{{#Wiki_filter:s                                                                                      !
{{#Wiki_filter:' O {%%
                                                                                        ' O {%%L MAY 2 s m Duke Ppwer Company ATTN:gMr.H.B. Tucker,VicePresident Nuclear Production Department 422 South Church Street Charlotte, NC 28242 Gentlemen:
s L
MAY 2 s m Duke Ppwer Company ATTN:gMr.H.B. Tucker,VicePresident Nuclear Production Department 422 South Church Street Charlotte, NC 28242 Gentlemen:


==SUBJECT:==
==SUBJECT:==
GENERIC LETTER 83-28 INSPECTION AT CATAWBA NUCLEAR PLANT This letter is to inform you of our plans to conduct a special inspection of your actions as a result of Generic Letter 83-28, Required Actions Based on Generic Implication of Salem ATWS Events.       The actions covered by this letter fall into the following four areas:
GENERIC LETTER 83-28 INSPECTION AT CATAWBA NUCLEAR PLANT This letter is to inform you of our plans to conduct a special inspection of your actions as a result of Generic Letter 83-28, Required Actions Based on Generic Implication of Salem ATWS Events.
: 1. Post-Trip Review
The actions covered by this letter fall into the following four areas:
: 2. Equipment Classification and Vendor Interface
1.
: 3. Post-Maintenance Testing
Post-Trip Review 2.
: 4. Reactor Trip System Reliability The inspection will be conducted at your Catawba plant during the period of July 7-11, 1986, by a four-member team led by Mr. Norman Merriweather of this office.
Equipment Classification and Vendor Interface 3.
During our inspection we normally review procedures and documentation associated with the four areas listed above. It would be appreciated if information appli-cable to these areas be readily available for our inspector's use. For informa-tion not available at the site, we request that the team be notified upon their arrival so further arrangements can be made.
Post-Maintenance Testing 4.
Reactor Trip System Reliability The inspection will be conducted at your Catawba plant during the period of July 7-11, 1986, by a four-member team led by Mr. Norman Merriweather of this office.
During our inspection we normally review procedures and documentation associated with the four areas listed above.
It would be appreciated if information appli-cable to these areas be readily available for our inspector's use.
For informa-tion not available at the site, we request that the team be notified upon their arrival so further arrangements can be made.
We have found it helpful if information (similar to enclosures) is provided which identifies applicable procedures, licensee contacts, and telephone numbers of those who are familiar with the licensees' effort in each of the categories listed in the Generic Letter.
We have found it helpful if information (similar to enclosures) is provided which identifies applicable procedures, licensee contacts, and telephone numbers of those who are familiar with the licensees' effort in each of the categories listed in the Generic Letter.
Additionally, our team will observe selected portions of safety-related mainte-nance that may be scheduled or in progress during the period which they are at the site. The team will request to observe the performance of your maintenance procedure for the Reactor Trip Breakers or other breakers of the same type by knowledgeable maintenance personnel.       Where this is not feasible, our team will ask for a " walk-through" demonstration.
Additionally, our team will observe selected portions of safety-related mainte-nance that may be scheduled or in progress during the period which they are at the site.
75 860523
The team will request to observe the performance of your maintenance procedure for the Reactor Trip Breakers or other breakers of the same type by knowledgeable maintenance personnel.
                    $j61jjyCK05000413 G
Where this is not feasible, our team will ask for a " walk-through" demonstration.
$j61jjyCK05000413 75 860523 G
PDR 1
PDR 1
l                                  ._ .
pol f l
pol f


MAY 3 8 g Duke Power Company                       2 Your cooperation' in making your records and staff available to support this inspection is appreciated.
MAY 3 8 g Duke Power Company 2
Your cooperation' in making your records and staff available to support this inspection is appreciated.
Any questions you may have or coordination efforts you would like to clarify should be referred to Mr. T. Peebles of our office.
Any questions you may have or coordination efforts you would like to clarify should be referred to Mr. T. Peebles of our office.
Sincerely,
Sincerely,
                                                /s/
/s/
Virgil L. Brownlee, Chief Reactor Projects Branch 3 Division of Reactor Projects
Virgil L. Brownlee, Chief Reactor Projects Branch 3 Division of Reactor Projects


