Support Branch 2
Gary L. Shear, Chief
      Docket Nos.: 50-282: 50-306
Plant Support Branch 2
      License Nos.: DPR-42; DPR-60
Docket Nos.: 50-282: 50-306
      Enclosure:               Inspection Reports 50-282/98022(DRS); 50-306/98022(DRS)
License Nos.: DPR-42; DPR-60
      cc w/ encl:               Plant Manager, Prairie Island
Enclosure:
                                State Liaison Officer, State of Minnesota
Inspection Reports 50-282/98022(DRS); 50-306/98022(DRS)
                                State Liaison Officer, State of Wisconsin
cc w/ encl:
                              Tribal Council, Prairie Island Dakota Community
Plant Manager, Prairie Island
      Distribution:
State Liaison Officer, State of Minnesota
      CAC (E-Mail)
State Liaison Officer, State of Wisconsin
      RPC (E-Mail)
Tribal Council, Prairie Island Dakota Community
    . Project Mgr., NRR w/enci
Distribution:
      J. Caldwell, Rill w/ enc!
CAC (E-Mail)
      C. Pederson, Rlil w/enct
RPC (E-Mail)
      B. Clayton, Rill w/encI
. Project Mgr., NRR w/enci
      SRI Prairie Island w/enci
J. Caldwell, Rill w/ enc!
      DRP w/enct
C. Pederson, Rlil w/enct
                                                                                                                                j
B. Clayton, Rill w/encI
    TSS w/ encl
SRI Prairie Island w/enci
      DRS (2) w/enci
j
      Rlli P                       -
DRP w/enct
      PU                             nc!
TSS w/ encl
      Docket                     nel
DRS (2) w/enci
      GREENS
Rlli P
      LEO (E-Mail)
-
      DOCDESK (E-Mail)
PU
i     DOCUMENT NAME: G:\DRS\PRA98022.WPD
nc!
      1e ,eceive e copy of thle clocument, indcate in the bou "C" e Copy u4 ellecNonci'T' * Cap r wlettech/enci"tr * No enpy
Docket
        OFFICE             Rlli                   lE Rlli SAb                       l l\J     Rill                       l5   l
nel
        NAME               Glinski:sd/jp &                   '. 'eg? ''h M 5                   Shear (.J45
GREENS
                                                                                    '
LEO (E-Mail)
,    1   DATE               12// /98                           12/ l /98                         12// /98
DOCDESK (E-Mail)
                                                                OFFICIAL RECORD COPY
i
DOCUMENT NAME: G:\\DRS\\PRA98022.WPD
1e ,eceive e copy of thle clocument, indcate in the bou "C" e Copy u4 ellecNonci'T' * Cap r wlettech/enci"tr * No enpy
OFFICE
Rlli
lE
Rlli SAb
l l\\J
Rill
l5
l
NAME
Glinski:sd/jp &
' 'eg? ''h M 5
Shear (.J45
.
'
1 DATE
12// /98
12/ l /98
12// /98
,
OFFICIAL RECORD COPY
f
f
        040013
040013
L
L
}}
}}

Latest revision as of 16:42, 10 December 2024

Forwards Insp Repts 50-282/98-22 & 50-306/98-22 on 981116- 20.No Violations Noted.Overall,Radiological Controls Were Effective in Maintaining Reasonable Collective Dose for Work Being Conducted During Unit 2 Refueling Outage
ML20196E878
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 12/01/1998
From: Shear G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Wadley M
NORTHERN STATES POWER CO.
Shared Package
ML20196E883 List:
References
50-282-98-22, 50-306-98-22, NUDOCS 9812040151
Download: ML20196E878 (2)


See also: IR 05000282/1998022

Text

.

.

December 1, 1998

j

Mr. M. Wadley

President, Nuclear Generation

i

Northern States Power Company

414 Nicollet Mall

Minneapolis, MN 55401

SUBJECT:

NRC RADIATION P.tOTECTION INSPECTION REPORTS 50-282/98022(DRS);

50-306/98022(DRS)

Dear Mr. Wadley:

On November 20,1998, the NRC completed an inspection at your Prairie Island Nuclear

Generating Plant. The enclosed report presents the results of that inspection. The inspection

examined activities conducted under your license related to radiation safety and to compliance

with the Commission's rules and regulations and with the conditions of your license.

Areas examined during the inspection included surveys for the free release of turbine

components, walkdowns within the containment, auxiliary and radwaste buildings, observation

of various work activities in progress, shutdown chemistry, and planning to ensure that jobs

were conducted to maintain the radiation dose As-Low-As-is-Reasonably-Achievable (ALARA).

Within these areas, the inspection consisted of a selective examination of procedures and

representative records, observations, and interviews with personnel. No violations of NRC

requirements or open items were identified.

Overall, the radiological controls were effective in maintaining a reasonable collective dose for

the work being conducted during the Unit 2 refueling outage. The surveys and controls for the

free release of turbine components were thorough, and ALARA planning and shutdown

chemistry were wellimplemented. The radiation protection staff and radworker performance

was effective, and the minor discrepancies that were identified were addressed promptly by

your staff.

In accordance with 10 CFR 2.790 of the NRC's " Rules and Practice," a copy of this letter and its

enclosures will be placed in the NRC Public Document Room.

it

do

g

9812040151 981201

/

gDR

ADOCK 05000282

PDR

l

e

M. Wadley

-2-

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Original Signed by Gary L. Shear

Gary L. Shear, Chief

Plant Support Branch 2

Docket Nos.: 50-282: 50-306

License Nos.: DPR-42; DPR-60

Enclosure:

Inspection Reports 50-282/98022(DRS); 50-306/98022(DRS)

cc w/ encl:

Plant Manager, Prairie Island

State Liaison Officer, State of Minnesota

State Liaison Officer, State of Wisconsin

Tribal Council, Prairie Island Dakota Community

Distribution:

CAC (E-Mail)

RPC (E-Mail)

. Project Mgr., NRR w/enci

J. Caldwell, Rill w/ enc!

C. Pederson, Rlil w/enct

B. Clayton, Rill w/encI

SRI Prairie Island w/enci

j

DRP w/enct

TSS w/ encl

DRS (2) w/enci

Rlli P

-

PU

nc!

Docket

nel

GREENS

LEO (E-Mail)

DOCDESK (E-Mail)

i

DOCUMENT NAME: G:\\DRS\\PRA98022.WPD

1e ,eceive e copy of thle clocument, indcate in the bou "C" e Copy u4 ellecNonci'T' * Cap r wlettech/enci"tr * No enpy

OFFICE

Rlli

lE

Rlli SAb

l l\\J

Rill

l5

l

NAME

Glinski:sd/jp &

' 'eg? h M 5

Shear (.J45

.

'

1 DATE

12// /98

12/ l /98

12// /98

,

OFFICIAL RECORD COPY

f

040013

L