ML20196E878
| ML20196E878 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 12/01/1998 |
| From: | Shear G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Wadley M NORTHERN STATES POWER CO. |
| Shared Package | |
| ML20196E883 | List: |
| References | |
| 50-282-98-22, 50-306-98-22, NUDOCS 9812040151 | |
| Download: ML20196E878 (2) | |
See also: IR 05000282/1998022
Text
.
.
December 1, 1998
j
Mr. M. Wadley
President, Nuclear Generation
i
Northern States Power Company
414 Nicollet Mall
Minneapolis, MN 55401
SUBJECT:
NRC RADIATION P.tOTECTION INSPECTION REPORTS 50-282/98022(DRS);
50-306/98022(DRS)
Dear Mr. Wadley:
On November 20,1998, the NRC completed an inspection at your Prairie Island Nuclear
Generating Plant. The enclosed report presents the results of that inspection. The inspection
examined activities conducted under your license related to radiation safety and to compliance
with the Commission's rules and regulations and with the conditions of your license.
Areas examined during the inspection included surveys for the free release of turbine
components, walkdowns within the containment, auxiliary and radwaste buildings, observation
of various work activities in progress, shutdown chemistry, and planning to ensure that jobs
were conducted to maintain the radiation dose As-Low-As-is-Reasonably-Achievable (ALARA).
Within these areas, the inspection consisted of a selective examination of procedures and
representative records, observations, and interviews with personnel. No violations of NRC
requirements or open items were identified.
Overall, the radiological controls were effective in maintaining a reasonable collective dose for
the work being conducted during the Unit 2 refueling outage. The surveys and controls for the
free release of turbine components were thorough, and ALARA planning and shutdown
chemistry were wellimplemented. The radiation protection staff and radworker performance
was effective, and the minor discrepancies that were identified were addressed promptly by
your staff.
In accordance with 10 CFR 2.790 of the NRC's " Rules and Practice," a copy of this letter and its
enclosures will be placed in the NRC Public Document Room.
it
do
g
9812040151 981201
/
gDR
ADOCK 05000282
l
e
M. Wadley
-2-
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
Original Signed by Gary L. Shear
Gary L. Shear, Chief
Plant Support Branch 2
Docket Nos.: 50-282: 50-306
Enclosure:
Inspection Reports 50-282/98022(DRS); 50-306/98022(DRS)
cc w/ encl:
Plant Manager, Prairie Island
State Liaison Officer, State of Minnesota
State Liaison Officer, State of Wisconsin
Tribal Council, Prairie Island Dakota Community
Distribution:
CAC (E-Mail)
RPC (E-Mail)
. Project Mgr., NRR w/enci
J. Caldwell, Rill w/ enc!
C. Pederson, Rlil w/enct
B. Clayton, Rill w/encI
SRI Prairie Island w/enci
j
DRP w/enct
TSS w/ encl
DRS (2) w/enci
Rlli P
-
PU
nc!
Docket
nel
GREENS
LEO (E-Mail)
DOCDESK (E-Mail)
i
DOCUMENT NAME: G:\\DRS\\PRA98022.WPD
1e ,eceive e copy of thle clocument, indcate in the bou "C" e Copy u4 ellecNonci'T' * Cap r wlettech/enci"tr * No enpy
OFFICE
Rlli
lE
Rlli SAb
l l\\J
Rill
l5
l
NAME
Glinski:sd/jp &
' 'eg? h M 5
Shear (.J45
.
'
1 DATE
12// /98
12/ l /98
12// /98
,
OFFICIAL RECORD COPY
f
040013
L