==Enclosures:==
==Enclosures:==
: 1. Sample Outline of Generic Letter 83-28 with Cognizant Personnel and Applicable References
1.
: 2. Sample of Other Documentation and Points of Contact                                 .
Sample Outline of Generic Letter 83-28 with Cognizant Personnel and Applicable References 2.
pc w/encls:
Sample of Other Documentation and Points of Contact pc w/encls:
A . L. Dick, Vice President -
A. L. Dick, Vice President -
f Construction V J. W. Hampton, Station Manager b
f Construction V J. W. Hampton, Station Manager
  / ec   w/encls:
/ ec w/encls:
K. N. Jabbour, NRR
b K. N. Jabbour, NRR
  /NRCResidentInspector
/NRCResidentInspector
    ,/ Document Control Desk
,/ Document Control Desk
  / State of South Carolina Qi RI     /                           RII lg RII NMerriwea(her:pj (A
/ State of South Carolina Qi RI
TCon on       AHe dt           VBrownlee 5/pl/86               5/g /86       5/gy86         5/03/86
/
RII RII lg (A
NMerriwea(her:pj TCon on AHe dt VBrownlee 5/pl/86 5/g /86 5/gy86 5/03/86


ENCLOSURE 1 SAMPLE OUTLINE OF GENERIC LETTER 83-28 WITH COGNIZANT PERSONNEL AND APPLICABLE REFERENCES GL 83-28 ITEM / SUBJECT                     REFERENCE           POINT OF CONTACT 1.1 Post Trip Review               ADM-14         Supt Ops, Dave Christian, X-215 Supv SES, Doug Rickeard, X-288 1.2 Data and Info                 Response to   Supv SES, Doug Rickeard, X-288 Capability             GL 83-28 2.1A EQPT Class (RTS)             ADM-73         Supv SES, Doug Rickeard, X-288 2.1B Vendor Interface             ADM-93         Supv Records, Ed DeWandel, X-217 ADM-66         Supv Records, Ed DeWandel, X-217 ADM-48         Lic Coord, Buster Bilyeu, X-451 2.2.1         EQPT Class (All)     ADM-73         Supv, SES, Doug Rickeard, X-288 ADM-79         Supv Eng Plan, Mike Carson, X-500 ADM-86         Supt Maint, Wayne Kibler, X-214 ADM-61.3       Supv Maint Svce, Dick Mudd, X-447 2.2.2         Vendor Interface     ADM-93         Supt Records, Ed DeWandel, X-217 DM-73         Supt SES, Doug Rickaerd, X-288 3.1 Post Maint Testing             PC-DB-E/A1     Elect Eng, Joe DeMarco, X-557 3.2 Post Maint Testing             ADM-89         Elect Eng, Joe DeMarco, X-557 ADM-89.7       Elect Eng, Joe DeMarco, X-557 ADM-89.8       Elect Eng, Joe DeMarco, X-557 ADM-86         Supt Maint, Wayne Kibler, X-214 4.1 Rx Trip System                 PT-27.1         Elect Eng, Joe DeMarco, X-557 Reliability 4.2 Rx Trip System                 PC-DB-E/A1     Elect Eng, Joe Demarco, X-557 Reliability               PT-8.2 & 8.2   Supt Tech Sycs, Mike Kansler, X-27 PT-2.34       Supt Tech Svce, Mike Kansler, X-27 4.2.3&4 Life Cycle Testing         W OG Due to     Richmond, Bob Nichols, X-450 utilities by 10/18/84 4.3 Auto Shunt Trip Mod Elect Eng, Joe DeMarco, X-557 Auto Shunt Trip Testing                   Supt Projects, Gene Grecheck, X-204
ENCLOSURE 1 SAMPLE OUTLINE OF GENERIC LETTER 83-28 WITH COGNIZANT PERSONNEL AND APPLICABLE REFERENCES GL 83-28 ITEM / SUBJECT REFERENCE POINT OF CONTACT 1.1 Post Trip Review ADM-14 Supt Ops, Dave Christian, X-215 Supv SES, Doug Rickeard, X-288 1.2 Data and Info Response to Supv SES, Doug Rickeard, X-288 Capability GL 83-28 2.1A EQPT Class (RTS)
ADM-73 Supv SES, Doug Rickeard, X-288 2.1B Vendor Interface ADM-93 Supv Records, Ed DeWandel, X-217 ADM-66 Supv Records, Ed DeWandel, X-217 ADM-48 Lic Coord, Buster Bilyeu, X-451 2.2.1 EQPT Class (All)
ADM-73 Supv, SES, Doug Rickeard, X-288 ADM-79 Supv Eng Plan, Mike Carson, X-500 ADM-86 Supt Maint, Wayne Kibler, X-214 ADM-61.3 Supv Maint Svce, Dick Mudd, X-447 2.2.2 Vendor Interface ADM-93 Supt Records, Ed DeWandel, X-217 DM-73 Supt SES, Doug Rickaerd, X-288 3.1 Post Maint Testing PC-DB-E/A1 Elect Eng, Joe DeMarco, X-557 3.2 Post Maint Testing ADM-89 Elect Eng, Joe DeMarco, X-557 ADM-89.7 Elect Eng, Joe DeMarco, X-557 ADM-89.8 Elect Eng, Joe DeMarco, X-557 ADM-86 Supt Maint, Wayne Kibler, X-214 4.1 Rx Trip System PT-27.1 Elect Eng, Joe DeMarco, X-557 Reliability 4.2 Rx Trip System PC-DB-E/A1 Elect Eng, Joe Demarco, X-557 Reliability PT-8.2 & 8.2 Supt Tech Sycs, Mike Kansler, X-27 PT-2.34 Supt Tech Svce, Mike Kansler, X-27 4.2.3&4 Life Cycle Testing W OG Due to Richmond, Bob Nichols, X-450 utilities by 10/18/84 4.3 Auto Shunt Trip Mod Elect Eng, Joe DeMarco, X-557 Auto Shunt Trip Testing Supt Projects, Gene Grecheck, X-204


ENCLOSURE 2 OTHER DOCUMENTATION AND POINTS OF CONTACT ITEM / SUBJECT           REFERENCE                 POINT OF CONTACT FSAR                 Chap 14 in Place               Lic Coord, Buster Bilyeu X-451 Tech Specs               In Place                 Lic Coord, Buster Bilyeu, X-451 Engineering Specs                                   Supt SES, Doug Rickeard, X-288 Vendor Tech Manuals                                 Supv Records, Ed DeWandel, X-217 Design & Instln Drawings                           DC Eng, Don Padula, X-277 In Place Procedures               In Place (or Indices)     Admin Asst, John Costello, X-388 Procurement Records                                 Supv, Main Sycs, Dick Mudd, X-447 Design Change for RTS     DC 83-26 " Timing         DC Eng, Dick, Coupe, X-285 Reliability               Circuit Rx Trip Breakers" DC 84-06 & DC 84-07
ENCLOSURE 2 OTHER DOCUMENTATION AND POINTS OF CONTACT ITEM / SUBJECT REFERENCE POINT OF CONTACT FSAR Chap 14 in Place Lic Coord, Buster Bilyeu X-451 Tech Specs In Place Lic Coord, Buster Bilyeu, X-451 Engineering Specs Supt SES, Doug Rickeard, X-288 Vendor Tech Manuals Supv Records, Ed DeWandel, X-217 Design & Instln Drawings DC Eng, Don Padula, X-277 In Place Procedures In Place (or Indices)
                              " Auto Actuation Reactor Trip Breaker Shunt Trip" Recent Work Orders                                 Supv Eng Plan, Mike Carson, X-500 QA Matters                                         Supv QC, Alan Price, X-254
Admin Asst, John Costello, X-388 Procurement Records Supv, Main Sycs, Dick Mudd, X-447 Design Change for RTS DC 83-26 " Timing DC Eng, Dick, Coupe, X-285 Reliability Circuit Rx Trip Breakers" DC 84-06 & DC 84-07
:    EQPT Classification                               Supv SES, Doug Rickeard, X-288 irs, LERs                                         Supv SES, Doug Rickeard, X-288 Copy of Response         In Place                 Lic Coord, Buster Bilyeu, X-451 PM Demonstration                                   Supt Maint, Wayne Kibler, X-214 Maint Schedules                                   Elect Eng, Joe DeMarco, X-557 QA Audit Schedules                                 Supv QC, Alan Price, X-254 Off-Site Contact                                   Richmond,   Dave Speidell, 81-4045 Richmond, Bob Nicholls, X-410
" Auto Actuation Reactor Trip Breaker Shunt Trip" Recent Work Orders Supv Eng Plan, Mike Carson, X-500 QA Matters Supv QC, Alan Price, X-254 EQPT Classification Supv SES, Doug Rickeard, X-288 irs, LERs Supv SES, Doug Rickeard, X-288 Copy of Response In Place Lic Coord, Buster Bilyeu, X-451 PM Demonstration Supt Maint, Wayne Kibler, X-214 Maint Schedules Elect Eng, Joe DeMarco, X-557 QA Audit Schedules Supv QC, Alan Price, X-254 Off-Site Contact
                                        -}}
: Richmond, Dave
: Speidell, 81-4045 Richmond, Bob Nicholls, X-410
-}}

Latest revision as of 09:01, 10 December 2024

Advises of Planned Special Insp on 860707-11 of Actions Taken Per Generic Ltr 83-28 Re post-trip Review,Equipment Classification & Vendor interface,post-maint Testing & Reactor Trip Sys Reliability.Supporting Info Encl
ML20198S836
Person / Time
Site: Catawba  
Issue date: 05/23/1986
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
References
GL-83-28, NUDOCS 8606100575
Download: ML20198S836 (4)


Text

' O {%%

s L

MAY 2 s m Duke Ppwer Company ATTN:gMr.H.B. Tucker,VicePresident Nuclear Production Department 422 South Church Street Charlotte, NC 28242 Gentlemen:

SUBJECT:

GENERIC LETTER 83-28 INSPECTION AT CATAWBA NUCLEAR PLANT This letter is to inform you of our plans to conduct a special inspection of your actions as a result of Generic Letter 83-28, Required Actions Based on Generic Implication of Salem ATWS Events.

The actions covered by this letter fall into the following four areas:

1.

Post-Trip Review 2.

Equipment Classification and Vendor Interface 3.

Post-Maintenance Testing 4.

Reactor Trip System Reliability The inspection will be conducted at your Catawba plant during the period of July 7-11, 1986, by a four-member team led by Mr. Norman Merriweather of this office.

During our inspection we normally review procedures and documentation associated with the four areas listed above.

It would be appreciated if information appli-cable to these areas be readily available for our inspector's use.

For informa-tion not available at the site, we request that the team be notified upon their arrival so further arrangements can be made.

We have found it helpful if information (similar to enclosures) is provided which identifies applicable procedures, licensee contacts, and telephone numbers of those who are familiar with the licensees' effort in each of the categories listed in the Generic Letter.

Additionally, our team will observe selected portions of safety-related mainte-nance that may be scheduled or in progress during the period which they are at the site.

The team will request to observe the performance of your maintenance procedure for the Reactor Trip Breakers or other breakers of the same type by knowledgeable maintenance personnel.

Where this is not feasible, our team will ask for a " walk-through" demonstration.

$j61jjyCK05000413 75 860523 G

PDR 1

pol f l

MAY 3 8 g Duke Power Company 2

Your cooperation' in making your records and staff available to support this inspection is appreciated.

Any questions you may have or coordination efforts you would like to clarify should be referred to Mr. T. Peebles of our office.

Sincerely,

/s/

Virgil L. Brownlee, Chief Reactor Projects Branch 3 Division of Reactor Projects

Enclosures:

1.

Sample Outline of Generic Letter 83-28 with Cognizant Personnel and Applicable References 2.

Sample of Other Documentation and Points of Contact pc w/encls:

A. L. Dick, Vice President -

f Construction V J. W. Hampton, Station Manager

/ ec w/encls:

b K. N. Jabbour, NRR

/NRCResidentInspector

,/ Document Control Desk

/ State of South Carolina Qi RI

/

RII RII lg (A

NMerriwea(her:pj TCon on AHe dt VBrownlee 5/pl/86 5/g /86 5/gy86 5/03/86

ENCLOSURE 1 SAMPLE OUTLINE OF GENERIC LETTER 83-28 WITH COGNIZANT PERSONNEL AND APPLICABLE REFERENCES GL 83-28 ITEM / SUBJECT REFERENCE POINT OF CONTACT 1.1 Post Trip Review ADM-14 Supt Ops, Dave Christian, X-215 Supv SES, Doug Rickeard, X-288 1.2 Data and Info Response to Supv SES, Doug Rickeard, X-288 Capability GL 83-28 2.1A EQPT Class (RTS)

ADM-73 Supv SES, Doug Rickeard, X-288 2.1B Vendor Interface ADM-93 Supv Records, Ed DeWandel, X-217 ADM-66 Supv Records, Ed DeWandel, X-217 ADM-48 Lic Coord, Buster Bilyeu, X-451 2.2.1 EQPT Class (All)

ADM-73 Supv, SES, Doug Rickeard, X-288 ADM-79 Supv Eng Plan, Mike Carson, X-500 ADM-86 Supt Maint, Wayne Kibler, X-214 ADM-61.3 Supv Maint Svce, Dick Mudd, X-447 2.2.2 Vendor Interface ADM-93 Supt Records, Ed DeWandel, X-217 DM-73 Supt SES, Doug Rickaerd, X-288 3.1 Post Maint Testing PC-DB-E/A1 Elect Eng, Joe DeMarco, X-557 3.2 Post Maint Testing ADM-89 Elect Eng, Joe DeMarco, X-557 ADM-89.7 Elect Eng, Joe DeMarco, X-557 ADM-89.8 Elect Eng, Joe DeMarco, X-557 ADM-86 Supt Maint, Wayne Kibler, X-214 4.1 Rx Trip System PT-27.1 Elect Eng, Joe DeMarco, X-557 Reliability 4.2 Rx Trip System PC-DB-E/A1 Elect Eng, Joe Demarco, X-557 Reliability PT-8.2 & 8.2 Supt Tech Sycs, Mike Kansler, X-27 PT-2.34 Supt Tech Svce, Mike Kansler, X-27 4.2.3&4 Life Cycle Testing W OG Due to Richmond, Bob Nichols, X-450 utilities by 10/18/84 4.3 Auto Shunt Trip Mod Elect Eng, Joe DeMarco, X-557 Auto Shunt Trip Testing Supt Projects, Gene Grecheck, X-204

ENCLOSURE 2 OTHER DOCUMENTATION AND POINTS OF CONTACT ITEM / SUBJECT REFERENCE POINT OF CONTACT FSAR Chap 14 in Place Lic Coord, Buster Bilyeu X-451 Tech Specs In Place Lic Coord, Buster Bilyeu, X-451 Engineering Specs Supt SES, Doug Rickeard, X-288 Vendor Tech Manuals Supv Records, Ed DeWandel, X-217 Design & Instln Drawings DC Eng, Don Padula, X-277 In Place Procedures In Place (or Indices)

Admin Asst, John Costello, X-388 Procurement Records Supv, Main Sycs, Dick Mudd, X-447 Design Change for RTS DC 83-26 " Timing DC Eng, Dick, Coupe, X-285 Reliability Circuit Rx Trip Breakers" DC 84-06 & DC 84-07

" Auto Actuation Reactor Trip Breaker Shunt Trip" Recent Work Orders Supv Eng Plan, Mike Carson, X-500 QA Matters Supv QC, Alan Price, X-254 EQPT Classification Supv SES, Doug Rickeard, X-288 irs, LERs Supv SES, Doug Rickeard, X-288 Copy of Response In Place Lic Coord, Buster Bilyeu, X-451 PM Demonstration Supt Maint, Wayne Kibler, X-214 Maint Schedules Elect Eng, Joe DeMarco, X-557 QA Audit Schedules Supv QC, Alan Price, X-254 Off-Site Contact

Richmond, Dave
Speidell, 81-4045 Richmond, Bob Nicholls, X-410

-